Summary

"Builder" covers more ground than any other trade title: a one-person outfit doing garden walls and patios, a two-person team doing kitchens and bathrooms, a small firm running extensions with subcontracted trades, and a main contractor on a £300,000 refurbishment. The day rate means something different at each level. For the sole trader it is their wage and the business in one number. For the firm it is the number the estimator uses to price labour on a job that will be sold as a fixed price, with the subcontractors, materials, plant, skips, scaffold, preliminaries, overhead and profit added on top — and it is also the rate on the variation when the customer asks for "a couple of extra sockets while you're here".

This guide builds the general builder's day rate from 2026 costs, gives the regional market figures for solo, team and firm, explains how the rate turns into a job price with overhead and profit, and sets out the rules that attach to being the builder rather than the trade: CIS deductions on the subbies you pay, CDM 2015 duties as the principal contractor, Building Regulations applications, the Consumer Rights Act on the contract, VAT and the domestic reverse charge. For the method across all trades see pricing labour; for the trades a builder prices in see bricklayer day rate guide, carpenter day rate guide and labourer day rate guide.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Charge Regional (outside London/SE) South East London Notes
Day rate, skilled builder, solo £200–£300 £240–£350 £300–£450 Own tools and van
Day rate, builder + labourer £350–£480 £400–£550 £500–£680 Labourer £130–£230 of it
Day rate, two skilled trades £420–£600 £480–£700 £600–£850
Hourly, small works £30–£45 £35–£52 £45–£65 First hour often £60–£90
Half-day minimum £130–£200 £150–£220 £180–£280
Day-work variation rate (on a contract) Day rate + 10–15% Day rate + 10–15% Day rate + 10–15% For unpriced extras
OHP on subcontractors and materials 15–25% 15–25% 15–25% On the pass-through value
Materials markup 10–20% 10–20% 10–20%
Single-storey extension, 20 m², all-in £1,800–£2,600 per m² £2,100–£3,000 £2,600–£3,800 Builder's finish, excl. kitchen; see extension guides
Kitchen fit (rip-out, first fix, fit, second fix), labour £2,500–£4,500 £3,000–£5,200 £3,800–£6,500 6–10 days, two people
Bathroom refit, labour £2,000–£3,500 £2,400–£4,000 £3,000–£5,000 5–8 days

Detailed Guidance

Building the day rate from your costs

A sole-trader general builder outside London, working with a labourer on most jobs and subcontracting the certified trades:

Item Annual figure
Target income before tax £42,000
Van: finance or depreciation, insurance, tax, servicing, fuel £8,500
Public liability (£5 million) and tools cover £1,400
Tools and plant: mixer, saws, breaker, laser, replacements, small plant hire not recharged £2,500
Consumables not recharged: blades, fixings, PPE, fuel for plant £900
Phone, software, accountant (CIS returns add to this), bank and card fees £2,600
Advertising, website, directories, trade association £1,500
Training, cards (CSCS, asbestos awareness, first aid, SMSTS/SSSTS on larger sites) £500
Pension contribution £3,000
Total to recover £62,900

A builder working 47 weeks and losing a day a week to quoting, site visits, ordering, Building Control appointments and chasing subbies has about 205 billable days. £62,900 ÷ 205 = £307 a day to earn £42,000 before tax. At £200 a day the income before tax is about £20,000 — the reason £200-a-day builders go out of business in year three. At £300 it is about £40,500. The market range of £200–£300 regionally has a bottom half that works only for a builder with no van payment and no marketing cost, and a top that produces a modest wage for someone carrying the risk of other people's work.

From day rate to job price: overhead and profit

The day rate pays the builder for the days the builder is on the tools. It does not pay for managing a £40,000 extension where £24,000 is subcontractors and materials, where the builder is liable to the customer for the plumber's leak and the plasterer's cracks, funds the materials for 30 days before the stage payment, and spends two hours a day on the phone. That is what overhead and profit on the pass-through value is for:

Single-storey rear extension, 4 m × 5 m, regional, builder's finish

Builder's own labour:  24 days × £290                       =  £6,960
Labourer:              20 days × £160                       =  £3,200
Bricklayer (sub):      per thousand / m², agreed            =  £3,400
Groundworker + mini digger (sub):                           =  £2,800
Roofer (sub):                                               =  £2,600
Electrician (sub, Part P):                                  =  £1,900
Plumber / heating (sub):                                    =  £1,600
Plasterer (sub):                                            =  £1,800
Materials (at cost):                                        = £13,500
Preliminaries: skips ×4, scaffold, welfare, waste carrier   =  £3,100
Building Control fee, structural engineer (disbursements)   =  £1,400
                                                              --------
Cost                                                         £42,260

OHP 18% on subs, materials and prelims (£30,700)            =  £5,526
   (no separate materials markup: the OHP covers it)
Contingency 5% on the whole (declared or held)              =  £2,113
                                                              --------
Quote (ex VAT)                                               £49,899  → £49,900
                                                           (£2,495 per m²)

The builder's own 24 days at £290 are the day rate; the £5,500 of OHP is the builder's profit for running the job and carrying the risk. A builder who quotes £42,260 — cost — has worked 24 days for a wage and managed £30,000 of other people's work for nothing. If the customer finds the £49,900 high, the answer is the breakdown, not a cut to the OHP.

Day-work and variations

On any job longer than a week the customer will ask for extras, and the extras are where fixed-price jobs lose money. The contract should name the day-work rates — builder, labourer, each subcontractor's hourly or daily charge — with a 10–15% uplift over the pricing rates to cover the disruption, and should say that materials for extras are at cost plus the agreed markup. Record each variation on the day (a text with a photo is enough), price it within 48 hours, and get a yes before the work is done. A builder who does £3,000 of unpriced extras on a £40,000 job and argues about them at the end has given them away; see quotes vs estimates for the Consumer Rights Act position on unagreed prices.

Small works and the hourly rate

Kitchens, bathrooms, garden walls, a new doorway, a stud wall: the solo builder's bread and butter. These are priced as jobs, built from the day rate with the materials on top, and presented as a total:

For jobs under a day, charge the hourly rate with a first-hour premium (£60–£90 for the first hour, then £30–£45), or a half-day minimum. The hourly rate exists for the customer who wants "a quick look at the door that sticks"; it should not be the basis of any job over two days.

Being the contractor: CIS, CDM and the paperwork

Taking on subcontractors makes the builder a contractor three times over:

See managing subcontractors and subcontracting and subbies for the working relationship; employers liability insurance guide for the point at which a regular labourer becomes an employee.

Regional, seasonal and firm-size factors

The regional spread is 40–50% from the cheapest regions to London, and London adds parking, ULEZ, congestion charge and the hour each way that the day rate must carry. Seasonally the builder is less exposed than the external trades, but January is quiet for quoting and November–February for starts; the rate carries it. A two- or three-person firm with a van each and an office has an overhead of £40,000–£80,000 before anyone is paid, which is why the firm's day rate for the same skilled builder is £50–£100 a day above the sole trader's, and why the firm's OHP is 20–25% rather than 15%.

Frequently Asked Questions

What is a fair day rate for a builder in 2026?

£200–£300 a day outside London and the South East for a skilled self-employed general builder with their own tools and van, £300–£450 in London, and £400–£600 regionally for a two-person team. The rate produces around £40,000 before tax on 205 billable days once the van, insurance, tools, marketing and pension are paid; below £250 regionally the sums only work for a builder with no van payment.

Should a builder charge by the day or by the job?

By the job, for anything over two days: the customer gets a fixed price and the builder is paid for efficiency and for carrying the subcontract and material risk through overhead and profit. The day rate is the figure the job price is built from, the rate for day-work extras named in the contract, and the right basis for genuinely open-ended work — a structural investigation, a refurbishment where nobody knows what is behind the plaster — with a written cap.

How much should a builder add on subcontractors and materials?

15–25% overhead and profit on the value of subcontractors, materials and preliminaries that pass through the builder's contract, in addition to the builder's own day rate for the days worked. On a £40,000 extension with £30,000 of pass-through, that is £4,500–£7,500: the builder's payment for managing the job and being liable for it.

Do I have to deduct CIS from my subbies?

Yes, if you pay subcontractors for construction work: register as a CIS contractor, verify each one with HMRC, deduct 20% (30% unverified) from the labour element, and file monthly returns. It applies however small you are. A homeowner paying you is not a contractor, so nothing is deducted from your invoice to them.

Am I the principal contractor on a house extension?

If more than one contractor works on the project — you and a subcontracted electrician is enough — and you control the construction phase, yes, under CDM 2015, with the client's duties also falling to you on domestic work. The practical obligations are a construction phase plan, inductions, welfare and coordinating the trades; the HSE's guidance for small domestic projects sets out the minimum.

Regulations & Standards