Summary
A garden shed is the smallest and most common garden building job, and also one of the most consistently under-priced. The failure pattern is familiar across this category: a tradesperson prices the visible carpentry (put the panels up, felt the roof, done in a morning) and treats the base as an afterthought — "we'll just level it off and pop some slabs down" — when an uneven, sloped, or poorly-drained site actually needs proper groundworks that take as long as the shed assembly itself.
This guide covers pricing for standard domestic storage/utility sheds — the everyday 6×4ft to 10×8ft timber or metal shed used for tools, bikes, mowers and general storage — as distinct from larger leisure buildings like summer houses or habitable garden rooms, which have a different cost structure and are covered separately. It's aimed at carpenters, handymen, landscapers and general builders pricing shed installation for domestic clients, whether supplying the shed themselves or assembling a client-purchased kit.
For base construction cost detail in full (this guide summarises and scales it for shed sizing), see shed base pricing guide. For larger leisure/garden-office buildings with a materially different cost structure, see summer house installation pricing guide and garden room pricing guide. For the permitted development and Building Regulations framework common to all garden outbuildings, see outbuildings regs.
Key Facts
- Shed sizes (standard range) — small (6×4ft), medium (8×6ft), large (10×8ft), workshop-grade (10×10ft and above)
- Base types — paving slab (cheapest, adequate for small/light sheds on level ground), concrete slab (standard for medium/large sheds or heavier contents), plastic grid system over compacted hardcore (fast, permeable, mid-price)
- Assembly time — flat-pack shiplap/overlap kit — 0.5-1 day for a small/medium shed with a 2-person team; interlocking log-cabin-style or workshop-grade kits can take 1-2 days
- Timber treatment — pressure-treated timber to BS 8417:2024 is the minimum specification for structural/ground-contact timber; factory-treated (dip or pressure) sheds typically carry a 10-15 year rot guarantee, untreated needs annual preservative
- Roof covering — standard shed felt (cheapest, 10-15 year life), mineral felt shingles (better appearance and longevity, 20+ year life), EPDM rubber (premium, flat-roof sheds, 25+ year life)
- Guttering — usually optional on a basic shed; worth quoting where roof run-off drains toward a boundary fence, path, or the shed sits close to a neighbouring structure
- Electrics — running power/lighting to a shed is Part P notifiable work under Building Regulations; needs SWA armoured cable buried at minimum 450mm in open ground — see armoured cable
- GPDO Class E permitted development — sheds are normally exempt from full planning if single storey, height capped at 2.5m within 2m of a boundary (otherwise 4m dual pitch / 3m other roof types), not forward of the principal elevation, and total outbuilding coverage stays under 50% of the garden
- Building Regs exemption threshold — sheds under 15m² with no sleeping accommodation are fully exempt from Building Regulations; 15-30m² is exempt only if sited at least 1m from any boundary or built substantially of non-combustible material
- Delivery/access — flat-pack shed kits are usually manageable by hand; larger panelised or log-cabin kits may need a second pair of hands or trolley for panel handling on restricted-access sites
- Base sizing rule of thumb — build the base 50-100mm larger than the shed footprint on each side for overhang, drip line and drainage fall
- VAT — standard rate 20% applies; no reduced rate for garden sheds
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Job component | Small shed (≤6×4ft) | Medium shed (8×6ft-10×8ft) | Workshop-grade shed (10×10ft+) |
|---|---|---|---|
| Paving slab base | £350-£550 | £500-£700 | N/A (undersized) |
| Concrete slab base | £550-£800 | £700-£1,300 | £1,300-£2,200 |
| Kit assembly labour | £150-£280 | £280-£480 | £500-£850 |
| Felt roof covering | £50-£100 | £100-£180 | £180-£320 |
| Guttering (add-on, optional) | £70-£120 | £100-£160 | £150-£250 |
| Electrics — lighting + 1 socket circuit | £350-£500 | £400-£550 | £450-£650 |
| Preservative treatment/finish | £50-£90 | £80-£140 | £140-£220 |
| Cost subtotal (excl. kit, no electrics) | £500-£900 | £1,000-£1,800 | £2,000-£3,300 |
| Cost subtotal (excl. kit, with electrics) | £850-£1,400 | £1,400-£2,350 | £2,450-£3,950 |
| Quoted price ex VAT (excl. kit, no electrics), 25-30% margin | £650-£1,150 | £1,300-£2,300 | £2,550-£4,200 |
| Quoted price ex VAT (excl. kit, with electrics), 25-30% margin | £1,100-£1,800 | £1,800-£3,000 | £3,150-£5,050 |
The "cost subtotal" rows are the sum of the component costs above — never quote these figures directly to a client. Apply your margin (see worked examples and the "What margin should I target" FAQ below) to reach the quoted price. Figures exclude VAT and the shed kit purchase price itself, which varies significantly by material (timber, metal, plastic), construction quality, and size.
Detailed Guidance
Building the price bottom-up
Price a shed installation in four blocks, then sum:
- Base construction — the groundworks portion; see shed base pricing guide for a full breakdown of sub-base and slab cost buildup by base type
- Assembly labour — erecting the kit: floor/joists (if not part of the base), wall panels, roof structure, door and window fitting
- Weatherproofing and finishing — felting, guttering if specified, preservative treatment
- Electrics (if specified) — cable run, circuit, sockets/lighting, Part P notification
Worked example 1 — small tool shed, 6×4ft, paving slab base, no electrics
Basic overlap-panel shed for garden tool and mower storage, client has purchased the kit, wants it assembled on a simple paving-slab base with felt roof.
| Item | Cost |
|---|---|
| Site clearance and level, 1 hr | £45 |
| Paving slab base, sub-base + slabs | £420 |
| Kit assembly, 2 people, half day | £220 |
| Felt roof covering | £70 |
| Preservative treatment (2 coats) | £60 |
| Cost subtotal | £815 |
| Margin (30%) | £245 |
| Quoted price (ex VAT) | £1,060 |
| Quoted price (inc VAT) | £1,272 |
Worked example 2 — medium shed, 8×6ft, concrete base, lighting only
Family garden shed for bikes and general storage, concrete slab base for durability, single lighting point run from the house consumer unit (no sockets requested).
| Item | Cost |
|---|---|
| Site clearance and level, 2 hrs | £70 |
| Excavation and formwork | £140 |
| Concrete slab base (100mm) | £680 |
| Kit assembly, 2 people, 1 day | £360 |
| Mineral felt roof covering | £140 |
| SWA cable run (12m), trenching, ducting | £280 |
| Consumer unit circuit, single light fitting (electrician, sub'd) | £220 |
| Part P notification/certification | £0 (included in electrician's cert fee) |
| Preservative treatment (2 coats) | £110 |
| Cost subtotal | £2,000 |
| Margin (28%) | £560 |
| Quoted price (ex VAT) | £2,560 |
| Quoted price (inc VAT) | £3,072 |
Worked example 3 — workshop-grade shed, 10×10ft, sloped site, full electrics
Larger workshop shed on a sloped garden requiring extra sub-base depth and levelling, power and lighting circuit for tools, guttering.
| Item | Cost |
|---|---|
| Site survey and setting out | £80 |
| Excavation, extra sub-base for slope, formwork | £420 |
| Concrete slab base (100mm, reinforced) | £980 |
| Kit assembly, 2 people, 1.5 days | £680 |
| Mineral felt roof covering | £260 |
| Guttering | £200 |
| SWA cable run (20m), trenching, ducting | £440 |
| Consumer unit circuit, double socket run + lighting (electrician, sub'd) | £480 |
| Preservative treatment (2 coats, larger area) | £190 |
| Cost subtotal | £3,730 |
| Margin (25%) | £933 |
| Quoted price (ex VAT) | £4,663 |
| Quoted price (inc VAT) | £5,596 |
Base selection — still where the labour lives
The pattern is identical to every garden building in this category: the base construction, not the shed assembly, is where the time and much of the cost sits. A flat-pack shed kit with pre-cut panels goes up quickly once the base is ready and level — the base is what determines whether that's true.
- Paving slab base — cheapest and fastest, suitable for small/light sheds on already-level, well-drained ground
- Concrete slab base — standard for medium and large sheds, or any shed that will hold significant weight (workshop tools, a chest freezer, heavy machinery)
- Plastic grid system — a fast, permeable middle-ground option; still needs a properly compacted hardcore bed underneath, it is not a lay-straight-on-grass shortcut
See shed base pricing guide for full sub-base material costs, ground condition adjustments, and skip/spoil pricing — the numbers scale directly to a shed footprint.
Where this differs from a summer house or garden room quote
A basic tool/storage shed and a summer house or garden room look similar on the surface (both are timber garden buildings) but price very differently. Standard sheds are single-skin timber construction with no insulation requirement, assembled quickly from a simpler kit, and rarely carry a full electrical circuit beyond a light and maybe a socket. Summer houses and garden rooms are typically larger, better-finished, sometimes insulated for year-round use, and much more likely to need a full power circuit for genuine use as a home office or leisure space. If a client's brief starts drifting from "storage shed" toward "somewhere I can sit and work," re-quote against the summer house/garden room pricing structure — see summer house installation pricing guide and garden room pricing guide — not the shed pricing in this guide.
Electrics — price as a separate electrical job
Any shed with power or lighting is an electrician-priced job, not a labourer running a cable off an extension lead (which is not compliant, not safe for permanent use, and not something to offer a customer even as a budget option):
- SWA armoured cable buried at a minimum of 450mm in open ground — see armoured cable for gland types and burial depth by location
- The circuit must be Part P notified — either via a registered competent-person-scheme electrician (self-certifying) or Building Control notification for a non-registered installer
- For a workshop shed with power tools, discuss whether a dedicated circuit (rather than a spur off an existing circuit) and additional socket capacity is needed before quoting — this changes the electrical scope materially
Red flags — load the price or step back
- Sloping or uneven plot — never price the base as flat without a site visit; sloped ground needs cut-and-fill or a stepped/raised base
- "It's just a small shed" but the client wants power tools running from it — reprice as a workshop-grade electrical job, not a light-and-socket afterthought
- No confirmed access for base materials — a long barrow run or no side gate access can add significant labour time to what looks like a simple job
- Client expects the base laid straight on grass or soil — explain the sub-base requirement; a shed without one will settle unevenly and cause door/roof issues within a season
Frequently Asked Questions
Why does the base cost more than the shed assembly itself on a small job?
Most of the labour and a meaningful share of the material cost on a small shed job is in the base — excavating, compacting a sub-base, and laying slabs or pouring concrete — not in bolting together a pre-cut flat-pack kit. This is true across nearly every garden building category; a shed is simply the smallest, cheapest example of the same pattern seen in summer houses and garden rooms.
Does a garden shed need planning permission or Building Regulations approval?
Most domestic sheds fall under GPDO Class E permitted development and don't need planning permission, subject to height and boundary-proximity limits. Sheds under 15m² floor area with no sleeping accommodation are fully exempt from Building Regulations. Electrics always need Part P notification regardless of the shed's own exemption status. Check total garden outbuilding coverage (shed plus any existing garage, greenhouse, summer house) stays under the 50% limit before assuming permitted development applies.
Should I supply the shed kit myself or assemble a client-purchased one?
Both are common. Supplying it yourself gives you control over quality and adds a materials margin, but ties up cash flow. Assembling a client-purchased kit is lower risk and quicker to quote — but inspect the kit on delivery and note any damage or missing parts in writing before starting, so you're not held responsible for kit quality issues that aren't yours.
What margin should I target on shed installation?
25-30% is typical, similar to other small garden building work. Push toward the higher end on quick, straightforward paving-base-and-assembly jobs where risk is low and the job is largely predictable; toward the lower end on larger workshop-grade sheds with groundworks and electrics, where cost variability (ground conditions, electrician sub-contract pricing) is higher.
How much extra should I charge for a sloped or difficult site?
Add 25-50% to the base construction cost for a sloped site needing levelling, cut-and-fill, or a raised/stepped base compared with a flat, accessible plot. Always visit the site before quoting — slope, access and existing garden structures materially change the base cost on even a small shed job.
Regulations & Standards
Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class E — permitted development rights for outbuildings including garden sheds
Building Regulations 2010 — exemption thresholds for outbuildings under 15m²/30m² without sleeping accommodation
Building Regulations Part P — electrical safety notification requirement for any power supply to a garden building
BS 8417:2024 — preservative treatment specification for timber, relevant to base and structural timber durability
BS 7671:2018+A4:2026 — Wiring Regulations, governing the electrical installation if power is supplied to the shed
BS 8500 / BS EN 206 — concrete specification (C20/C25 designation) for domestic shed bases
shed base pricing guide — detailed base construction pricing this guide scales for standard shed footprints
summer house installation pricing guide — pricing for larger leisure garden buildings, a step up in scope from a basic shed
garden room pricing guide — pricing for insulated, habitable garden buildings
outbuildings regs — full permitted development and Building Regs exemption conditions for garden structures
armoured cable — SWA cable specification and burial depth for running power to outbuildings