How to Price a Full House Renovation: Labour, Materials and Margin Guide
Pricing a whole-house renovation: 2026 benchmark bands (cosmetic refurbishment £600–£1,000/m², back-to-brick full renovation £1,200–£2,000/m², structural or loft work £2,000–£3,000/m², London and South East plus 15–30%), a 3-bed semi at £100,000–£170,000 over 12–20 weeks; room-by-room scope with provisional sums for kitchen and bathroom, pre-price survey (asbestos refurbishment and demolition survey to HSG264 under the Control of Asbestos Regulations 2012 for pre-2000 houses, structure, damp, services, roof), trade-by-trade build-up in build sequence, itemised preliminaries at 8–15% (skips, scaffold, welfare under CDM 2015, supervision, fees), visible contingency of 10–20% by house age drawn against written variations, 15–25% margin, worked example at £1,400/m², stage payments leading cost, JCT Home Owner contract, Consumer Rights Act 2015, 14-day cancellation under the Consumer Contracts Regulations 2013, VAT at 20% with the 5% reduced rate for two-year-empty dwellings under VAT Notice 708, Party Wall Act notices and Building Regulations routes.