Summary

The internal stopcock is the valve nobody touches until it matters, and then it will not turn. A stopcock that has sat for twenty years under a kitchen sink seizes on its spindle, weeps at the gland when it is finally moved, or shears when it is forced. The call to replace it comes either from a customer who has just discovered it does not work (often with water on the floor somewhere else in the house), from a survey or a water-company visit that has flagged it, or from a plumber doing another job who has had to tell the customer the house cannot be isolated. In every case the job is the same: get the supply off upstream, cut out the old valve, fit a new one, test. What varies is the upstream isolation, and that is where the pricing goes wrong.

The second variable is the pipe. Modern supplies are 25 mm MDPE to a 22 mm or 15 mm copper or plastic tail with a compression stopcock; older ones are 15 mm copper from a lead supply joined with a wiped joint or a compression adaptor; the oldest are lead all the way to the tap. Each is a different hour. This guide gives the 2026 labour and material build-up for each isolation route and pipe type, the regulation that makes a stopcock compulsory, the products that comply, a worked example including the seized outside stop tap, and the emergency-call pricing for the burst-and-no-stopcock case. For valve types and selection see stopcock types; for the emergency sequence see burst pipe; for the broader isolation picture see isolation valves.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Scenario Regional (outside London/SE) South East London Time Notes
Replace internal stopcock, outside stop tap works, copper pipe £120–£220 £140–£260 £170–£300 1–1.5 hr Incl. lever valve, fittings, test
As above, with pipe freeze (outside tap seized) £160–£280 £190–£320 £220–£370 1.5–2.5 hr Freeze kit included
As above, with water company turn-off £140–£250 + second visit £50–£90 Two visits Booked; free from company
Replace stopcock on MDPE supply (25 mm × 22/15 mm) £130–£230 £150–£270 £180–£320 1–2 hr MDPE insert and correct stopcock
Replace stopcock on lead supply (lead-to-copper adaptor) £160–£280 £190–£330 £230–£400 1.5–2.5 hr Report lead; quote supply replacement
Add remote push-button isolation valve +£80–£150 +£90–£170 +£110–£200 +30–45 min Plus valve £50–£100
Free a seized stopcock without replacing (gland repack, spindle) £60–£110 £70–£130 £90–£160 30–60 min Only if the body is sound
Relocate stopcock to an accessible position £200–£400 £240–£460 £280–£550 2–4 hr New pipe run; making good
New lead supply replacement, 5–10 m, moled £600–£1,500 £700–£1,700 £900–£2,000 1 day Water company scheme may contribute
Emergency call-out, burst and seized stopcock £120–£250 first hour £140–£280 £170–£320 Then hourly

Detailed Guidance

Step one: how is the supply going off?

Before quoting, find the external stop tap. It is usually under a small cover in the pavement or verge at the boundary, 600–1,000 mm down, operated with a stop tap key (a long T-key for a crutch head, or a square-drive key). Test it on the survey visit, with the customer's permission and a tap running inside so you can see it work:

A freeze on lead or MDPE is unreliable (lead conducts heat poorly, MDPE flexes and the plug can shift); on those pipes, use the company turn-off.

Step two: the pipe and the valve

15 mm or 22 mm copper. Cut out the old stopcock with pipe slice or hacksaw, leaving clean straight pipe either side (the old olives come out with the old valve; if the pipe is scored, cut back further). Fit a new lever full-bore valve or a BS 1010-2 stopcock on compression with new olives. Fit the valve the right way round (flow arrow); a screw-down stopcock has a direction, a ball valve does not. Where there is no drain-off cock immediately after the stopcock, fit one (£5–£10, 15 minutes) so that the rising main can be drained in future; Schedule 2 paragraph 10 also expects the installation to be capable of being drained.

25 mm MDPE. The stopcock is a specific MDPE × copper compression fitting (25 mm × 22 mm or 25 mm × 15 mm) with a pipe liner (insert) in the MDPE; do not fit a copper compression stopcock onto MDPE without the correct adaptor. MDPE supplies entering through a floor often have the stopcock within 300 mm of the entry; keep it there.

Lead. Cut back the lead to sound metal, fit a lead-to-copper compression adaptor with an internal liner sized to the lead's bore (lead pipe is measured by bore and weight; a 1/2 in lead is nominally 12.7 mm bore but varies), then the new valve on 15 mm copper. Do not wipe a solder joint on a potable supply. Tell the customer in writing that the supply is lead, that lead in drinking water is regulated at 10 µg/l under the Water Supply (Water Quality) Regulations 2016, and that the water company runs a lead replacement scheme that may cover the communication pipe and contribute to the supply pipe; quote the supply-pipe replacement separately. See water softeners for the related water-quality points.

Valve choice. For most domestic replacements a WRAS-approved lever ball valve (full bore, DZR brass, BS EN 13828) is the right fitting: quarter-turn, no gland to seize, no spindle to shear, better flow than a screw-down. A BS 1010-2 screw-down stopcock is still correct and some water companies prefer it at the boundary. Avoid cheap non-DZR brass on aggressive water. Whatever is fitted, label it.

Labour build-up: standard replacement

Step Time
Confirm outside stop tap works; run a tap inside, shut it off 10 min
Open kitchen tap to drain the rising main; sheet the cupboard 5 min
Cut out old valve; clean pipe ends; check for old olives/score marks 15–20 min
Fit new lever valve and a drain-off cock, compression with new olives 15 min
Reopen outside stop tap; test the new valve open and shut; check joints under pressure for 10 minutes 15 min
Flush the kitchen tap; check cistern and any cold tank refills; check boiler pressure 10 min
Label the valve; show the customer; invoice 5 min
Total 1–1.5 hr

Add 30–45 minutes for a freeze, 20–40 minutes for difficult access, 30–45 minutes for a lead adaptor. On a plumber's 2026 rate of £45–£70 an hour (see plumber hourly rate guide) the labour is £90–£180 and the invoice with the valve and sundries £120–£220.

Worked example: 1950s semi, seized outside stop tap, 15 mm copper

Customer found the kitchen stopcock would not turn when a radiator valve started weeping. Outside stop tap under the front path: crutch head, seized solid, not the plumber's to force. Customer does not want to wait three days for the water company. Freeze it.

Labour: 2 hr @ £60                                       =  £120
  (freeze 15 mm copper 300 mm upstream; cut out old
   BS 1010 stopcock; fit 15 mm full-bore lever valve and
   drain-off; thaw; test; flush)
Materials
  15 mm DZR lever full-bore valve, WRAS   £14
  15 mm drain-off cock                     £6
  Olives, PTFE, compound                   £3
                                  £23 + 25%              =   £29
Freeze kit (aerosol + jacket)      £38 + 25%              =   £48
                                                          ------
Invoice                                                    £197
Note on invoice: external stop tap at boundary seized —
customer to report to water company (their asset);
new internal valve labelled; drain-off fitted.

Without the freeze, the same job would have been £120 + £29 = £149 on one visit after the company's turn-off, plus a return visit if the company required the plumber present. The quote stated both figures; the customer chose the freeze.

The emergency case: burst and no stopcock

A customer with water coming through a ceiling and a stopcock that will not turn needs, in order: the outside stop tap (try it; ring the water company's emergency line if seized — bursts are a priority call-out for them), the cold tank and the boiler off, every tap open to drop the pressure, and then the stopcock replaced once the supply is off. Price it as an emergency call-out (£120–£250 first hour regionally, then hourly) plus the standard replacement, and say so on the phone before you leave. See burst pipe and emergency callout pricing guide.

Relocating or adding a second stopcock

Where the only stopcock is under a floor, behind a fitted kitchen or in a cellar, customers (and insurers) want one they can reach. Options:

Any of these is a legitimate upsell on a stopcock visit, and the compliance basis (an accessible internal stop valve) is in the regulation.

What to put in writing

The isolation route and its cost (outside tap works / freeze / water company), the valve type (lever full-bore, WRAS-approved, 15 mm), a drain-off cock included, any lead found and the recommendation that goes with it, that the external stop tap is the water company's asset, the emergency rate if applicable, and a 12-month workmanship guarantee. Under the Consumer Rights Act 2015 the work must be done with reasonable care and skill; forcing a seized water-company stop tap and snapping it is not, so do not.

Frequently Asked Questions

How much does it cost to replace a stopcock?

£120–£220 in 2026 outside London for a standard replacement on copper pipe where the outside stop tap works, including a new lever valve, a drain-off and the test. Add £40–£70 if the pipe has to be frozen because the outside tap is seized, and £40–£80 if the supply is lead and needs an adaptor. London is 30–45% more. An emergency call-out for a burst with a seized stopcock is £120–£250 for the first hour on top.

Who is responsible for the outside stop tap?

In England and Wales, the water company: the external stop tap at or near the boundary is part of the communication pipe, which is theirs. They will repair or replace a seized one, usually free, though not always quickly. The supply pipe from the boundary into the house and the internal stopcock are the customer's. Scotland (Scottish Water) and Northern Ireland (NI Water) follow a similar split; check the company's policy.

Is it a legal requirement to have a stopcock?

Yes. The Water Supply (Water Fittings) Regulations 1999, Schedule 2, paragraph 10, require a stop valve inside the premises as close as reasonably practicable to where the supply enters, accessible and capable of shutting off the whole internal supply. A house with no working internal stopcock does not comply, and the replacement is the fix.

Should I fit a lever valve or a traditional stopcock?

A WRAS-approved full-bore lever ball valve for almost every domestic replacement: it does not seize, it is quarter-turn, it gives better flow, and a customer can operate it. A BS 1010-2 screw-down stopcock is still a compliant fitting and is what some water companies specify at the boundary, but it needs turning every few months to stay free, and most never are.

Can I freeze the pipe instead of turning the water off?

On clean copper with no flow, yes: an aerosol freeze kit forms an ice plug in 10–15 minutes that holds for 20–30 minutes, enough to cut out and replace a valve. It does not work reliably on lead or MDPE, and any flow in the pipe (a dripping tap, a filling cistern) stops the plug forming. It is a legitimate method for a stopcock change; it is not a substitute for a working outside stop tap, which the water company should fix.

Regulations & Standards