Summary
Painting and decorating has the lowest barrier to entry of any UK trade and that shows in the spread of rates. On the same street you will find someone charging £120 a day with no insurance and a time-served decorator charging £300 and booked three months ahead. Customers who only compare the headline number cannot tell the difference until the first winter shows what was and was not prepared properly. Your job when setting a rate is to price the decorator you actually are, cover every cost of being in business, and then explain the number in a way a customer can follow.
The commonest mistake is to work backwards from "what the customer will pay" rather than forwards from "what it costs me to open the van door". A decorator who charges £180 a day, bills 170 days a year and spends £9,000 on van, insurance, tools, phone, software and accountancy is earning £21,600 before tax and holiday — less than an employed decorator on a site. The second commonest mistake is to quote per room from memory and then discover the ceilings are Artex, the woodwork is gloss over gloss and the customer wants three colours. Day rate is the foundation even when you present a fixed price: every fixed-price quote is a day-rate calculation with the days hidden.
This guide shows how to build a day rate from your own costs, what the market is paying by region and by type of work, how to convert it into hourly, half-day and per-m² prices without losing money on short jobs, and how to present it so the customer understands why preparation is where the money goes. For the general method that applies across all trades see pricing labour and pricing guide; for turning a day rate into a safe hourly rate see day rate to hourly rate calculator.
Key Facts
- National day rate, 2026 — £170–£260 for a time-served self-employed decorator outside London and the South East; the bottom of that range is improver level or rural, the top is specialist finishes and strong local reputation
- South East (excluding London) — £220–£320; Surrey, Berkshire, Hertfordshire and the Home Counties commuter belt price close to London
- London — £250–£380+; Inner London period property work with high ceilings, lining paper and heritage colours regularly exceeds £350
- Hourly equivalent — £25–£45; derive it from the day rate divided by 6.5–7 billable hours, not by 8, and never offer it without a minimum charge
- Half-day minimum — £100–£160; a two-hour touch-up still costs a morning once travel, setup, masking and clean-down are counted
- Billable days per year — 190–210 is realistic for a sole trader after weather (exterior work), quoting, holidays, sickness and admin; use this, not 250, when working out what you need per day
- Materials markup — 15–25% on trade cost is standard; the markup covers collection time, wastage, storage and the risk of a tin being the wrong batch — it is not profit on labour
- Per-m² alternative — £4–£12/m² for walls and ceilings, two coats, on a straightforward repaint (see interior painting pricing guide); per-m² only works when the surface condition has been inspected
- Typical daily output — 40–60m² of walls and ceilings, two coats of emulsion, on sound prepared surfaces; 15–25m² where filling, sanding and caulking are needed; 8–15 linear metres of woodwork undercoat and gloss per day on top of that
- Labourer/improver — £100–£160 per day; a two-person team of decorator plus improver typically prices at £280–£400 per day outside London
- VAT — registration is compulsory once taxable turnover exceeds £90,000 in a rolling 12-month period; below that, state "no VAT" clearly, because a registered competitor's £250 is really £300 to a domestic customer
- Insurance — public liability of £1–£2 million is the floor; many letting agents and managing agents require £5 million. Budget £150–£400 a year and build it into the day rate
- Travel — build a local radius (commonly 10–15 miles) into the day rate; beyond it charge £0.45–£0.65 per mile or an hour of time, and say so in the quote
- Consumer Rights Act 2015 — where no price is agreed in advance the customer owes a "reasonable" price; a written day rate and estimated days, agreed before you start, removes the argument
- COSHH — solvent-based paints, spirit-based primers and strippers are hazardous substances under the Control of Substances Hazardous to Health Regulations 2002; the time spent on extraction, PPE and safe disposal is part of your day, not an extra
- Work at height — the Work at Height Regulations 2005 apply to every stairwell and every exterior elevation; tower hire or scaffolding for exteriors is a pass-through cost plus handling, never absorbed into the day rate
- Waste — paint tins, dust sheets and stripped paper are controlled waste under the Environmental Protection Act 1990 s.34; you need a waste carrier registration to carry it away commercially and the tip fees belong in the quote
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Rate structure | Regional (outside London/SE) | South East | London | Use it for |
|---|---|---|---|---|
| Day rate (one decorator) | £170–£260 | £220–£320 | £250–£380+ | Any job over one day; the base for all fixed prices |
| Half-day minimum | £100–£160 | £130–£190 | £160–£230 | Touch-ups, one-wall repaints, snagging visits |
| Hourly (with minimum) | £25–£38 | £32–£45 | £38–£55 | Diagnostic visits, insurance assessments |
| Decorator + improver (per day) | £280–£400 | £350–£480 | £400–£560 | Whole-house and exterior jobs |
| Per m² walls/ceilings, two coats, prepared | £4–£7 | £6–£9 | £8–£12 | Large plain areas, new-build, landlord repaints |
| Per door (both faces, frame, undercoat + gloss) | £60–£100 | £80–£120 | £100–£150 | Woodwork schedules |
| Wallpaper hanging, per roll (standard paper) | £25–£45 | £35–£55 | £45–£70 | Feature walls and full rooms |
| Materials | Cost + 15–25% | Cost + 15–25% | Cost + 15–25% | Everything |
Detailed Guidance
Building the day rate from your own numbers
Start with what you need to take home, add every cost of trading, and divide by the days you can actually bill. A worked example for a sole-trader decorator outside London:
| Item | Annual figure |
|---|---|
| Target income before tax (what you need to live on and save) | £36,000 |
| Van: finance or depreciation, insurance, tax, servicing, fuel for work | £6,500 |
| Public liability insurance (£2m) and tools cover | £450 |
| Tools, brushes, rollers, sheets, sundries not chargeable to jobs | £1,200 |
| Phone, software, website, advertising | £1,100 |
| Accountant and bookkeeping | £700 |
| Training, trade association, CSCS card where needed | £300 |
| Pension contribution | £2,400 |
| Total required | £48,650 |
Divide by 200 billable days and the break-even day rate is £243. Charge £180 and you are not a cheap decorator, you are an underpaid one. That number is the floor for pricing a fixed-price job too: a room you estimate at 2.5 days is £608 of labour before a single tin of paint.
If your realistic billable days are lower — you do mainly exterior work and lose six weeks to weather — the rate rises. Exterior-heavy decorators often run on 170–180 billable days and need £270+ to earn the same.
Regional and job-type variation
The regional spread in the tables tracks living costs and demand, but within any region the type of work moves the rate by £50–£100 a day:
- Landlord and new-build repaints — plain emulsion on sound surfaces, often repeat work, priced at the bottom of the range or per m². Volume compensates for rate.
- Occupied family homes — furniture moving, masking, dust control and working round the household add 15–25% to the time for the same area. Price at mid-range and explain why.
- Period property and heritage finishes — lining paper, limewash and distemper, multiple colours, intricate woodwork and high ceilings. Top of the range; see heritage paints.
- Spraying — airless spraying of new-build or empty properties can treble daily output, which is the only situation in which a per-m² price well below the hand-applied rate still pays; see spraying vs rolling.
- Exterior — scaffold or tower time, weather risk and masonry preparation; see exterior painting pricing guide for the full breakdown.
Converting day rate to hourly, half-day and fixed price
Never divide a day rate by eight. A decorator's day contains perhaps 6.5–7 hours of brush time once travel, loading, masking, breaks and clean-down are allowed for. A £240 day rate is therefore about £35 per hour of actual work. A two-hour job at £35 × 2 = £70 loses money, because the hour of travel and the half-hour of setup and clean-down have not shrunk. That is why the half-day minimum exists: £100–£160 for anything that cannot be fitted into an existing day on site. The full logic, with the arithmetic, is in day rate to hourly rate calculator.
For a fixed price, estimate the days honestly and multiply by the day rate, then add materials at cost plus markup. A standard 4m × 4m living room, walls and ceiling two coats of emulsion plus skirting and one door in undercoat and gloss, on sound surfaces:
| Element | Days / quantity | Cost |
|---|---|---|
| Preparation: fill, sand, caulk, mask, sheet up | 0.5 day | £120 |
| Ceiling and walls, two coats emulsion (approx. 55m²) | 1.0 day | £240 |
| Woodwork: skirting, door, frame, undercoat and gloss | 0.75 day | £180 |
| Materials: 10L matt emulsion, 2.5L ceiling white, 1L undercoat, 1L gloss, filler, caulk, sundries — trade cost £95 + 20% | — | £114 |
| Total (not VAT registered) | 2.25 days | £654 |
That lands inside the £350–£650 range in interior painting pricing guide for a room of this size and tells you where the range comes from: a plain repaint with no woodwork sits near £350, a full room with gloss work near £650. Paint quantities come from paint coverage rates and paint coverage.
Where the money goes: preparation
Customers see painting and assume that is what they are paying for. On most domestic jobs preparation is 40–60% of the time. Build the quote around it and say so in the quote: "Day 1: protect floors and furniture, fill and sand walls, caulk gaps to skirting and architrave, spot-prime. Days 2–3: two coats to ceiling and walls, undercoat and gloss to woodwork." A customer who has read that does not question why you spent the first morning with a filling knife, and a competitor who quoted £150 less by skipping it is visibly offering less.
Specific preparation items that justify their own line in the quote rather than being absorbed:
- Stripping wallpaper: £1.50–£3.00/m² and a day's drying before anything else
- Artex ceilings: scrape-and-skim or overboard is a plastering job (and pre-2000 Artex may contain asbestos — see artex asbestos); never quote to "paint over" without inspecting
- Gloss over old gloss: full key and adhesion primer, or the new coat peels within a year
- Stain blocking on water-damaged ceilings: dedicated stain block, not another coat of emulsion — see damp stain blocking
- Nicotine-stained rooms: wash down and stain block, roughly double the preparation time
Materials markup, trade accounts and paint choice
Buy on a trade account and charge the customer trade cost plus 15–25%. The markup is not a hidden profit on labour; it pays for the trip to the merchant, the odd tin that does not match, the half-tin left over and the storage. Where a customer insists on supplying their own paint, drop the markup but add a line making clear that coverage, colour match and finish are their responsibility, and that extra coats to achieve opacity are charged at the day rate. Cheap "one coat" products that need three coats cost the customer more in your time than the premium tin would have.
Specifying paint to a recognised classification helps when quality is challenged later: interior wall and ceiling coatings are classified for scrub resistance and opacity under BS EN 13300:2001, and general practice for painting buildings — surface preparation, coating systems, maintenance intervals — is set out in BS 6150:2019.
Travel, access and the things that are not in the day rate
State in writing what the day rate includes. A clear quote lists: working hours (for example 8am–4.30pm), travel radius included, dust sheets and masking, disposal of paint tins and stripped material, and that scaffold or tower hire for exterior or stairwell work is charged at cost plus 10–15%. It then lists what is not included: moving heavy furniture, repairs to plaster beyond minor filling, electrical disconnection of fittings, and any work found once paper is stripped. Finding damp or blown plaster behind wallpaper is the classic unknown; the right response is a variation agreed before you carry on — see variation orders.
Raising your rate
Review the rate every January against your real costs for the previous year. If you were booked more than six weeks ahead for most of the year, you are under-priced; raise the rate by £20–£30 for new enquiries and keep existing quotes at the agreed figure. Tell repeat customers in advance and give a date. A decorator with a full diary at £200 who raises to £230 loses perhaps one enquiry in ten and earns 15% more for the same hours. For how to present an increase without losing regulars see price increase.
Frequently Asked Questions
Should I quote a day rate or a fixed price for decorating?
Fixed price for defined work where you have seen the surfaces: rooms, exteriors, whole houses. Day rate for open-ended work — stripping paper of unknown age, restoring neglected woodwork, working alongside other trades on a refurbishment where the sequence is outside your control. Either way the fixed price is built from the day rate, so the day rate comes first. Where you give a fixed price, write the assumed number of days into the quote so a customer can see how an extra request becomes an extra day.
How do I justify £250 a day when someone on a local Facebook group is offering £120?
Explain what the number buys: insurance that protects their home, proper preparation that stops the paint failing, a written quote, a VAT position they can rely on, and a decorator who will still be trading when they want the next room done. Then show the breakdown. Most customers who go for the £120 quote were never going to be your customer, and a proportion will call you a year later to put it right at full rate.
Do I need to charge VAT on my day rate?
Only once your taxable turnover in any rolling 12 months exceeds £90,000, at which point registration is compulsory and your prices to domestic customers effectively rise by 20%. Many decorators deliberately stay below the threshold; others register voluntarily to reclaim VAT on a new van and materials, which only makes sense if most of your customers are VAT-registered businesses or landlords who can reclaim it. See vat registration for tradespeople for the decision.
What do I charge for an improver or labourer working with me?
£100–£160 per day for their time, charged as a separate line, and only when they genuinely add output — a second pair of hands on a whole-house repaint or an exterior, not on a single room where you would be in each other's way. If you are paying them as an employee or through CIS, make sure their day rate to you plus employer costs is comfortably below what you charge the customer for them.
Is charging per m² a good idea?
Only for large, plain, inspected areas: new-build, empty rentals, commercial corridors. For occupied homes with woodwork and preparation it undercharges every time, because the m² rate assumes an average surface condition that the actual room rarely matches. If a customer asks for a per-m² rate, give one that is clearly labelled "sound prepared surfaces, two coats, walls and ceilings only" and quote woodwork, preparation and paper stripping separately.
Regulations & Standards
Consumer Rights Act 2015 — implies a term that services are performed with reasonable care and skill and, where no price is agreed, that a reasonable price is paid; written quotes and agreed day rates are the practical protection
Value Added Tax Act 1994 and current registration threshold — compulsory registration once taxable turnover exceeds £90,000 in any rolling 12-month period
Control of Substances Hazardous to Health Regulations 2002 (COSHH) — solvent-based coatings, strippers and dust from sanding old paint are hazardous substances requiring assessment, control and PPE
Work at Height Regulations 2005 — applies to stairwells, ceilings and all exterior work; ladders only for short-duration low-risk tasks, towers and scaffolds otherwise
Construction (Design and Management) Regulations 2015 (CDM 2015) — applies to all construction work including decorating; domestic client duties pass to the contractor
Environmental Protection Act 1990, s.34 (duty of care) and waste carrier registration — commercial carriage of waste paint, tins and stripped material requires registration with the Environment Agency (England), Natural Resources Wales or SEPA
Volatile Organic Compounds in Paints, Varnishes and Vehicle Refinishing Products Regulations 2012 — VOC limits on decorative coatings sold in the UK
Control of Asbestos Regulations 2012 — textured coatings applied before 2000 may contain chrysotile; sampling before sanding or scraping
BS 6150:2019 — Painting of buildings: code of practice covering surface preparation, coating systems and maintenance
BS EN 13300:2001 — Paints and varnishes: water-borne coating materials for interior walls and ceilings, classification by scrub resistance, opacity and gloss
GOV.UK — VAT registration thresholds — current compulsory registration threshold
GOV.UK — Consumer Rights Act 2015 — reasonable price and reasonable care and skill provisions
HSE — COSHH basics — hazardous substance assessment and control
HSE — Work at height — Work at Height Regulations 2005 guidance
Painting and Decorating Association — trade body guidance and member standards
BSI — BS 6150:2019 Painting of buildings — code of practice
pricing labour — UK trade day rates by trade and region, the baseline this guide refines for decorators
day rate to hourly rate calculator — why dividing by eight loses money and how to set a minimum charge
interior painting pricing guide — room-by-room and per-m² interior painting prices built from the day rate
exterior painting pricing guide — exterior pricing including access, weather and masonry preparation
paint coverage rates — litres per m² by product type for accurate materials lines
handyman hourly rate pricing guide — the same rate-structure logic applied to general handyman work
vat registration for tradespeople — when to register and how it changes domestic pricing
variation orders — agreeing extras when stripped paper reveals more work