Summary
A bathroom fitter is a multi-trade: plumber for the first and second fix, tiler for the walls and floor, carpenter for the boxing-in and the floor, decorator for the ceiling and the woodwork, and project manager for the electrician and the glazier. That is why the day rate sits above a single-trade rate and why the fixed price for a refit is the figure most customers actually compare. The trap is pricing a bathroom from a per-item list (£300 to fit a bath, £150 for a basin, £250 for the toilet) and discovering that the strip-out took a day because the old tiles were on sand and cement, the floor needed a layer of ply and a self-levelling compound before any tile went down, and the shower wall needed tanking that nobody allowed for.
The day rate is where the real costs live: the van, the tools, the public liability, the holidays, the days quoting and the days waiting for an electrician. Convert it to a fixed price only once you have surveyed the room and counted the days, with the preparation and the specialist items priced as their own lines. This guide builds the 2026 day rate, gives the regional figures, shows how it converts to a fixed price for the common bathroom sizes, lists the items that should always be separate lines, and works a standard family bathroom refit through to a quote. For the per-room cost detail see full bathroom installation pricing guide and bathroom tiling pricing guide; for the general method see pricing labour and day rate to hourly rate calculator.
Key Facts
- Day rate, 2026 — £220–£320 regionally; £270–£380 South East; £320–£450 London. Top of range for wet rooms, large-format tiling and fitters who manage the whole job including the electrician and the glazier
- Hourly equivalent — £35–£65, the day rate divided by 6.5–7 billable hours; use it only for repairs and small works
- Half-day minimum — £150–£220; a tap change, a toilet swap or a silicone reseal is a half-day with travel and a return visit for anything that needs to cure
- Full refit, labour only — £3,500–£6,500 regionally for a 2.0 × 2.5 m family bathroom, 6–10 days; £5,000–£9,000 in London
- En-suite, labour only — £2,500–£4,500, 4–7 days; see en suite pricing guide
- Wet room, labour only — £4,500–£8,000, 8–12 days, with the tanking and the floor former as the critical path; see wet room installation guide
- Strip-out — half a day to a full day; sand and cement tiles on brick, a cast-iron bath and a concrete floor push it to a day and a half; skip £250–£400 or two trips to the tip
- First fix plumbing — 1–2 days to move the waste and supply runs for a new layout; a like-for-like layout is half a day. Wastes to BS EN 12056-2: 32 mm basin, 40 mm bath and shower, 110 mm WC, with 1:40 minimum falls on 40 mm
- Tiling output — 6–10 m² a day on walls for standard 300 × 600 mm porcelain, 8–12 m² on floors, falling to 4–6 m² for mosaics, herringbone or large-format; 20–25 m² of walls in a family bathroom is 3–4 days
- Floor preparation — 6 mm or 9 mm WBP ply screwed at 150 mm centres over floorboards, or a cement backer board, then primer and 3–5 mm of self-levelling compound: £15–£30 per m² supplied and fitted, half a day for a small floor
- Tanking — a liquid or sheet tanking system to the shower area and 100 mm up all walls is required for a wet room and good practice behind any shower enclosure on plasterboard; £150–£300 for an enclosure, £400–£800 for a wet room floor and walls; see bathroom waterproofing tanking
- Electrics — a bathroom is a special location under Section 701 of BS 7671:2018+A2:2022, with zones, 30 mA RCD protection on all circuits and IP ratings for fittings; new circuits and shower circuits are Part P notifiable. Subcontract to a registered electrician at £250–£400 a day plus the certificate, or build the electrician's price in with a 10–15% handling margin
- Electric shower — 8.5–10.5 kW on a dedicated circuit (10 mm² for most runs) with a 45 A or 50 A protective device and a double-pole pull-cord switch; £250–£450 to install where the circuit exists, £450–£750 for a new circuit
- Extractor fan — Approved Document F requires 15 l/s intermittent or 8 l/s continuous extract in a bathroom; £150–£300 to fit a fan with a ducted outlet, more for an inline fan in the loft; see bathroom extractor fan guide
- Materials markup — 15–25% on adhesive, grout, trims, backer board, tanking, pipe and fittings, silicone, fixings; sanitaryware and tiles often customer-supplied, but if you supply them, 15–25% on trade cost plus delivery
- Wastage — 10% on straight-lay tiles, 15–20% on diagonal, herringbone or large-format; state the percentage on the quote
- Billable days — 200–215 a year after holidays, quoting, surveys, returns for snagging and the days lost to late deliveries of sanitaryware
- Insurance — public liability £1–£2 million, £500–£900 a year; many fitters add £5,000–£10,000 of tools cover
- Consumer Rights Act 2015, s.49 and s.51 — the service must be carried out with reasonable care and skill and, where no price is agreed, at a reasonable price; a written fixed price with the preparation stated protects both sides
- VAT — compulsory registration above £90,000 turnover; a fitter who supplies sanitaryware and tiles reaches it far sooner than one who supplies labour only
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Charge | Regional (outside London/SE) | South East | London | Notes |
|---|---|---|---|---|
| Day rate, bathroom fitter, own tools | £220–£320 | £270–£380 | £320–£450 | 6.5–7 billable hours |
| Hourly equivalent | £35–£50 | £40–£58 | £48–£65 | Repairs only |
| Half-day minimum | £150–£220 | £180–£250 | £200–£300 | Tap, toilet, reseal |
| Full family bathroom refit, labour | £3,500–£6,500 | £4,200–£7,500 | £5,000–£9,000 | 6–10 days |
| En-suite refit, labour | £2,500–£4,500 | £3,000–£5,200 | £3,600–£6,500 | 4–7 days |
| Wet room, labour | £4,500–£8,000 | £5,200–£9,000 | £6,500–£11,000 | 8–12 days |
| Strip-out, including disposal | £300–£700 | £350–£800 | £450–£1,000 | Skip or tip runs |
| Floor preparation (ply and levelling), per m² | £15–£30 | £18–£34 | £22–£40 | Plus primer |
| Tanking a shower enclosure | £150–£300 | £180–£340 | £220–£400 | Liquid or sheet system |
| Wall tiling, standard porcelain, per m² | £35–£60 | £40–£65 | £50–£80 | Labour only |
| Floor tiling, standard porcelain, per m² | £40–£70 | £45–£75 | £55–£90 | Labour only |
| Bath fitted, like-for-like, with panel | £250–£400 | £300–£450 | £350–£550 | Including waste and trap |
| Shower enclosure and tray fitted | £350–£600 | £400–£700 | £500–£850 | Tray bedded, screen sealed |
| Close-coupled WC fitted | £150–£250 | £170–£280 | £200–£350 | Like-for-like position |
| Electric shower on new circuit (electrician) | £450–£750 | £500–£850 | £600–£1,000 | Part P certificate included |
Detailed Guidance
Building the day rate from your costs
Start with what the year costs before you earn anything. A typical self-employed bathroom fitter's overheads in 2026 look like this:
| Annual cost | Typical figure |
|---|---|
| Van finance or depreciation, insurance, tax, fuel, servicing | £7,500–£10,500 |
| Tools, tile cutter, consumables, replacements | £1,500–£2,500 |
| Public liability and tools insurance | £600–£1,100 |
| Phone, software, quoting app, accountancy | £1,200–£2,000 |
| Training, trade memberships, certification | £300–£800 |
| Workwear, PPE, first aid | £250–£500 |
| Total overheads | £11,350–£17,400 |
Add the income you need to live on and to fund a pension and holidays, say £42,000–£55,000 for an experienced fitter, and divide by billable days. A fitter who works 46 weeks loses days to quoting, surveys, snagging visits and the morning the sanitaryware arrives damaged; 200–215 billable days is realistic. At £14,000 overheads and £48,000 income over 210 days the rate is £295 a day before profit, which is why the regional range starts above £220 and why anyone charging £180 is subsidising the customer out of their own pension.
Converting the day rate to a fixed price
Customers want a fixed price for a refit, and a fixed price is only safe when it is built from counted days plus separately priced risks. Survey the room and count:
| Stage | Like-for-like layout | New layout |
|---|---|---|
| Strip-out and disposal | 0.5–1 day | 1–1.5 days |
| First fix plumbing, waste and supply | 0.5 day | 1–2 days |
| Floor preparation, boxing-in, studwork | 0.5 day | 0.5–1 day |
| Tanking and curing | 0.5 day | 0.5 day |
| Wall tiling (20–25 m²) | 3–4 days | 3–4 days |
| Floor tiling (4–6 m²) | 0.5–1 day | 0.5–1 day |
| Second fix: bath, WC, basin, shower, screen | 1–1.5 days | 1–1.5 days |
| Decorating, silicone, snagging | 0.5–1 day | 0.5–1 day |
| Total | 7–9.5 days | 8.5–12 days |
Multiply by the day rate, add the electrician's price with a handling margin, add materials at trade cost plus 15–25%, and add 10–15% contingency on a pre-1980 house where the floor and the walls are unknown until the tiles come off. The common mistakes are counting the tiling at a per-metre rate that assumes a flat wall and a straight layout, and forgetting the day lost between grouting and fitting the screen, or between tanking and tiling, which the fixed price has to carry even if you fill it with another job.
Lines that should always be separate on the quote
Some items vary so much between bathrooms that bundling them into the fixed price loses money on half the jobs and overcharges the other half. Price these as their own lines, with a stated assumption and a stated rate for variation:
- Floor preparation: "6 mm ply and self-levelling compound to 5 m², £120; additional levelling at £20 per m² if the floor is more than 10 mm out"
- Tanking: "Tank shower area and 100 mm upstand, £220"; a customer who does not want to pay for tanking behind a shower on plasterboard should have the refusal in writing
- Electrical work and certification: the electrician's figure as a named line with the Part P certificate, so that a request for extra spotlights is a clear extra
- Wall and floor condition: "Assumes walls are sound after strip-out; replacing blown plaster or plasterboard at £45 per m²"
- Tile wastage: the percentage and who buys the extra
- Disposal: skip or tip runs as a line, because the customer may want to keep the skip for a week
- Sanitaryware supply: whether you supply it, the markup if so, and the warranty position if the customer supplies it and it is damaged or wrong
Tiling: where the fixed price goes wrong
The tiling is half the days on most refits and the part most likely to blow out. Output depends on tile size, layout and the number of cuts, and a bathroom is nearly all cuts: around the bath, the window reveal, the boxed soil pipe, the niche, the door frame. Standard 300 × 600 mm porcelain on a plain wall runs at 8–10 m² a day; the same tile in a bathroom with a niche and a window is 6–7 m². Herringbone or a 45° layout adds 30–50% to the labour and 15–20% to the wastage. Large-format tiles over 600 mm on one side need a flat substrate (3 mm in 2 m) and two people for anything over 1200 × 600 mm.
Substrate rules decide the preparation: BS 5385-1 limits tiling onto plaster skim to around 20 kg/m² including adhesive, direct onto plasterboard to 32 kg/m², and allows 50–60 kg/m² on cement backer board. A 10 mm porcelain is 22–25 kg/m² with adhesive, which rules out skim and makes backer board the safe choice in a shower area. Wet areas must follow BS 5385-4:2015, with tanking over plasterboard and movement joints at the internal corners and the perimeter. Put the backer board and tanking on the quote as lines; see tile backer board guide and wall tiling pricing guide.
Electrics in a bathroom: who does what
Unless you are a registered electrician, every new circuit, every shower circuit and most alterations in a bathroom are Part P notifiable and need a certificate from someone who is. The practical arrangement is to subcontract a registered electrician for the first fix (shower cable, fan, lighting, shaver socket) and the second fix and certification, and to carry their price in the quote with a 10–15% handling margin for the coordination and the risk. Section 701 of BS 7671 sets the zones: no switches or sockets other than shaver units within 3 m of the bath or shower edge, IPX4 fittings in zone 1 and 2, and 30 mA RCD protection on every circuit in the room. Downlights in zone 1 must be IPX4 and rated for the zone; a 12 V SELV fitting is the safest choice above a shower. See bathroom zones and ip ratings for the zone diagram.
Worked example: family bathroom, like-for-like layout, Midlands
A 2.1 × 2.4 m bathroom in a 1970s semi: strip out a bath, basin, WC and tiles on plasterboard, fit a new bath with a shower over, a glass bath screen, a basin and a close-coupled WC in the same positions, tile 22 m² of walls in 300 × 600 mm porcelain and 5 m² of floor, replace the extractor fan, and decorate the ceiling and the door. The customer supplies the sanitaryware and tiles.
| Item | Days | Cost |
|---|---|---|
| Strip-out and two tip runs | 1 | £300 |
| First fix: new waste for bath, supply extensions, check 22 mm feed | 0.5 | £150 |
| 6 mm ply and levelling compound to 5 m² floor | 0.5 | £150 + £110 materials |
| Tank shower end of bath, two walls to 1.8 m, 100 mm upstand | 0.5 | £150 + £85 materials |
| Wall tiling 22 m² with bath, window and niche cuts | 3.5 | £1,050 |
| Floor tiling 5 m² | 0.5 | £150 |
| Second fix: bath, screen, basin, WC, shower valve, wastes, traps | 1.5 | £450 |
| Decorating ceiling and door, silicone, snagging | 0.5 | £150 |
| Adhesive, grout, trims, backer, silicone, fixings, pipe and fittings at trade + 20% | £520 | |
| Electrician: new fan on timer, two downlights, certificate (subcontract £420 + 12%) | £470 | |
| Subtotal (8.5 days at £300 plus materials and subcontract) | £3,735 | |
| Contingency 10% (wall condition behind old tiles) | £374 | |
| Fixed price, labour and materials, excluding sanitaryware and tiles | £4,109 |
Round it to £4,100, state the assumptions (walls sound, floor within 10 mm, customer-supplied sanitaryware on site by day one), and stage the payment: 25% on booking, 50% at the end of tiling, the balance on completion. The same job in London would be £5,600–£6,200.
Frequently Asked Questions
Should I charge a day rate or a fixed price for a bathroom refit?
A fixed price, built from counted days and separately priced risks, for any full refit. Customers will not commit to an open-ended day rate for a job that empties the only bathroom in the house, and a day rate rewards the fitter for being slow. Keep the day rate for what it is good at: small repairs, works of unknown extent (a leak under a floor), and the variation rate on the fixed-price quote. State both on the quote so the customer can see how an extra is calculated.
Can I fit the electric shower myself?
Only the plumbing. The shower circuit, the pull-cord switch and the connection are notifiable electrical work in a special location, and unless you are registered with a competent person scheme you cannot certify it. Fit the unit and the pipework, and have the electrician connect and certify. A customer whose insurer asks for the Part P certificate after a fault will not be helped by "the bathroom fitter did it".
How many days should a bathroom refit take?
Six to ten days for a family bathroom with a like-for-like layout and one fitter, with the tiling at three to four of those days; eight to twelve with a layout change or a wet room. Anything quoted at three days either has a second person on site, no tiling, or a corner cut. Tell the customer the realistic number and the two days the room is unusable while the tanking and the grout cure, and offer a temporary WC connection if it is the only one in the house.
What do I do if I find rot or a leak after the strip-out?
Stop, photograph it, and price it as a variation before touching it. The contingency in the quote covers blown plaster and a floor slightly out of level, not a rotten joist end or a soil pipe that needs replacing. A written variation with a photograph, a price and the day it adds to the programme is the difference between a paid extra and a dispute. See variation orders explained.
What should I charge for a half-day job like a tap change?
The half-day minimum: £150–£220 regionally. By the time you have travelled, isolated the supply, found the isolation valve does not close, replaced it, fitted the tap and tested it, the morning has gone, and a quoted "£60 to change a tap" is a loss. Tell the customer the minimum covers up to four hours on site and any small extra parts, and that the next hour is at the hourly rate.
Regulations & Standards
BS 5385-1:2018 — wall tiling on internal substrates; weight limits and substrate preparation
BS 5385-3:2024 — floor tiling design and installation
BS 5385-4:2015 — tiling in wet areas; tanking and movement joints
BS 7671:2018+A2:2022, Section 701 — locations containing a bath or shower; zones, IP ratings, RCD protection
Building Regulations 2010, Approved Document P — electrical safety in dwellings; notifiable work in special locations
Building Regulations 2010, Approved Document F — ventilation; 15 l/s intermittent extract from a bathroom
Building Regulations 2010, Approved Document G — sanitation and hot water; G3 for unvented cylinders where a cylinder is fitted
Water Supply (Water Fittings) Regulations 1999 — WRAS-approved fittings, backflow protection on showers and bidets
BS EN 12056-2:2000 — gravity drainage inside buildings; waste pipe sizes and falls
BS EN 14527 and BS EN 14516 — shower trays and baths for domestic use
Consumer Rights Act 2015 — reasonable care and skill; reasonable price
Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 — 14-day cancellation right on contracts agreed in the customer's home
Approved Document P — GOV.UK — notifiable electrical work in bathrooms
Approved Document F — GOV.UK — extract rates for bathrooms
BS 7671 Section 701 overview — IET — bathroom zones and protection
Water Fittings Regulations — WRAS — fittings and backflow requirements
Tiling in wet areas — The Tile Association — BS 5385 guidance for installers
Self-employed tax and allowable expenses — GOV.UK — the overhead items in the rate build-up
full bathroom installation pricing guide — the full refit priced by room size
bathroom tiling pricing guide — tiling labour per m² by tile type
en suite pricing guide — en-suite pricing
day rate to hourly rate calculator — converting rates
pricing labour — the method across trades
bathroom waterproofing tanking — tanking systems and where they are required