Summary
The internal stopcock is the valve nobody touches until it matters, and then it will not turn. A stopcock that has sat for twenty years under a kitchen sink seizes on its spindle, weeps at the gland when it is finally moved, or shears when it is forced. The call to replace it comes either from a customer who has just discovered it does not work (often with water on the floor somewhere else in the house), from a survey or a water-company visit that has flagged it, or from a plumber doing another job who has had to tell the customer the house cannot be isolated. In every case the job is the same: get the supply off upstream, cut out the old valve, fit a new one, test. What varies is the upstream isolation, and that is where the pricing goes wrong.
The second variable is the pipe. Modern supplies are 25 mm MDPE to a 22 mm or 15 mm copper or plastic tail with a compression stopcock; older ones are 15 mm copper from a lead supply joined with a wiped joint or a compression adaptor; the oldest are lead all the way to the tap. Each is a different hour. This guide gives the 2026 labour and material build-up for each isolation route and pipe type, the regulation that makes a stopcock compulsory, the products that comply, a worked example including the seized outside stop tap, and the emergency-call pricing for the burst-and-no-stopcock case. For valve types and selection see stopcock types; for the emergency sequence see burst pipe; for the broader isolation picture see isolation valves.
Key Facts
- Legal requirement — Water Supply (Water Fittings) Regulations 1999, Schedule 2, paragraph 10(1)(a): every premises must have a stop valve inside the building, as near as reasonably practicable to the point of entry, accessible and able to isolate the whole internal supply
- Responsibility boundary — in England and Wales the water company owns the communication pipe and the external stop tap at or near the boundary; the customer owns the supply pipe from the boundary inward and the internal stopcock. A seized external stop tap is the company's to repair (usually free, often slow); a seized internal one is the customer's
- Labour — 1–2 hours: £90–£180 regionally, £110–£220 South East, £130–£260 London, where the outside stop tap works
- Isolation when the outside tap is seized — pipe-freeze kit (aerosol, £30–£60; or CO₂ cylinder kit) on a clean section of copper: add 30–45 minutes and the kit; freezing MDPE or lead is unreliable and freezing is not possible on a pipe with any flow, so the customer must stop all water use
- Water company turn-off — free, but booked (1–10 working days unless an emergency); the company turns off at the boundary, you do the work in a window, they turn it back on or you do if the key fits; price the two visits
- Valve, screw-down — BS 1010-2 stopcock, 15 mm or 22 mm compression, DZR brass: £8–£20; the traditional choice, needs a key to the gland after fitting and will seize again if never turned
- Valve, lever full-bore — brass or DZR ball valve with a lever handle to BS EN 13828, WRAS-approved, 15/22 mm compression: £10–£25; quarter-turn, does not seize, better flow; the modern default for domestic use
- Remote or push-button isolation — a remotely operated stop valve (push-button on the worktop, valve under the sink) £50–£100 plus 30 minutes; sells well to elderly customers and landlords
- Pipe sizes — 15 mm copper is the common tail in houses before the 1990s; 22 mm copper or 25 mm MDPE (which uses a 25 mm × 22 mm or 25 mm × 15 mm MDPE-to-copper compression stopcock) on newer and replaced supplies; a 20 mm MDPE supply on some 1980s–90s estates
- Lead supply — pre-1970 houses; the stopcock is often on 15 mm copper immediately after a lead-to-copper joint, or on lead itself. A lead-to-copper compression adaptor with a liner is the minimum; recommend replacement of the lead supply (£600–£1,500 for a 5–10 m moled or trenched run, often subsidised by the water company's lead replacement scheme) and record the lead on the invoice
- Drain-down and refill — after isolation, open the kitchen tap (lowest) to drain the rising main to the valve; on refill, flush the kitchen tap for two minutes to clear debris and refill WC cisterns and any cold tank; add 15 minutes
- Combi and unvented systems — isolating the mains stops the boiler's cold feed; on refill, check the boiler pressure and the unvented cylinder's inlet set (strainer and PRV) for debris
- Access — a stopcock behind a kitchen kickboard or under a floorboard is an extra 20–40 minutes; one chased into a wall is a half-day with making good
- Insurance and survey — a working, labelled stopcock is a condition of some home-insurance escape-of-water cover and a standard survey item; label the new valve
- Materials markup — 20–30% on the valve and fittings; the freeze kit at cost plus 25% as a consumable
- Emergency call-out — burst pipe with a seized stopcock: £120–£250 for the first hour, then the hourly rate, with the freeze or the water company's emergency line (companies attend burst-related external stop tap faults as a priority)
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Scenario | Regional (outside London/SE) | South East | London | Time | Notes |
|---|---|---|---|---|---|
| Replace internal stopcock, outside stop tap works, copper pipe | £120–£220 | £140–£260 | £170–£300 | 1–1.5 hr | Incl. lever valve, fittings, test |
| As above, with pipe freeze (outside tap seized) | £160–£280 | £190–£320 | £220–£370 | 1.5–2.5 hr | Freeze kit included |
| As above, with water company turn-off | £140–£250 + second visit £50–£90 | Two visits | Booked; free from company | ||
| Replace stopcock on MDPE supply (25 mm × 22/15 mm) | £130–£230 | £150–£270 | £180–£320 | 1–2 hr | MDPE insert and correct stopcock |
| Replace stopcock on lead supply (lead-to-copper adaptor) | £160–£280 | £190–£330 | £230–£400 | 1.5–2.5 hr | Report lead; quote supply replacement |
| Add remote push-button isolation valve | +£80–£150 | +£90–£170 | +£110–£200 | +30–45 min | Plus valve £50–£100 |
| Free a seized stopcock without replacing (gland repack, spindle) | £60–£110 | £70–£130 | £90–£160 | 30–60 min | Only if the body is sound |
| Relocate stopcock to an accessible position | £200–£400 | £240–£460 | £280–£550 | 2–4 hr | New pipe run; making good |
| New lead supply replacement, 5–10 m, moled | £600–£1,500 | £700–£1,700 | £900–£2,000 | 1 day | Water company scheme may contribute |
| Emergency call-out, burst and seized stopcock | £120–£250 first hour | £140–£280 | £170–£320 | Then hourly |
Detailed Guidance
Step one: how is the supply going off?
Before quoting, find the external stop tap. It is usually under a small cover in the pavement or verge at the boundary, 600–1,000 mm down, operated with a stop tap key (a long T-key for a crutch head, or a square-drive key). Test it on the survey visit, with the customer's permission and a tap running inside so you can see it work:
- Turns and shuts off — straightforward job. Note that water company stop taps are not always full shut-off; a weep through the valve is normal and the internal job can proceed with a bucket
- Seized, or the cover is buried under a driveway — two options. Pipe freeze on a clean, dry, straight section of copper at least 150 mm from the old valve and any fitting: aerosol freeze spray with a jacket, 10–15 minutes to form a plug, 20–30 minutes of working time, no flow in the pipe during the freeze. Or book the water company's turn-off; most companies do it free within a few days, or same day for an emergency. Quote both: the freeze is dearer per visit but one visit; the company turn-off is cheaper but two visits and the customer waits
- No external stop tap found — the water company will locate it or install one; this is their communication pipe and their stop tap, and the customer should ring them. Report it on your quote and do not dig in the highway yourself
A freeze on lead or MDPE is unreliable (lead conducts heat poorly, MDPE flexes and the plug can shift); on those pipes, use the company turn-off.
Step two: the pipe and the valve
15 mm or 22 mm copper. Cut out the old stopcock with pipe slice or hacksaw, leaving clean straight pipe either side (the old olives come out with the old valve; if the pipe is scored, cut back further). Fit a new lever full-bore valve or a BS 1010-2 stopcock on compression with new olives. Fit the valve the right way round (flow arrow); a screw-down stopcock has a direction, a ball valve does not. Where there is no drain-off cock immediately after the stopcock, fit one (£5–£10, 15 minutes) so that the rising main can be drained in future; Schedule 2 paragraph 10 also expects the installation to be capable of being drained.
25 mm MDPE. The stopcock is a specific MDPE × copper compression fitting (25 mm × 22 mm or 25 mm × 15 mm) with a pipe liner (insert) in the MDPE; do not fit a copper compression stopcock onto MDPE without the correct adaptor. MDPE supplies entering through a floor often have the stopcock within 300 mm of the entry; keep it there.
Lead. Cut back the lead to sound metal, fit a lead-to-copper compression adaptor with an internal liner sized to the lead's bore (lead pipe is measured by bore and weight; a 1/2 in lead is nominally 12.7 mm bore but varies), then the new valve on 15 mm copper. Do not wipe a solder joint on a potable supply. Tell the customer in writing that the supply is lead, that lead in drinking water is regulated at 10 µg/l under the Water Supply (Water Quality) Regulations 2016, and that the water company runs a lead replacement scheme that may cover the communication pipe and contribute to the supply pipe; quote the supply-pipe replacement separately. See water softeners for the related water-quality points.
Valve choice. For most domestic replacements a WRAS-approved lever ball valve (full bore, DZR brass, BS EN 13828) is the right fitting: quarter-turn, no gland to seize, no spindle to shear, better flow than a screw-down. A BS 1010-2 screw-down stopcock is still correct and some water companies prefer it at the boundary. Avoid cheap non-DZR brass on aggressive water. Whatever is fitted, label it.
Labour build-up: standard replacement
| Step | Time |
|---|---|
| Confirm outside stop tap works; run a tap inside, shut it off | 10 min |
| Open kitchen tap to drain the rising main; sheet the cupboard | 5 min |
| Cut out old valve; clean pipe ends; check for old olives/score marks | 15–20 min |
| Fit new lever valve and a drain-off cock, compression with new olives | 15 min |
| Reopen outside stop tap; test the new valve open and shut; check joints under pressure for 10 minutes | 15 min |
| Flush the kitchen tap; check cistern and any cold tank refills; check boiler pressure | 10 min |
| Label the valve; show the customer; invoice | 5 min |
| Total | 1–1.5 hr |
Add 30–45 minutes for a freeze, 20–40 minutes for difficult access, 30–45 minutes for a lead adaptor. On a plumber's 2026 rate of £45–£70 an hour (see plumber hourly rate guide) the labour is £90–£180 and the invoice with the valve and sundries £120–£220.
Worked example: 1950s semi, seized outside stop tap, 15 mm copper
Customer found the kitchen stopcock would not turn when a radiator valve started weeping. Outside stop tap under the front path: crutch head, seized solid, not the plumber's to force. Customer does not want to wait three days for the water company. Freeze it.
Labour: 2 hr @ £60 = £120
(freeze 15 mm copper 300 mm upstream; cut out old
BS 1010 stopcock; fit 15 mm full-bore lever valve and
drain-off; thaw; test; flush)
Materials
15 mm DZR lever full-bore valve, WRAS £14
15 mm drain-off cock £6
Olives, PTFE, compound £3
£23 + 25% = £29
Freeze kit (aerosol + jacket) £38 + 25% = £48
------
Invoice £197
Note on invoice: external stop tap at boundary seized —
customer to report to water company (their asset);
new internal valve labelled; drain-off fitted.
Without the freeze, the same job would have been £120 + £29 = £149 on one visit after the company's turn-off, plus a return visit if the company required the plumber present. The quote stated both figures; the customer chose the freeze.
The emergency case: burst and no stopcock
A customer with water coming through a ceiling and a stopcock that will not turn needs, in order: the outside stop tap (try it; ring the water company's emergency line if seized — bursts are a priority call-out for them), the cold tank and the boiler off, every tap open to drop the pressure, and then the stopcock replaced once the supply is off. Price it as an emergency call-out (£120–£250 first hour regionally, then hourly) plus the standard replacement, and say so on the phone before you leave. See burst pipe and emergency callout pricing guide.
Relocating or adding a second stopcock
Where the only stopcock is under a floor, behind a fitted kitchen or in a cellar, customers (and insurers) want one they can reach. Options:
- A second lever valve in an accessible position on the same rising main (under the sink, in a utility cupboard): £100–£200 plus the valve, 1–2 hours, and now the house has two isolation points, both labelled
- A remote push-button or lever-operated valve (actuator on the valve, control at worktop level): £130–£250 all-in; popular with older customers
- Relocation of the entry stopcock itself: only when the supply pipe route allows; 2–4 hours plus making good, £200–£400
Any of these is a legitimate upsell on a stopcock visit, and the compliance basis (an accessible internal stop valve) is in the regulation.
What to put in writing
The isolation route and its cost (outside tap works / freeze / water company), the valve type (lever full-bore, WRAS-approved, 15 mm), a drain-off cock included, any lead found and the recommendation that goes with it, that the external stop tap is the water company's asset, the emergency rate if applicable, and a 12-month workmanship guarantee. Under the Consumer Rights Act 2015 the work must be done with reasonable care and skill; forcing a seized water-company stop tap and snapping it is not, so do not.
Frequently Asked Questions
How much does it cost to replace a stopcock?
£120–£220 in 2026 outside London for a standard replacement on copper pipe where the outside stop tap works, including a new lever valve, a drain-off and the test. Add £40–£70 if the pipe has to be frozen because the outside tap is seized, and £40–£80 if the supply is lead and needs an adaptor. London is 30–45% more. An emergency call-out for a burst with a seized stopcock is £120–£250 for the first hour on top.
Who is responsible for the outside stop tap?
In England and Wales, the water company: the external stop tap at or near the boundary is part of the communication pipe, which is theirs. They will repair or replace a seized one, usually free, though not always quickly. The supply pipe from the boundary into the house and the internal stopcock are the customer's. Scotland (Scottish Water) and Northern Ireland (NI Water) follow a similar split; check the company's policy.
Is it a legal requirement to have a stopcock?
Yes. The Water Supply (Water Fittings) Regulations 1999, Schedule 2, paragraph 10, require a stop valve inside the premises as close as reasonably practicable to where the supply enters, accessible and capable of shutting off the whole internal supply. A house with no working internal stopcock does not comply, and the replacement is the fix.
Should I fit a lever valve or a traditional stopcock?
A WRAS-approved full-bore lever ball valve for almost every domestic replacement: it does not seize, it is quarter-turn, it gives better flow, and a customer can operate it. A BS 1010-2 screw-down stopcock is still a compliant fitting and is what some water companies specify at the boundary, but it needs turning every few months to stay free, and most never are.
Can I freeze the pipe instead of turning the water off?
On clean copper with no flow, yes: an aerosol freeze kit forms an ice plug in 10–15 minutes that holds for 20–30 minutes, enough to cut out and replace a valve. It does not work reliably on lead or MDPE, and any flow in the pipe (a dripping tap, a filling cistern) stops the plug forming. It is a legitimate method for a stopcock change; it is not a substitute for a working outside stop tap, which the water company should fix.
Regulations & Standards
Water Supply (Water Fittings) Regulations 1999 (SI 1999/1148) — regulation 4 (fitting quality), Schedule 2 paragraph 10 (stop valves, servicing valves and drain-off), paragraph 15 (backflow)
Water Industry Act 1991 — sections 45–47 and the water companies' duties; the communication pipe / supply pipe ownership split
Water Supply (Water Quality) Regulations 2016 (SI 2016/614) — lead standard 10 µg/l
BS 1010-2:1973 — specification for draw-off taps and stopvalves for water services (screw-down pattern); stopvalves
BS EN 13828:2003 — building valves; manually operated copper alloy and stainless steel ball valves for potable water supply in buildings
BS EN 1213:2000 — building valves; copper alloy stopvalves for potable water supply in buildings
BS EN 1254-2:2021 — copper and copper alloys; plumbing fittings; compression fittings for copper tubes
BS EN 12201-2:2024 — plastics piping systems for water supply, and for drainage and sewerage under pressure; polyethylene (PE) pipes (MDPE supply pipes)
BS EN 806-2:2005 — specifications for installations inside buildings conveying water for human consumption; design
BS 8558:2015 — guide to the design, installation, testing and maintenance of services supplying water for domestic use
BS EN ISO 9453:2020 — lead-free soft solder for potable water (where soldered joints are used elsewhere in the repair)
Consumer Rights Act 2015 (s.49–s.52) — reasonable care and skill; reasonable price where none agreed
Water Supply (Water Fittings) Regulations 1999, Schedule 2 — paragraph 10 stop valve requirement
Ofwat — Supply pipes: who is responsible — the communication pipe / supply pipe boundary
WRAS — Approved products and installation guidance — valve approvals
Water Regs UK — Stop valves and isolation guidance — installer guidance on Schedule 2
Drinking Water Inspectorate — Lead in drinking water — the 10 µg/l standard and lead pipe replacement
CIPHE — Technical guidance for domestic plumbing — good practice
stopcock types — screw-down, lever and remote valves compared, and where each belongs
isolation valves — servicing valves throughout the installation
burst pipe — the emergency isolation sequence when the stopcock will not turn
emergency callout pricing guide — call-out structures for out-of-hours work
tap replacement pricing guide — the job that usually finds the seized stopcock
frost protection — protecting the rising main and stopcock from freezing
plumber hourly rate guide — the rate the labour figures are built from
backflow prevention check valves — backflow devices often fitted at the same time