Summary
Plastering is one of the few trades where customers still ask for a day rate first, because the work is visible, physical and measured in rooms. That is also why plasterers tend to under-price. A day on the trowel looks like a day's work; the hour spent sheeting up and masking, the hour spent cleaning tools and the van, the quoting visit the evening before and the unpaid drive to the merchant for another bag of Multi-Finish do not. A plasterer charging £180 a day and doing three rooms a week is often earning less, once materials are chased and the van is paid for, than the labourer on a site next door under the Construction Industry Joint Council (CIJC) rates.
The market is also distorted by the per-metre rates that get quoted on forums and in customer-facing price comparison sites. A rate of £12/m² for a skim sounds reasonable until it is applied to a 10 m² box room with two windows, a door, a radiator to drop and a ceiling with a cracked Artex finish — the per-metre figure assumes big open walls and a sound background, and small, awkward or badly prepared rooms need a minimum charge or a day rate instead. This guide builds the day rate from costs, shows 2026 market figures by region, converts the day rate into per-metre and per-room prices that pay, and explains where to use each.
For the method across all trades see pricing labour; for converting between day and hourly rates see day rate to hourly rate calculator; for the quantities behind a materials quote see plaster quantities.
Key Facts
- Day rate, 2026 — £200–£300 regionally; £250–£350 South East; £300–£420 London. Top of the range is for spreads with their own labourer, specialist skills (lime, Venetian, external render systems) or a strong local reputation
- Hourly equivalent — £30–£60; derived by dividing the day rate by 6.5–7 billable hours, not 8
- Skim over plasterboard, labour only — £15–£25/m² walls, £18–£30/m² ceilings; includes scrim, beads and two coats of finish, excludes boarding
- Float and set (two-coat) on blockwork or brick — £25–£45/m² labour; see wet or dry plaster for where it is still the right choice
- Bonding and skim over existing plaster or Artex — £22–£40/m²; see skim over artex and old surfaces
- Sand and cement render, external — £35–£60/m² labour for a two-coat render with beads, more for scratch-and-top with a scraped or textured finish; see sand cement render
- Dot and dab plasterboard — £12–£20/m² labour plus boards; skim on top is extra; see dot and dab
- Per-room price points — small bedroom walls and ceiling skim £350–£600; medium living room £500–£900; hallway, stairs and landing £600–£1,100 with tower; see skim plaster pricing guide
- Minimum charge — £150–£250 for a half-day or a single patch job; a plasterer who does a £60 patch for £60 has paid to be there
- Billable days per year — 200–215 after holidays, weather, quoting, sickness and chasing payment
- Materials markup — 15–25% on trade cost; Multi-Finish is 2–3 bags per average room, sold on the quote at retail-equivalent, not trade
- Labourer — a mixing labourer at £120–£160 a day roughly doubles output on big rooms and external render; price the pair as one gang rate (£320–£460 regionally)
- Drying time is not billable — but return visits for mist coats or second coats are; see plaster drying times by type
- CIS — on domestic work direct to a homeowner CIS does not apply; on work for a contractor, 20% is deducted from the labour element at source if you are registered, 30% if not; see cis tax explained
- VAT — compulsory registration above £90,000 taxable turnover in any rolling 12 months; domestic customers cannot reclaim it, so a VAT-registered spread at £250 a day is £300 to the customer
- Insurance — public liability £1–£2 million is the market norm; £500–£800 a year for a sole trader; see public liability insurance guide
- Consumer Rights Act 2015, s.51 — where no price is agreed the customer pays a reasonable price; a written day rate, with what it includes, avoids the argument
- Health and Safety at Work etc. Act 1974 and the Work at Height Regulations 2005 — ceilings above 2 m from a hop-up are routine, stairwells need a tower or staircase platform; price the hire
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Charge | Regional (outside London/SE) | South East | London | Notes |
|---|---|---|---|---|
| Day rate, single spread | £200–£300 | £250–£350 | £300–£420 | 6.5–7 billable hours |
| Day rate, spread + labourer (gang) | £320–£460 | £380–£520 | £440–£600 | Big rooms, render, boarding |
| Hourly equivalent | £30–£45 | £38–£55 | £45–£60 | For small works only |
| Half-day / minimum charge | £150–£200 | £180–£240 | £200–£280 | Patches, single walls |
| Skim, walls (per m² labour) | £15–£22 | £18–£25 | £22–£30 | Sound plasterboard background |
| Skim, ceilings (per m² labour) | £18–£26 | £20–£30 | £25–£35 | Overhead premium |
| Float and set (per m² labour) | £25–£40 | £30–£45 | £35–£50 | Blockwork or brick |
| Bonding + skim over old plaster/Artex (per m²) | £22–£35 | £25–£40 | £30–£45 | Asbestos check first on pre-2000 Artex |
| Sand and cement render, 2-coat (per m² labour) | £35–£50 | £40–£55 | £45–£60 | Plus scaffold or tower |
| Dot and dab boards (per m² labour) | £12–£18 | £14–£20 | £16–£24 | Boards extra |
| Small bedroom, walls + ceiling skim (all-in) | £400–£650 | £500–£750 | £600–£900 | Materials included |
| Hall, stairs and landing skim (all-in) | £650–£1,100 | £800–£1,300 | £1,000–£1,600 | Includes tower hire |
Detailed Guidance
Building the day rate from your costs
Work forwards from what the business costs, not backwards from what the plasterer down the road charges. A sole-trader plasterer outside London:
| Item | Annual figure |
|---|---|
| Target income before tax | £36,000 |
| Van: finance or depreciation, insurance, tax, servicing, work fuel | £6,500 |
| Public liability insurance | £600 |
| Tools, trowels, mixers, hop-ups, replacement and repair | £1,200 |
| Tower hire allowance not recovered on jobs | £500 |
| Phone, accountant, software, bank charges | £1,800 |
| Workwear, PPE, FFP3 masks for sanding and mixing | £300 |
| Advertising, website, trade directory listings | £900 |
| Pension contribution | £2,400 |
| Total to recover | £50,200 |
Divide by billable days. A plasterer who works 46 weeks but loses a day a week to quoting, materials runs, rained-off external work and chasing payment has roughly 205 billable days: £50,200 ÷ 205 = £245 a day. That is the break-even day rate for a £36,000 income. Charge £200 and the income falls to about £27,000 before tax; charge £300 and it rises to about £47,000. Those two numbers are the whole argument for not pricing by what the competition says.
Note what is missing from the table: materials. Plaster, beads, scrim, PVA and bonding are passed through on each quote at cost plus 15–25%, never absorbed into the day rate. A spread who "includes materials" in a £220 day rate has given away £30–£60 a day.
Converting the day rate into per-metre prices
Customers compare per-metre figures, so you need yours to reconcile with the day rate. The arithmetic is output-based:
| Task | Realistic output per spread per day | Day rate £245 ÷ output | Charge (with minimum) |
|---|---|---|---|
| Skim over sound plasterboard, walls | 25–35 m² | £7–£10/m² | £15–£22/m² |
| Skim, ceilings | 20–25 m² | £10–£12/m² | £18–£26/m² |
| Float and set, blockwork | 10–14 m² | £17–£25/m² | £25–£40/m² |
| Bonding + skim over old plaster | 12–18 m² | £14–£20/m² | £22–£35/m² |
| Sand and cement render, 2 coats | 8–12 m² | £20–£30/m² | £35–£50/m² |
| Dot and dab 12.5 mm boards | 25–40 m² | £6–£10/m² | £12–£18/m² |
The gap between the two right-hand columns is deliberate. The day-rate-divided-by-output figure assumes a full day of uninterrupted spreading on a clean background. Real rooms have reveals, boxed pipes, radiators, sockets to cut around, a ceiling rose and a day that starts with sheeting up. The per-metre charge carries the prep, the beads and the cleaning down; the day rate only carries the hours. If a job is small enough that the per-metre total falls below the half-day minimum, charge the minimum.
Worked example — 3.6 m × 3.2 m bedroom, 2.4 m ceiling, skim over existing sound plaster, one window, one door:
Walls: perimeter 13.6 m × 2.4 m = 32.6 m²
less window 1.8 m² and door 1.7 m² = 29.1 m²
Ceiling: 3.6 × 3.2 = 11.5 m²
Labour: 29.1 m² × £18 = £524
11.5 m² × £22 = £253
£777
Materials: 3 bags Multi-Finish £30, PVA £8,
scrim and beads £20, sheeting £10 £68 (+20% = £82)
Quote: £859 (approx 1.5 days)
At £245 a day that 1.5-day job returns £368 for the labour as a day rate; sold per metre it returns £777. The difference is the prep, the two coats, the trowelling up at the end and the fact that a bedroom and a half rarely fits neatly into a day and a half. Both are legitimate; per metre is what the market expects and it pays better on domestic rooms.
When to use the day rate instead
Day rate is the right basis when the quantity cannot be measured in advance or the customer controls the scope:
- Working for a builder on site — the builder sets the programme, the background is theirs and the day rate is the only honest figure. Agree the gang rate, the start time, what happens if the boards are not up when you arrive (a wasted-visit charge of a half day), and CIS status in writing
- Patch repairs and making good — a dozen patches around a rewire are a day's work with no sensible per-metre figure; see patch repairs
- Investigative work — hacking off blown plaster to find what is underneath; charge a day rate for the hack-off and price the reinstatement once the background is known
- Lime and conservation work — slow, multi-visit and dependent on drying between coats; day rate plus return visits, never per metre; see lime plaster
State in writing that a day is 7.5 hours on site including breaks, that the rate excludes materials, skip and access equipment, and that a day started is a day charged. Without that, "day rate" means whatever the customer decides it means at invoice time.
Regional and seasonal pricing
The regional spread in the tables is about 40% from the cheapest regions (North East, Wales, parts of the Midlands) to London. The driver is the same cost base — van, insurance, fuel — against very different housing stock and demand. London plasterers also carry parking (£15–£40 a day in inner boroughs, which goes on the quote as a disbursement), ULEZ charges on older vans and congestion charge inside the zone.
Seasonally, external render is a March-to-October trade; Portland cement render should not be applied below 5°C or when frost is forecast within 24 hours, and lime render needs 10°C or more. A spread who relies on external work needs a higher summer day rate to carry the winter, or an internal workload lined up for it. Winter internal work also dries slowly in unheated properties, so build return visits into the quote rather than waiting on site.
Employed rates for context
Customers who have seen "plasterer salary £30,000" on a jobs site are looking at an employed figure. The CIJC Working Rule Agreement sets the general operative and skilled rates that site plasterers are paid under, and an employed plasterer on a large site typically earns £15–£20 an hour in 2026, with holiday pay, pension and employers' NI on top paid by the employer. A self-employed plasterer's day rate has to fund all of that plus the van, tools, insurance and the unpaid days. The two figures describe different jobs and should never be compared directly.
Quoting, deposits and payment
Give a written quote for every domestic job, even a half-day, listing the rooms or areas, the system (skim, bonding and skim, render), what preparation is included, what is excluded (moving furniture, removing wallpaper, mist coating), the materials allowance and the day rate for any extras. Take a 25–50% materials deposit on anything over £500 and invoice on completion with 7-day terms. Where the customer wants to supply the plaster, say no: open or old bags, wrong product for the background and no comeback if it fails. A written quote is also what the Consumer Rights Act 2015 and the Consumer Contracts Regulations 2013 lean on if there is a dispute; for the 14-day cancellation rules on quotes agreed in the customer's home see quotes vs estimates.
Frequently Asked Questions
Is £250 a day too much for a plasterer?
Not for a competent self-employed plasterer in most of England in 2026. Once the van, insurance, tools, pension and the 50 or so unpaid days a year are taken out, £250 a day on 205 billable days produces an income before tax in the mid-£30,000s — a reasonable return for a skilled trade. It only looks high if it is compared with an employed hourly wage that has none of those costs in it.
Should I quote per metre or per day?
Per metre (or per room) for domestic work where you can measure the job and control the background — it pays better and it is what customers can compare. Day rate for site work for builders, for patches and making good, for investigative hack-off and for any job where the customer controls the scope. Whichever you use, put it in writing with what it includes.
How many square metres can a plasterer skim in a day?
A good spread working alone will skim 25–35 m² of wall or 20–25 m² of ceiling in a day over a sound plasterboard background, which is roughly a medium bedroom's walls and ceiling. With a labourer mixing and keeping the boards up, 40–50 m² is achievable on open walls. Output halves on float-and-set over blockwork and drops further on rooms with lots of reveals and services.
Do I need to charge VAT on plastering?
Only if your taxable turnover goes over £90,000 in any rolling 12 months, at which point registration is compulsory. Most sole-trader plasterers are below the threshold. If you are close to it, remember that domestic customers cannot reclaim VAT, so registering effectively makes you 20% dearer to them overnight; see vat registration for tradespeople.
What should I charge a builder for day work?
Agree a gang rate rather than a single rate if you bring a labourer — £320–£460 a day regionally for a spread and labourer, more in London. Confirm whether it is CIS-deductible, what the start time is, that the background will be ready, and that a wasted visit is charged at half a day. Builders pay slower than homeowners; 30-day terms are normal, so the rate needs to carry that.
Regulations & Standards
Consumer Rights Act 2015 (s.49–s.52) — services must be performed with reasonable care and skill; where no price is agreed, a reasonable price is payable
Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 (SI 2013/3134) — 14-day cancellation right for contracts agreed in the customer's home; written pre-contract information required
Income Tax (Construction Industry Scheme) Regulations 2005 (SI 2005/2045) — deduction at source from labour payments by contractors to subcontractor plasterers
Value Added Tax Act 1994 — compulsory registration threshold £90,000 (from 1 April 2024)
Health and Safety at Work etc. Act 1974 — general duties for self-employed tradespeople whose work could affect others
Work at Height Regulations 2005 (SI 2005/735) — applies to stairwell and high-ceiling work from towers and platforms
Control of Substances Hazardous to Health Regulations 2002 (SI 2002/2677) — gypsum and cement dust, wet cement skin contact; respirable protection when sanding
Control of Asbestos Regulations 2012 (SI 2012/632) — textured coatings applied before 2000 may contain chrysotile; test before skimming over or removing
BS EN 13914-2:2016 — design, preparation and application of internal plastering
BS EN 13914-1:2016 — external rendering
BS 8481:2006 — design, preparation and application of internal gypsum plaster systems
Construction Industry Joint Council Working Rule Agreement — employed site rates for skilled operatives, for context only
Consumer Rights Act 2015, Part 1 Chapter 4 — services — reasonable price and reasonable care and skill
HMRC — Construction Industry Scheme (CIS) — who must register and deduction rates
HMRC — VAT registration thresholds — £90,000 compulsory threshold
HSE — Work at height — towers, platforms and the 2005 Regulations
HSE — Asbestos: textured decorative coatings — asbestos essentials task sheets for textured coatings
British Gypsum — Site Book — coverage rates and application guidance for Thistle plasters
pricing labour — the cost-based pricing method across all trades
day rate to hourly rate calculator — converting between day rate, hourly rate and billable hours
skim plaster pricing guide — per-room skim prices with worked examples
full house plaster pricing guide — pricing a whole-house replaster
plaster quantities — bags per room and coverage rates
plaster drying times by type — drying times that determine return visits
cis tax explained — CIS deductions when working for builders
painter decorator day rate guide — the equivalent guide for decorators, often the next trade in