Summary

Outside lights are a small job with a high quote-to-conversion rate and a surprising number of ways to lose money. The fitting itself takes twenty minutes to screw to the wall. The cost is in getting a cable to it: drilling through a 300 mm cavity or 450 mm solid wall at the right spot, finding a safe and legal point to take the supply from (a lighting circuit through the wall, a socket circuit via a fused connection unit, or a new circuit), providing a switch the customer can actually reach, and leaving the hole sealed against water and the cable protected from UV. Add a PIR floodlight that the customer wants to override from indoors, or a run of three fittings along a garage, and the simple job has become a half-day with a wiring diagram.

The regulatory position changed in 2013 and many customers (and some installers) have not caught up. In England, "outdoors" ceased to be a special location for Part P purposes, so adding an outside light to an existing circuit is non-notifiable; it still needs to comply with BS 7671 and a Minor Electrical Installation Works Certificate must be issued. A new circuit from the consumer unit remains notifiable. Wales kept a wider definition of notifiable work, so check the Welsh guidance. Scotland is under the Building (Scotland) Regulations and a different regime.

This guide prices the single light from an existing circuit, multiple fittings, PIR floodlights with override, lights fed from a socket circuit via a fused spur, lights on a new circuit, and the common extras: an RCD upgrade where the board has none, a photocell or timer, and remote fittings reached by SWA. For the electrical method see outdoor electrics and outdoor electrical; for fault diagnosis on existing fittings see outdoor lights.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Job Sundries (your cost) Labour time Your cost (labour at £55/h) Customer price (20–30% margin)
One wall light, customer-supplied, spurred from lighting circuit directly behind £15–£30 1–1.5 h £70–£115 £120–£180
One wall light, cable run 3–6 m internally to an existing switch or rose £20–£45 1.5–2.5 h £105–£185 £150–£260
One PIR floodlight with indoor override switch £25–£50 1.5–2.5 h £110–£190 £160–£270
Each additional fitting, same visit, same wall or adjacent £10–£25 0.5–1 h £40–£80 £60–£120
One light spurred from socket circuit via switched FCU with 3 A fuse £25–£50 1.5–2.5 h £110–£190 £160–£270
Three lights along a garage or boundary wall, external cable in conduit or SWA £80–£160 3–5 h £245–£435 £330–£600
New 6 A lighting circuit from consumer unit for outdoor lights (notifiable) £60–£120 + notification 3–5 h £240–£420 £320–£580
Add RCBO to existing unprotected lighting circuit (compatible board) £25–£50 0.75–1.25 h £65–£120 £90–£170
Add RCD FCU instead of board work £30–£50 0.5–0.75 h £60–£90 £80–£130
Supply mid-range IP65 LED wall light £30–£60 — £30–£60 £45–£90
Supply LED PIR floodlight 30 W £30–£70 — £30–£70 £45–£100

Prices are 2024 regional England excluding VAT at 20%. London adds 25–40%. The first fitting carries the call-out, diagnosis, through-wall drilling and certification; additional fittings are marginal labour.

Detailed Guidance

Survey: where does the supply come from?

The quote hinges on the answer, so look before you price. In order of preference:

OUTSIDE LIGHT SUPPLY — DECISION TREE
│
├─ Is there a lighting point (switch, rose or junction box) on the inside
│   face of the wall where the light will go?
│   └─ YES ──> Spur from it; drill through directly; shortest job. Check RCD protection.
│
├─ Is there a lighting point within a few metres with a concealed route
│   (loft, void, under floor)?
│   └─ YES ──> Spur and run internally; add 0.5–1 h per 3 m of awkward route.
│
├─ Is there a socket on the inside face?
│   └─ YES ──> Switched FCU with 3 A fuse, cable through wall. Check load and RCD.
│
├─ Is the consumer unit nearby with a spare way?
│   └─ YES ──> New 6 A lighting circuit on RCBO; notifiable; full EIC.
│
└─ None of the above (remote garage, outbuilding, long run)?
    └─ SWA from house to fitting(s); price as a sub-main job; see armoured cable guide.

While there, check: does the existing circuit have 30 mA RCD protection? Is the consumer unit a plastic board with no RCDs (common pre-2008), a split-load board (one RCD covering some circuits) or an RCBO board? Is the wall cavity, solid or timber frame? Is there render, cladding or an insulated finish that will need sealing? Where will the switch go, and is there a convenient back box?

The single light from a lighting circuit

The standard job. Isolate and prove dead, open the switch or rose, confirm the circuit identity and protective device, drill through from inside at the fitting position with a 10–12 mm bit angled slightly down to the outside, pass 1.0 mm² or 1.5 mm² twin and earth, connect at the switch (taking a switched live and neutral where the switch is a one-way with a loop at the switch, or back at the rose where the loop is at the ceiling), fit the back box or fitting, seal the hole with silicone or a cable gland, test (continuity of the circuit protective conductor, insulation resistance, polarity, earth fault loop impedance, RCD operation), label, issue the MEIWC. Allow 1–1.5 hours for a fitting directly behind an existing point.

If the fitting is to be on its own switch, add a switch back box and a new switch drop, 0.5–1 hour depending on the wall.

PIR floodlights and override

PIR floodlights are the most common request and the most common callback. Price them with an indoor switch: the customer needs to isolate the fitting to change settings and to override it for a party. Mount the fitting at 2–3 m so the detection zone covers the approach without triggering on the road; set the LUX to night-only and the TIME to 1–3 minutes; angle the head so the beam falls on the customer's property, not the neighbour's bedroom. Some fittings offer a "walk test" mode; use it and show the customer. Where the customer wants two or more floodlights to trigger together, use a fitting with a separate PIR and slave outputs, or one PIR controlling a contactor, and price the extra wiring.

Spurring from a socket circuit

Legal and common where the only nearby supply is a socket: a 13 A switched fused connection unit with a 3 A fuse (5 A for larger loads) is mounted indoors, fed from the socket in 2.5 mm², with the light cable outgoing in 1.0 mm² or 1.5 mm². The FCU is the switch and the isolation point. On a ring final circuit, the FCU can be an unfused spur from a socket (one spur per socket) feeding the fused outlet; check the circuit is not already heavily spurred. See spurring off a socket rules.

Multiple fittings and external cable runs

Three fittings along a garage or boundary wall need a loop-in run between them. Internal routing (through the garage) in clipped twin and earth is cheapest. External runs must use UV-stable cable: SWA (glanded at each fitting, £3–£5 per metre for 3-core 1.5 mm²), Hi-Tuff or similar, or standard cable inside UV-stable conduit. Clip at 300 mm centres horizontally and 400 mm vertically, and keep cable off the ground and away from areas where a strimmer or ladder will catch it. Price £6–£10 per metre installed for external SWA including clips and glands, plus 15–20 minutes per gland. See swa cable glanding and termination and armoured cable.

When the board has no RCD

If the lighting circuit is not RCD-protected, you have three options to price: swap the MCB for an RCBO where the board accepts one (£25–£50, under an hour); fit an RCD FCU at the point where the outside light is taken off, protecting only the new work (£30–£50, 30–45 minutes); or recommend a consumer unit replacement (£450–£900, notifiable, a separate quote). The RCD FCU is the pragmatic minimum; the RCBO is better practice; the board change is the right answer where the board is old plastic without any RCDs. Explain all three on the quote; the customer who declines the upgrade has at least been told.

Certification, labelling and the quote

Issue a Minor Electrical Installation Works Certificate for every addition to an existing circuit, with the test results recorded, and label the consumer unit with the circuit change where relevant. For a new circuit, issue an Electrical Installation Certificate and notify. Build the paperwork time into the price: 15–20 minutes per job. Quote a fixed price per fitting with the supply method stated, and list the extras (RCD upgrade, additional switch, external cable per metre, fitting supply) so the customer can add or remove them. Where you supply the fitting, mark it up 30–50% on trade; customers compare fitting prices online, so make the installation line carry the margin instead.

Frequently Asked Questions

Is fitting an outside light notifiable under Part P?

In England, not if it is added to an existing circuit; outdoors has not been a special location since the 2013 edition of Approved Document P. A Minor Electrical Installation Works Certificate must still be issued and the work must comply with BS 7671:2018+A2:2022. A new circuit from the consumer unit is notifiable, as is a consumer unit change. In Wales the 2013 relaxation was not adopted in the same form and more work remains notifiable; check the Welsh Government's Approved Document P. In Scotland, electrical work falls under the Building (Scotland) Regulations and a building warrant may be needed for some work.

Does an outside light need RCD protection?

Yes in practice. Regulation 411.3.4 of BS 7671:2018+A2:2022 requires 30 mA RCD additional protection for AC final circuits supplying luminaires in domestic premises. If the existing lighting circuit is unprotected, adding to it without providing RCD protection leaves the new work non-compliant; fit an RCBO, an RCD FCU at the spur point, or upgrade the board. Record the decision and the customer's choice on the certificate.

Can I use ordinary twin and earth outside?

Only where it is protected from UV and mechanical damage, for example inside a sealed fitting, in UV-stable conduit, or passing directly through the wall into the back of the fitting. Exposed PVC twin and earth on an outside wall becomes brittle and cracks within a few years. Use SWA, a UV-resistant sheathed cable or conduit for any exposed run.

What IP rating does an outside light need?

IP44 is the minimum for a sheltered position (under a porch or soffit, protected from direct rain). IP65 where the fitting is exposed to driving rain, splashing or a pressure washer. IP67 or IP68 for ground-recessed and in-ground fittings, or anywhere water can pool. The first digit is dust and solids, the second is water; see ip ratings explained.

How many outside lights can go on one circuit?

A 6 A lighting circuit can supply about 1,380 W. Modern LED wall lights at 10–15 W and floodlights at 20–50 W mean a dozen fittings add well under 500 W. The practical limits are voltage drop on long runs (3% maximum for lighting under BS 7671 Appendix 4, about 6.9 V at 230 V) and the number of points already on the circuit. Where the house has old halogen floodlights at 300–500 W each, count them.

Regulations & Standards