Summary
The conventional-to-combi conversion is the most common upgrade sold to owners of 1960s to 1990s houses with a gravity hot water system, and it is routinely under-quoted by engineers who price it as a boiler swap with a cylinder removal bolted on. It is a different job. The boiler often moves (from the airing cupboard or kitchen to an external wall with a short flue route), the hot water distribution is reversed (combi outlet to taps instead of cylinder outlet), the cold water is re-plumbed to mains throughout, the old vent and feed pipes are removed, the loft is cleared of two tanks and their pipework, the gas run is usually too small for a 30 kW appliance, and the whole system is converted from an open-vented to a sealed arrangement that will reveal every weeping radiator valve the gravity system was tolerating.
Done well it is a two-and-a-half to three-day job for two people and a profitable one. Done as a one-day swap it becomes a week of callbacks: poor hot water flow because nobody measured the main, a kitchen tap that now screams because the mains pressure is 4 bar and nothing was done about it, a radiator that drips because the sealed system runs at 1.5 bar, and a customer who was promised "a combi for £2,500". This guide prices the conversion by its components, sets out the survey that decides whether to do it at all, and gives a worked example. For the boiler supply prices and like-for-like swap pricing see boiler installation pricing guide; for the system type decision see combi vs system vs regular boiler.
Key Facts
- Typical total price — £3,500–£6,500 (three-bed semi, 28–32 kW combi, boiler relocated to an external wall). Add £500–£1,500 for a long flue, a difficult gas run or a four-bed house wanting a 35–40 kW combi
- Programme — 2–3 days for a Gas Safe engineer and a mate; a single engineer alone takes 3–4 days
- Mains water survey — minimum 12 l/min dynamic flow at 1 bar for a 24–30 kW combi; 15 l/min or more for a 35 kW; measure at the kitchen tap with a weir gauge and a pressure gauge with another outlet open. Below 10 l/min, a combi is the wrong appliance (see combi boiler flow rate explained)
- Combi output and hot water — a 24–28 kW combi delivers roughly 10–12 l/min at a 35 °C rise; 30–35 kW roughly 12–14 l/min; 40 kW roughly 16 l/min. One shower at a time is the honest promise for anything under 35 kW
- Gas supply — a 30 kW+ combi typically needs 22 mm from the meter with a maximum 1 mbar pressure drop at the appliance under full load; most 1970s–1990s systems have 15 mm to the old boiler. Allow £300–£600 for a 22 mm upgrade of 10–15 m (see gas pipe sizing)
- Boiler supply — 28–30 kW combi £900–£1,400 trade for mid-range brands, £1,400–£2,400 premium; 35–40 kW £1,200–£2,000
- Boiler Plus (England) — time and temperature control plus one of: weather compensation, load compensation, a smart thermostat with automation and optimisation, or flue gas heat recovery; the control adds £80–£250
- Removals — hot water cylinder, immersion heater and wiring, feed-and-expansion tank, cold water storage cistern, vent and feed pipes, gravity primaries, cylinder thermostat and motorised valves. Cylinder scrap value £20–£60; allow 2–3 hours and a van run
- Sealed system conversion — new filling loop, pressure gauge and PRV discharge are in the boiler; the installer must check every radiator valve gland, every compression joint and the radiators themselves for weeping at 1.5 bar before handover; expect to replace 2–4 radiator valves (£15–£35 each) on an older system
- System clean — BS 7593:2019 requires a clean and inhibitor on conversion; a chemical cleanse and flush £180–£250 or a power flush £350–£550 on a sludged gravity system; a magnetic filter (£45–£95) is required by most manufacturers' warranties
- Flue — standard horizontal flue through an external wall £60–£120; vertical flue kit £150–£300; plume kit where the terminal is near a boundary or opening £60–£120; clearances to Approved Document J and the manufacturer's instructions (see flue clearances and part j)
- Condensate — 22 mm internal run to a waste or soil pipe preferred; external runs in 32 mm insulated pipe with a minimum fall, to the HHIC condensate guidance (see condensate pipe installation)
- Electrical — fused spur at the boiler, removal of the immersion circuit (make safe at the consumer unit and record it), wiring of the room thermostat; not usually notifiable under Approved Document P when no new circuit is added
- Mains pressure — above about 3 bar static, a pressure-reducing valve on the incoming main (£60–£120 fitted) protects the combi and the taps now on mains pressure
- Notification — the installer notifies the installation through the Gas Safe Register's Building Regulations notification scheme (£2–£3 per notification) and the customer receives a Building Regulations Compliance Certificate; the Benchmark checklist in the boiler manual is completed and left with the appliance
- Labour benchmarks — Gas Safe engineer £320–£480 per day regional, £400–£560 London; mate or improver £180–£280 (see gas engineer hourly rate guide)
- Margin — 20–30% gross on the whole job; materials marked up 15–25% on trade
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Component | Scope | Typical price (ex VAT, 2026) |
|---|---|---|
| Survey | Flow and pressure test, gas pipe sizing, flue route, heat loss check | £0–£90 (often credited against the job) |
| Combi boiler, 28–30 kW mid-range, supplied | Boiler, standard flue, filling loop, clock | £1,000–£1,600 |
| Boiler Plus control | Weather compensation sensor or smart thermostat | £80–£250 |
| Strip-out | Cylinder, tanks, immersion, primaries, vent and feed, disposal | £250–£450 |
| Gas supply upgrade | 22 mm from meter, 10–15 m, test and purge | £300–£600 |
| Hot and cold re-plumb | Mains cold to all outlets, combi hot to taps, cap redundant runs | £350–£800 |
| Flue, condensate, PRV discharge | Horizontal flue, 22 mm internal condensate, PRV to outside | £150–£350 |
| Sealed system conversion and leak check | Radiator valve glands, joints, 2–4 valves replaced, expansion check | £150–£350 |
| System clean and protection | Chemical cleanse or power flush, inhibitor, magnetic filter | £300–£650 |
| Electrical | Fused spur, stat wiring, immersion circuit made safe | £120–£250 |
| Making good | Boxing in, filling flue and pipe holes, floorboards, airing cupboard shelf | £150–£400 |
| Notification and handover | Gas Safe notification, Benchmark, commissioning, customer demonstration | £60–£120 |
| Labour (engineer and mate, 2.5–3 days) | £1,500–£2,200 |
Detailed Guidance
Step 1 — the survey that decides the job
A combi makes hot water from the incoming main, so the main decides whether the conversion is a good idea. Before pricing anything:
- Dynamic flow and pressure. At the kitchen cold tap, measure flow with a weir gauge with the bath cold tap also running, and pressure with a gauge on the outside tap under the same conditions. Record both. A 28–30 kW combi needs a dependable 12 l/min at 1 bar; a 35 kW needs 15 l/min; a 40 kW with two showers in use needs 18–20 l/min. A house on an old lead or 15 mm main delivering 8 l/min gets a poor combi whatever you fit, and the honest advice is a system boiler and an unvented cylinder, or a main replacement first (see lead pipe replacement pricing guide).
- Hot water demand. Count bathrooms and ask how they are used. Two showers running together is a 35–40 kW combi at best and realistically a cylinder. Set the expectation in writing: a combi serves one outlet at full flow.
- Gas supply. Trace the gas run from the meter and measure the pipe. Size it for the new appliance's maximum gas rate plus any other appliances, with a 1 mbar maximum drop. A 15 mm run of more than a few metres will not carry a 30 kW combi.
- Boiler position and flue. The ideal position is an external wall near the kitchen and bathroom, with a short horizontal flue meeting Approved Document J clearances and the manufacturer's distances from openings and boundaries, a condensate route to an internal waste, and a PRV discharge route to outside.
- Pipework condition. Look at the radiator valves, the pipework under floors and any microbore. A gravity system that has been topped up from the tank for 30 years may hold sludge and weeping joints that a sealed system at 1.5 bar will expose. Price a power flush and a valve allowance accordingly.
- Mains pressure. Above 3 bar static, specify a pressure-reducing valve.
The survey takes an hour and either confirms the conversion or saves the customer from a bad one. Charge for it or credit it; do not skip it.
Step 2 — strip-out
The removal list is longer than a swap: boiler, hot water cylinder (drain first; a 120-litre cylinder weighs 120 kg full), immersion heater and its circuit, cylinder thermostat, motorised valves and wiring centre if the new control scheme does not reuse them, feed-and-expansion tank, cold water storage cistern, their float valves, overflows and insulation, the open vent and cold feed pipes, and the gravity primaries if they are not reused as heating flow and return. The loft work alone is two hours for two people and a skip or a van run. Cap and label the redundant pipework rather than leaving it live and dead-legged, and photograph the loft before and after for the customer.
Step 3 — gas, flue and condensate
Run the new 22 mm gas supply, test the whole installation for tightness to IGEM/UP/1B and confirm the working pressure at the appliance under full load. Fit the boiler and flue to the manufacturer's instructions and Approved Document J, with a plume kit where the terminal would otherwise discharge towards a neighbour's window or across a boundary. Run the condensate internally where possible, in 22 mm with continuous fall to a waste, soil stack or condensate soakaway; an external run must be 32 mm, insulated and as short as possible. Run the PRV discharge to outside, visible and safe.
Step 4 — hot and cold re-plumb
In a gravity house the cold water storage cistern fed the hot water cylinder and usually the bathroom cold taps and WC; only the kitchen cold tap and perhaps an outside tap were on the main. After conversion everything is on the main. The cold supply to the bathroom and WC is connected to the mains distribution (often by reusing the tank-fed drop as a mains-fed pipe once its tank connection is cut and capped), and the combi's hot outlet is connected into the old hot distribution at the point where the cylinder outlet used to feed it. Check that no dead legs remain and that any old 22 mm gravity hot distribution does not leave the customer waiting for hot water at distant taps; a combi delivers hot water at mains flow, and a 22 mm run to a basin takes a long time to purge. Where taps and shower valves were low-pressure types (gravity-rated mixers, some older electric showers with a tank-fed supply), confirm they are rated for mains pressure or price replacements (see thermostatic vs manual mixer shower comparison).
Step 5 — sealed system, clean and controls
Convert the heating circuit to sealed: the combi carries the expansion vessel, pressure gauge, PRV and filling device. Check the expansion vessel size against the system volume (a large house with big radiators may need an additional vessel). Fill, pressurise to 1.0–1.5 bar and walk the house checking every valve gland and joint; a gravity system typically produces two to four weeping glands or compression nuts at this point, which is why a valve allowance belongs in the quote. Carry out the clean and flush to BS 7593:2019, dose with inhibitor, fit the magnetic filter on the return, and commission to the Benchmark checklist including gas rate, combustion analysis, flow and return temperatures, and DHW flow and temperature (see system cleansing inhibitors and central heating commissioning).
Boiler Plus in England requires a time and temperature control plus one of weather compensation, load compensation, a smart thermostat with automation and optimisation, or flue gas heat recovery; the weather compensation sensor supplied by most manufacturers is the cheapest route and the one that most improves efficiency (see weather compensation controls).
Step 6 — electrical and making good
The boiler needs a fused spur; the immersion heater circuit is removed back to the consumer unit or made safe and labelled; the room thermostat is wired or paired. None of this is normally notifiable under Approved Document P because no new circuit is created, but a Minor Works Certificate for the fused spur is good practice. Making good includes filling the old flue hole, boxing in or clipping the new pipework, replacing floorboards, and often fitting a shelf in the airing cupboard where the cylinder stood, which is the detail customers remember.
Worked example: three-bed semi, boiler moved from airing cupboard to kitchen external wall
| Item | Price |
|---|---|
| 30 kW combi, mid-range brand, horizontal flue kit, filling loop | £1,350 |
| Weather compensation sensor (Boiler Plus) | £110 |
| Strip-out: cylinder, two tanks, immersion, vent/feed, disposal | £350 |
| 22 mm gas supply from meter, 12 m, tightness test | £450 |
| Hot and cold re-plumb, cap redundant runs, PRV on incoming main | £620 |
| Condensate to kitchen waste, PRV discharge to outside | £120 |
| Sealed system conversion, three radiator valves replaced | £220 |
| Power flush, inhibitor, magnetic filter | £520 |
| Fused spur, immersion circuit made safe, stat wiring, MWC | £180 |
| Making good: flue hole, boxing, floorboards, airing cupboard shelf | £280 |
| Gas Safe notification, Benchmark, commissioning, handover | £90 |
| Labour: engineer 3 days, mate 2.5 days | £1,850 |
| Total | £6,140 |
Materials at trade come to roughly £2,600, labour £1,850, and the balance is overhead and margin at about 25%, which is appropriate for a job with this many interfaces. Quoting it at £3,800 "because that's what combis cost" means working the third day for free and absorbing every weeping valve.
What to write into the quote
- The measured mains flow and pressure, and the hot water performance the customer should expect (one outlet at full flow; litres per minute at a stated temperature rise)
- Boiler make, model and output, flue route and terminal position
- Gas supply upgrade as a priced item
- Strip-out list including loft tanks, and who is responsible for disposal
- A radiator valve allowance (for example "up to four valves included; further valves at £28 each") and a statement that converting to a sealed system may reveal existing weak joints
- System clean method and inhibitor, and the magnetic filter required for warranty
- Boiler Plus control specified
- Making good scope, and what is excluded (redecoration)
- Notification and Benchmark included; warranty registration done by the installer
- Payment terms and a programme of 2–3 working days with heating and hot water off during the work (see written quote template)
Frequently Asked Questions
Why is a conversion so much more than a combi swap?
A swap reuses the gas supply, flue position, pipework and controls; the engineer changes one appliance for another in a day. A conversion removes a cylinder and two tanks, re-plumbs the hot and cold throughout the house, usually upgrades the gas run, often moves the boiler and flue, converts the heating to a sealed system and cleans it, and adds Boiler Plus controls. That is two to three days of labour and £1,000–£2,000 of additional materials, which is why the honest range is £3,500–£6,500 against £2,200–£3,800 for a swap.
Can every house have a combi?
No. The limiting factors are the incoming main and the hot water demand. Below about 10–12 l/min dynamic flow, or where two showers are regularly used at once, a combi will disappoint and the right answer is a system boiler with an unvented cylinder, or a mains upgrade first. Survey before you sell.
Does the conversion need Building Regulations approval?
Yes, as any new boiler does. The Gas Safe registered installer notifies the installation through the Gas Safe Register's notification scheme as a competent person and the customer receives a Building Regulations Compliance Certificate; the installer does not need to involve the local authority directly. The Benchmark commissioning checklist should be completed and left in the boiler manual, and the warranty registered.
What happens to the old pipework in the loft?
The feed-and-expansion tank, cold water cistern, their overflows and the vent and feed pipes are redundant and should be removed, with any remaining pipe capped and the holes in the ceiling or roof made good. Leaving tanks in place "for the next owner" is poor practice; they collect debris and the overflow pipes are a route for cold air and vermin. Price the loft clearance explicitly.
Will the customer's taps and shower work on mains pressure?
Most modern taps are rated for mains pressure. Older gravity-rated mixer showers, some bath-shower mixers and any electric shower fed from the cold tank need checking and may need replacing. Where mains pressure is above about 3 bar, fit a pressure-reducing valve on the incoming main to protect the combi and reduce water hammer. Put the check and any replacements in the quote.
Regulations & Standards
Gas Safety (Installation and Use) Regulations 1998 — all gas work by Gas Safe registered engineers; appliance installation, flue and ventilation requirements
Building Regulations 2010, Approved Document L, Volume 1 (England) and the Domestic Building Services Compliance Guide — minimum boiler efficiency (ErP 92%), controls and the Boiler Plus requirements for combi installations in England
Building Regulations 2010, Approved Document J — combustion appliances and flue terminal positions
Building Regulations 2010, Approved Document G (G3) — not applicable to a combi (no stored hot water above 15 litres), but relevant if an unvented cylinder is the alternative recommended
Building Regulations 2010, Approved Document P — electrical work; a fused spur on an existing circuit is not notifiable
Water Supply (Water Fittings) Regulations 1999 — filling loop backflow protection, WRAS-approved fittings, pressure-reducing valves
BS 7593:2019 — preparation, commissioning and maintenance of domestic central heating systems: cleaning and inhibitor on conversion
BS EN 12828:2012+A1:2014 — design of water-based heating systems, including sealed system expansion
BS 6891:2015+A1:2019 — installation of low-pressure gas pipework in domestic premises (pipe sizing, testing and purging)
IGEM/UP/1B — tightness testing and purging of domestic natural gas installations
BS 5440-1 and BS 5440-2 — flues and ventilation for gas appliances up to 70 kW
Benchmark Commissioning Checklist (HHIC) — the industry commissioning record required by manufacturers' warranties
Gas Safe Register — Building Regulations notification — notification scheme and Building Regulations Compliance Certificates
GOV.UK — Approved Document L, Volume 1: Dwellings — boiler efficiency and controls requirements including Boiler Plus
GOV.UK — Approved Document J: Combustion appliances and fuel storage systems — flue terminal positions
Heating and Hotwater Industry Council (HHIC) — Benchmark — commissioning checklist and condensate guidance
HSE — Gas safety — statutory guidance on domestic gas work
WRAS — Water Regulations Approval Scheme — approved fittings and backflow protection on filling loops and PRVs
boiler installation pricing guide — like-for-like swap pricing and boiler supply costs
combi vs system vs regular boiler — choosing the right appliance before you quote
combi boiler flow rate explained — the flow-rate arithmetic that decides whether a combi will work
what size boiler do i need — sizing the combi for heating and hot water
gas pipe sizing — sizing the 22 mm gas supply
flue clearances and part j — flue terminal positions
repressurising a boiler filling loop guide — the sealed system the customer inherits
system cleansing inhibitors — cleaning and protecting the converted system
cylinder replacement pricing guide — the alternative when a combi is not the answer