Summary

An HMO conversion is two jobs sold as one. The first is ordinary refurbishment: partitions, en-suites, a bigger kitchen, rewiring, decorating. The second is a compliance package that the landlord cannot let the property without, and that the local authority will inspect against. Builders who price the first and forget the second end up fitting fire doors and alarm systems for nothing after the HMO officer's visit. Builders who price the second properly tend to win the repeat work, because HMO landlords usually own more than one.

The money is in understanding what the licence conditions and the fire guidance actually require for this house, and separating that from what the landlord would like. A two-storey house with five occupants needs a Grade D1 LD2 alarm system, FD30S doors onto the hallway and stairs, and a protected route to the front door. A three-storey house with the same five occupants moves up to a Grade A system in most councils' standards, emergency lighting on the stairs, and possibly a sprinkler or alternative escape route if the layout is poor. The difference is £5,000–£10,000, and it is decided by the building, not by the client.

This guide gives the 2026 cost ranges for each element of a conversion, the licensing and planning thresholds that change the scope, the room sizes that decide the layout, and a worked example of a three-bedroom semi becoming a six-bedroom HMO. For the licensing framework itself see hmo licensing; for the fire standards in detail see hmo fire safety; for the labour pricing method see pricing labour.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Element Typical 2026 cost Notes
FD30S fire door into existing frame, fitted with closer and intumescent strips £350–£600 each Frame must be sound and 30+ mm deep
FD30S door and new fire-rated frame £550–£900 each Where the existing frame is out of square or too thin
Grade D1 LD2 alarm system, 2-storey, 6 rooms £800–£1,500 Mains interlinked, heat detector in kitchen
Grade A fire alarm system, 3-storey £2,500–£5,000 Panel, sounders, detection; annual servicing extra
Emergency lighting, 4–6 bulkheads £400–£900 3-hour maintained or non-maintained to BS 5266-1
Protected route upgrades (lining, glazing, under-stairs) £1,500–£4,000 Depends on existing fabric
Consumer unit upgrade and EICR £600–£1,100 Part P notifiable
Full rewire, 3-bed house £4,500–£8,000 Often needed on pre-1990 stock
Boiler upsizing or unvented cylinder £2,500–£4,500 Six showers in a morning
En-suite shower room, per room £3,500–£6,000 Including tanking and tiling
Stud partition, acoustic, decorated, per m² £120–£180 Fire-rated board on escape route
Kitchen enlargement or second cooker £6,000–£12,000 To council amenity standard
Per lettable room, all-in (building trades) £8,000–£15,000 Excludes furniture and fees
3-bed to 6-bed conversion, all-in £35,000–£80,000 Regional; London +25–40%

Detailed Guidance

Start with the council's HMO standards, not the landlord's drawing

Every licensing authority in England publishes its own HMO amenity and fire safety standards, usually based on the LACORS Housing Fire Safety guidance (2008) and the government's HMO licensing guidance. They differ on detail: some require a Grade A alarm for any HMO over two storeys, some accept Grade D1 LD1 up to three storeys with a good escape route, some insist on emergency lighting on every staircase. The council's document is the specification you are pricing against, and it is free. Download it, read the section for the storey count and occupancy the landlord is aiming for, and list every item it requires. That list becomes the first half of your quote.

The second step is the layout. Measure every proposed bedroom against the 6.51 m² and 10.22 m² minimums, excluding any floor area under a sloping ceiling where the headroom is below 1.5 m. A box room of 6.2 m² is not a lettable room, whatever the landlord has been told, and a loft room with a dormer may only count the central strip. If the layout only works by failing the room sizes, say so at quote stage. It is cheaper for everyone than a refused licence.

Fire doors and the protected route

The core of HMO fire safety in a conventional house is a protected route: the hall, stairs and landings enclosed in 30-minute fire-resisting construction with FD30S doors onto them from every room, so that a fire in one bedroom does not cut off everyone else's escape. Pricing it means surveying every door opening on that route.

Most existing internal door frames are too thin for a fire door. An FD30S door is 44 mm thick and needs a frame with at least 30 mm of stop depth and solid fixings into the wall; many 1960s–1990s frames are 25 mm stock with a planted stop. Where the frame can be kept, allow for intumescent strips and cold smoke seals in the door or frame, three hinges to BS EN 1935, an overhead closer to BS EN 1154 and the fire-rated glazing of any vision panel. Where it cannot, allow a new fire-rated frame set, which is the £550–£900 figure. Kitchen doors nearly always need replacing because of the existing glazed panel.

Walls on the route are usually fine if they are masonry or plasterboard on timber studs with two layers of 12.5 mm board each side; a single layer of 9.5 mm board on an older partition is not 30 minutes and needs an extra layer. Check the ceiling under the stairs, the under-stairs cupboard (line it or remove the door and the contents from the route), and any glazed panel above a door. See fire doors and hmo fire safety for the construction detail.

Alarm grades and what the council will ask for

BS 5839-6 sets the grade (the hardware) and the category (the coverage). For a two-storey HMO with up to six occupants the usual requirement is Grade D1, category LD2: mains-powered interlinked detectors with tamper-proof backup power, smoke detection in the hall and landing and in every bedroom and living room, and a heat detector in the kitchen. That is 8–10 detectors for a six-bedroom house, at £60–£120 each installed on an existing lighting circuit with a dedicated supply where the council insists. Radio-interlinked detectors save chasing and are acceptable under the standard.

For three or more storeys, for larger occupancies, or where the escape route is compromised (an inner room, a stair that passes through a living room), most councils require a Grade A system: a control panel to BS 5839-1, sounders, call points and detection, with a commissioning certificate and a maintenance contract. Budget £2,500–£5,000 and tell the landlord about the annual servicing, which is a licence condition. If the council's standard calls for LD1 (detection in every room including the bathrooms and cupboards) the detector count rises by half.

Electrics, gas and water: the hidden capacity problem

Six adults in a house designed for a family of four draw more of everything. The consumer unit usually needs replacing to a metal-clad unit with RCBO or RCD protection to BS 7671:2018+A2:2022, with new circuits for each electric shower (8.5–9.5 kW on 10 mm² cable) and a dedicated cooker circuit for a second cooker. Many councils want a satisfactory EICR before the licence is granted, so a borderline installation is a rewire. Price the EICR at £150–£300 and the likely remedial work from its findings, with the rewire as a priced option.

Hot water is the second problem. A 24 kW combi cannot run two showers at once; a six-bed HMO with en-suites needs a 35–42 kW combi for sequential use or, better, an unvented cylinder of 210–300 litres with a system boiler, which brings Part G3 of the Building Regulations and a G3-qualified installer into the job. Cold mains flow of 20 litres a minute or more at the stopcock is the minimum for an unvented system; test it before you promise one. The annual Landlord Gas Safety Record is the landlord's job, but a new boiler should be left with its commissioning checklist and a first CP12.

Water supply to the extra bathrooms should be in 22 mm to the last branch, and the drainage from en-suites on upper floors usually means a second soil stack or a macerator; see macerator toilet installation pricing guide if a gravity connection is not possible.

Sound, layout and the extra rooms

Part E applies to the walls and floors between rooms for residential purposes on a material change of use, so a partition between two bedrooms should achieve the 43 dB DnT,w+Ctr airborne figure in Approved Document E, and the floor between an upstairs bedroom and a downstairs one should be upgraded with sound-absorbent quilt and a second board layer if it is a bare joisted floor. Pre-completion testing can be required, or the council may accept a robust detail built to a recognised specification. Price the acoustic partition at £120–£180 per m² and allow £800–£1,500 per floor for upgrading a ceiling; a cheap single-board stud wall will fail the test and have to be rebuilt.

A lounge turned into a bedroom needs a window with suitable means of escape under Approved Document B (an opening of at least 0.33 m² and 450 mm minimum in both dimensions, sill no more than 1,100 mm above the floor), a radiator, a data point and two double sockets at a minimum. A new bedroom from a garage brings Part L insulation, damp-proofing and a floor upgrade, at £12,000–£20,000 for the room, which only works where the licence income justifies it.

Building the quote and the margin

Price the job in three sections the landlord can read: compliance (fire doors, alarm, emergency lighting, protected route, EICR, consumer unit), capacity (boiler, cylinder, water, drainage, extra circuits), and layout (partitions, en-suites, kitchen, decorating). Give the compliance section as fixed items with quantities, because the council will ask the landlord for exactly that list. Carry a 10–15% contingency on a pre-1990 house and say what it covers (opening up finds, extra frame replacements, remedial electrics). Add 15–25% overhead and profit on top of your labour and materials, not inside the contingency.

Stage payments by section work well: deposit on order, a stage at first fix, a stage at second fix, and the balance on the building control completion certificate and the alarm commissioning certificate. Keep the certificates together, because the landlord needs them for the licence application: the alarm commissioning certificate, the fire door schedule, the EICR, the building control completion certificate, the Part P certificate and the gas safety record.

Worked example: three-bed semi to six-bed HMO, Midlands

A 1960s three-bedroom semi with a through lounge, kitchen and single bathroom, two storeys, no loft conversion. The landlord wants six lettable rooms with two en-suites and a shared bathroom, and the council's standard requires Grade D1 LD2, FD30S doors, a protected route and a second cooking point for six.

Item Cost
Partition the through lounge into two bedrooms, acoustic, decorated (14 m²) £2,300
Partition the large front bedroom into two, acoustic (10 m²) £1,650
Seven FD30S doors (five into existing frames, two with new frames), closers, seals £3,850
Protected route: second board layer under stairs, kitchen door glazing, landing wall £1,900
Grade D1 LD2 alarm, 9 detectors, radio interlinked, dedicated circuit £1,150
Fire blanket and two extinguishers £180
Consumer unit upgrade, four new circuits, EICR, Part P £1,650
38 kW combi replacing 24 kW, flue, controls, commissioning £3,200
Two en-suite shower rooms, tanked and tiled, electric showers £9,800
Shared bathroom refit with separate WC £5,200
Kitchen extended with second oven and hob, extra worktop and storage £8,400
Decorating throughout, six rooms and common parts £3,600
Skips, protection, making good £1,100
Subtotal labour and materials £43,980
Contingency 12% £5,278
Overhead and profit 20% on subtotal £8,796
Quote (excluding VAT, furniture and licence fee) £58,054

At £9,676 per lettable room this sits in the middle of the national range. The same job in outer London would price at £70,000–£80,000 on labour alone.

Frequently Asked Questions

Does a small HMO with four tenants need the same fire precautions as a licensed one?

The licensing threshold and the fire duties are separate. A house let to four unrelated people is an HMO under the Housing Act 2004 even though it does not need a mandatory licence, and the Management of Houses in Multiple Occupation (England) Regulations 2006 and the Housing Health and Safety Rating System still apply to it, as does the Regulatory Reform (Fire Safety) Order 2005 for the common parts. Most councils expect at least a Grade D1 LD2 alarm and fire doors on the escape route for any HMO. Price the same compliance package, and check whether the council runs an additional licensing scheme that catches it anyway.

Can I use 30-minute fire doors without closers?

Not on the escape route of an HMO. The guidance and nearly every council standard require self-closing devices on FD30S doors, because a fire door propped open is a plain door. Fit overhead closers to BS EN 1154, or the concealed type where the landlord objects to the look, and make sure the door closes and latches from any opening angle before you sign it off. Free-swing closers that hold open and release on the alarm are acceptable on a Grade A system but cost £150–£250 each.

Who applies for building control, the landlord or me?

Either can, but the application is the landlord's legal responsibility as the person carrying out the work, and the certificate is in their name. In practice the builder usually submits a building notice or full plans application on their behalf, because the inspector wants to talk to whoever is on site. Agree in the contract who pays the fee (£600–£1,200 for a conversion of this size) and build the inspections into the programme: foundations are not an issue, but the inspector will want to see the fire doors, the escape route lining and the sound insulation before they are covered.

Does the conversion need planning permission?

For three to six occupants in a C4 small HMO the change from a family house is permitted development unless the council has an Article 4 direction for the area, in which case a full application is needed and may be refused on concentration grounds. Seven or more occupants is a sui generis use and always needs permission. Check the Article 4 position on the council's website before quoting and tell the landlord in writing; a conversion built without the permission it needed cannot be licensed and may have to be reversed.

Should I quote furniture and white goods?

Usually not within the building contract. Furnishing a six-bed HMO costs £6,000–£12,000 and is better bought by the landlord with their own supplier accounts, and it keeps your quote comparable with other builders'. Do quote the fixed items the licence standard requires, such as the fire blanket, the extinguishers and the second cooker, because those belong with the compliance package.