Summary
Decking is the highest-margin garden landscaping job available to a competent carpenter — and also the most commonly bodged. The visible part (the boards) is easy. The invisible part (the sub-frame, foundations, joist sizing, ground preparation, fixing detail) is what separates a deck that lasts 25 years from one that sags, twists, and rots within five.
The major pricing tier is set by material. Softwood is the volume material — UK tanalised pine or spruce, ~£15–£25/m² for the boards alone. Hardwood (oak, balau, ipe) is the premium look, ~£55–£120/m² for boards. Composite (Trex, Millboard, Hyperion, Ecodek) is the maintenance-free contemporary option, ~£55–£130/m² for boards. The sub-frame for any of these costs roughly the same — treated C24 joists at 47×150mm on concrete pad foundations is £30–£60/m² in materials and another 2–3 hours per m² in labour.
Where most cowboys lose money is treating the deck as a 1-day job for a £50 day-rate price. A 20m² deck done properly is 4–6 days for a 2-person crew including foundations, sub-frame, boards, balustrade, and clear-up. Underquoting this is endemic and the customer ends up with a bouncy, twisted, rapidly-rotting deck.
This guide covers material selection, sub-frame design, regulatory requirements (planning, Part K, Part A), and a worked pricing breakdown.
Key Facts
- Softwood deck board (treated pine/spruce 28×145mm) — £4.50–£8.50/m or £15–£25/m²
- Premium kiln-dried softwood (Siberian larch, Scandinavian redwood) — £7–£14/m or £22–£42/m²
- Hardwood deck board (oak, balau, iroko) — £18–£32/m or £55–£100/m²
- Premium hardwood (ipe, cumaru) — £25–£45/m or £75–£130/m²
- Composite deck board (uncapped) — £20–£35/m or £45–£75/m²
- Composite deck board (capped, premium — Trex Transcend, Millboard Enhanced Grain) — £30–£55/m or £75–£130/m²
- Treated softwood joist (47×150mm C16/C24) — £6–£12/m
- Treated softwood joist (47×195mm — for long spans) — £8–£16/m
- Aluminium composite sub-frame system — £35–£65/m² (premium full system)
- Concrete pad foundation (450×450×450mm) — £15–£30 each in materials (excluding labour)
- Postcrete (rapid-set) — £7–£14 per 25kg bag
- Joist hangers (galvanised, BS EN 845-1) — £2–£8 each
- Decking screws (stainless 304/A2, 60–80mm) — £18–£35 per 250 box
- Hidden clip composite fixings — £35–£65 per box (covers ~2–3m²)
- Carpenter/landscaper day rate — £200–£320/day regional, £260–£400/day London
- Specialist deck installer (composite/large) — £280–£450/day
- Joist centres — Composite: 400mm max (most manufacturers); Timber: 400–450mm typical; reduces to 300mm on diagonal-laid composite
- Span tables (decking joists, BS 5268-7 / BS EN 1995) — 47×150mm C24 joist, 400mm centres: max clear span ~2.4m for decking loads
- Treated timber spec — Use Class 3 or 4 per BS 8417 (in ground or in contact with damp surfaces)
- Planning permission threshold — Deck >300mm above ground level OR exceeding 50% of garden coverage = full planning per GPDO 2015 (England)
- Building Regulations Part K — Guard-rail (balustrade) required where fall is >600mm; min 1.1m high in domestic; balusters <100mm gap
- Building Regulations Part A — Structural; large or elevated decks may need Building Control sign-off
- CDM 2015 — Single-dwelling domestic work over 30 days = client duties apply
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Material | Boards (£/m² supply) | Sub-frame (£/m² supply) | Labour (£/m²) | Total installed (£/m²) | Lifespan |
|---|---|---|---|---|---|
| Treated softwood (standard) | £15–£25 | £25–£40 | £40–£75 | £80–£140 | 12–20 yrs |
| Premium softwood (larch, redwood) | £25–£42 | £25–£40 | £45–£80 | £100–£165 | 20–30 yrs |
| Hardwood (oak, balau, iroko) | £55–£100 | £30–£50 | £60–£110 | £160–£260 | 25–40 yrs |
| Hardwood (ipe, cumaru — premium) | £75–£130 | £30–£50 | £65–£120 | £190–£310 | 30–50 yrs |
| Composite uncapped | £45–£75 | £35–£60 | £60–£100 | £150–£235 | 20–25 yrs |
| Composite capped (premium) | £75–£130 | £35–£65 | £65–£105 | £180–£300 | 25–35 yrs |
| Aluminium-frame composite system | £75–£130 | £55–£90 | £65–£110 | £200–£330 | 30–40 yrs |
| Job size | Material mix | Typical price (2026) |
|---|---|---|
| Small deck 10m² | Softwood | £900–£1,500 |
| Small deck 10m² | Capped composite | £1,800–£3,200 |
| Medium deck 20m² | Softwood | £1,700–£3,000 |
| Medium deck 20m² | Hardwood | £3,400–£5,500 |
| Medium deck 20m² | Capped composite | £3,800–£6,200 |
| Large deck 35m² with balustrade + steps | Capped composite | £7,500–£12,000 |
| Raised deck 25m² with steps + balustrade (over 600mm) | Hardwood | £6,000–£10,500 |
Detailed Guidance
What to ask the customer at quote
- Use case — entertaining/BBQ (size for table + chairs), kids play, hot tub (separate structural design), garden seating area
- Material preference — show samples; composite is much more expensive but no maintenance
- Height above ground — drives sub-frame complexity, balustrade requirement, planning
- Garden coverage — does the proposed deck exceed 50% of garden area? Planning issue under GPDO
- Position — close to house (consider DPC level), in middle of garden (full sub-frame), against fence (joist hanger to neighbour structure not allowed)
- Access — wheelbarrow/skip route, dig spoil disposal
- Existing surface — grass (full sub-frame), concrete (pads not needed), patio (build over or strip)
Sub-frame design — the bit that matters
A bad sub-frame ruins any deck regardless of board cost. Key rules:
Joist sizing (per BS 5268-7 / BS EN 1995-1-1):
- 47×100mm C16 — max span ~1.5m at 400mm centres
- 47×150mm C16 — max span ~2.2m at 400mm centres
- 47×150mm C24 — max span ~2.4m at 400mm centres
- 47×195mm C24 — max span ~3.0m at 400mm centres
- For composite boards, use 400mm centres maximum (most manufacturers)
- For 45° diagonal-laid boards, reduce centres to 300mm
Foundations:
- Concrete pads (450×450×450mm minimum) at 1.5–1.8m centres under bearers
- Pad top should be above ground level (use slab/spacer to keep posts off wet earth)
- Adjustable steel pedestals on concrete are an alternative on hard surfaces
Bearers and posts:
- Treated softwood C24 posts 100×100mm minimum
- DPC strip (5–10mm bituthene) between post base and concrete pad to prevent wicking
- Posts bolted to galvanised post anchors (Simpson, Easyfix) — not buried in concrete
Joist hangers and connections:
- BS EN 845-1 stainless or sherardised joist hangers (see joist hangers and sizing)
- Sherardised square-twist nails (NOT round wire) per BS 1202 spec
- Stainless screws for board fixings — ungalvanised mild steel will rust within 3 years and stain boards
Cross-bracing and noggins:
- Mid-span noggins on any joist >1.8m to prevent twisting
- Diagonal cross-bracing under raised decks for lateral stability
Composite vs timber — when to recommend each
Recommend softwood when:
- Tight budget
- Customer OK with annual oiling/staining
- Lower deck (<300mm) with simple geometry
- Short-term ownership (renting out / planning to move)
Recommend hardwood when:
- Long-term own-home installation
- High-end aesthetic important
- Customer wants natural silver-grey weathering (oak, balau) or rich brown maintained (ipe)
- Budget mid-range
Recommend capped composite when:
- Customer hates maintenance — no oiling, no sanding, no staining
- Family with kids/pets (splinter-free, no rough surface)
- Pool/hot tub deck (water-resistant, slip-rated boards available)
- 20+ year ownership planned
- Budget for premium
Don't recommend uncapped composite — fading, staining, scratching issues; capped is worth the £10–£20/m² premium.
Balustrade — Part K requirements
Building Regulations Part K (Protection from falling, collision and impact) applies to decks. Trigger thresholds:
- Fall height >600mm = balustrade required
- Domestic balustrade height: 1.1m above deck surface
- Baluster gap: max 100mm (no sphere of 100mm should pass through)
- Loading: 0.74 kN/m horizontal line load on top rail
- Step on/off (e.g. to garden) does not need balustrade if fall is <600mm
Material options:
- Treated softwood balustrade — £35–£85/m (cheapest, matches softwood deck)
- Composite balustrade — £85–£180/m
- Stainless or aluminium wire/cable balustrade — £120–£280/m
- Glass balustrade (frameless) — £280–£550/m (premium)
Steps and access
Steps to and from the deck price separately:
- Treated softwood step — £55–£140 per linear metre of riser
- Composite step — £85–£180 per linear metre
- Step rise should be 150–175mm consistent (per Part K)
- Step going (depth) 280–340mm typical for decking
Planning permission and Building Regulations
Planning permission required when:
- Deck >300mm above natural ground level (GPDO 2015 Class E)
- Deck + other outbuildings cover >50% of garden
- Property in conservation area, AONB, national park, or listed (Article 4 Direction)
- Deck within 2m of boundary >2.5m high
Building Regulations approval required when:
- Structural deck (e.g. cantilever, attached to dwelling, hot tub support)
- Deck forms means of access from above-ground floor
- Raised deck where guard-rail under Part K applies (most installers don't apply for this routinely; technically required for >600mm fall)
Always advise customer to check with Planning department. Quote should state "subject to planning permission / Building Regs approval if required."
Drainage and ground preparation
- Strip turf and 100mm of topsoil from deck footprint
- Lay weed membrane (terram or geotextile) under the deck — prevents weeds growing through
- Slope ground 1:80 away from house for surface water drainage
- Allow airflow under deck — minimum 100mm gap between underside of joists and ground; otherwise condensation rots underside of boards
- Vent the deck perimeter — air bricks or ventilation grilles in skirt at 1–2m centres
Common pitfalls
- Joists not treated to Use Class 3/4 — rot from below within 5 years
- Mild steel screws instead of stainless — rust stains down boards within 18 months
- No DPC between post and concrete pad — water wicks up post, rots base, deck collapses in 8–12 years
- Composite boards at 450mm joist centres — sag/flex within 12 months; manufacturer warranty voided
- Decking butt-jointed without expansion gap — boards push and warp in summer heat
- Quote omits balustrade — customer discovers Part K cost £600–£1,500 after job priced
- No air gap under deck — black mould, rot, smell from rotting timber
- Single board over a span — joints unsupported; always join over a joist
Pricing breakdown for a typical job
A 20m² capped composite deck, ground-level (no balustrade), 4 steps to lawn, single side return:
| Item | Cost |
|---|---|
| Capped composite boards (Trex Enhance or similar) 20m² × £45/m² | £900 |
| Treated softwood C24 joists (47×150mm) 50m × £8/m | £400 |
| Treated softwood C24 bearers (75×150mm) 12m × £14/m | £168 |
| Concrete pads (12 × £20) | £240 |
| Postcrete (10 × £10) | £100 |
| Steel post anchors (Simpson) 8 × £12 | £96 |
| Joist hangers + fasteners | £85 |
| Hidden clip system (composite) | £150 |
| Stainless screws (sub-frame fixing) | £40 |
| Composite fascia trim 14m × £18/m | £252 |
| Composite steps (4 × £130) | £520 |
| Weed membrane + vents | £40 |
| Sundries (DPC, brackets, sealant) | £35 |
| Skip 6-yard (excavation spoil) | £290 |
| Labour: 2 carpenters × 4 days @ £260/day | £2,080 |
| Travel & overhead | £120 |
| Subtotal | £5,516 |
| Markup at 22% | £1,213 |
| Total to customer | £6,729 |
Round to £6,700. Per-m² = £335 — at top end of composite range due to steps + fascia. Compare against £150/m² × 20m² = £3,000 — that's a softwood equivalent. The customer chooses the spec.
Frequently Asked Questions
Do I need planning permission for a deck under 300mm?
In most cases no — under GPDO 2015 it's permitted development if (a) <300mm above ground level, (b) doesn't exceed 50% of the garden coverage when added to other outbuildings/extensions, (c) not in a conservation area / Article 4 / listed building. Always check with local Planning before quoting to protect the customer (and yourself).
How long does a softwood deck really last?
Properly built with C24 tanalised joists, stainless screws, DPC at post bases, and customer applying annual decking oil: 15–25 years. Built badly (untreated joists in contact with soil, mild-steel screws, no maintenance): 5–8 years. The difference is sub-frame quality and aftercare, not board grade.
Why is composite decking so much more than timber?
Material cost. Composite boards are 3–5× the material cost of softwood. Once you factor in the no-maintenance lifetime cost (no annual oil, no sanding, no re-staining, no board replacement), the 25-year total ownership cost of composite is often lower than softwood. But the upfront install price is 2–3× higher.
Can I lay decking over an existing concrete patio?
Yes — and it's cheaper because you skip the foundations. Lay a treated softwood batten sub-frame (47×75mm minimum) directly on the concrete on DPC pads, with 5mm gaps for drainage. Joists at 400mm centres. Check the concrete is level and falls away from house — if not, use packers.
What's the difference between capped and uncapped composite?
Uncapped composite is just compressed wood-flour + polymer; absorbs moisture, fades, stains, and surface degrades within 5–8 years. Capped composite has a polymer shell bonded around the core; UV-stable, stain-resistant, slip-rated, 25-year warranty common. Always quote capped — the £10–£20/m² premium is worth it.
Regulations & Standards
Town and Country Planning (General Permitted Development) (England) Order 2015 — permitted development for decking (Class E)
Building Regulations Part A — Structure (large/raised decks)
Building Regulations Part K — Protection from falling, collision and impact (balustrades, steps)
BS 5268-7-7 (withdrawn but referenced) — Structural use of timber: domestic floors
BS EN 1995-1-1:2004+A2:2014 — Eurocode 5: design of timber structures
BS 8417:2011+A1:2014 — Preservation of wood — Use Classes 1 to 5
BS EN 845-1:2013+A1:2016 — Specification for ancillary components for masonry — Ties and hangers
BS 1202-1:2002 — Specification for nails (sherardised square-twist for hangers)
BS EN 350:2016 — Durability of wood and wood-based products
TRADA Decking design and detailing guidance — industry-recognised technical guide
CDM 2015 — Construction (Design and Management) Regulations applicable to projects >30 days
Approved Document A: Structure — gov.uk
Planning Portal: Decking — Planning Portal
TRADA — Timber Research and Development Association — industry technical guidance
TDCA (Timber Decking and Cladding Association) — decking installation guide — UK trade body
decking installation pricing guide — detailed decking install pricing (companion guide)
decking — decking technique and installation reference
joist hangers and sizing — joist hanger selection per BS EN 845-1