Summary

The conventional-to-combi conversion is the most common upgrade sold to owners of 1960s to 1990s houses with a gravity hot water system, and it is routinely under-quoted by engineers who price it as a boiler swap with a cylinder removal bolted on. It is a different job. The boiler often moves (from the airing cupboard or kitchen to an external wall with a short flue route), the hot water distribution is reversed (combi outlet to taps instead of cylinder outlet), the cold water is re-plumbed to mains throughout, the old vent and feed pipes are removed, the loft is cleared of two tanks and their pipework, the gas run is usually too small for a 30 kW appliance, and the whole system is converted from an open-vented to a sealed arrangement that will reveal every weeping radiator valve the gravity system was tolerating.

Done well it is a two-and-a-half to three-day job for two people and a profitable one. Done as a one-day swap it becomes a week of callbacks: poor hot water flow because nobody measured the main, a kitchen tap that now screams because the mains pressure is 4 bar and nothing was done about it, a radiator that drips because the sealed system runs at 1.5 bar, and a customer who was promised "a combi for £2,500". This guide prices the conversion by its components, sets out the survey that decides whether to do it at all, and gives a worked example. For the boiler supply prices and like-for-like swap pricing see boiler installation pricing guide; for the system type decision see combi vs system vs regular boiler.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Component Scope Typical price (ex VAT, 2026)
Survey Flow and pressure test, gas pipe sizing, flue route, heat loss check £0–£90 (often credited against the job)
Combi boiler, 28–30 kW mid-range, supplied Boiler, standard flue, filling loop, clock £1,000–£1,600
Boiler Plus control Weather compensation sensor or smart thermostat £80–£250
Strip-out Cylinder, tanks, immersion, primaries, vent and feed, disposal £250–£450
Gas supply upgrade 22 mm from meter, 10–15 m, test and purge £300–£600
Hot and cold re-plumb Mains cold to all outlets, combi hot to taps, cap redundant runs £350–£800
Flue, condensate, PRV discharge Horizontal flue, 22 mm internal condensate, PRV to outside £150–£350
Sealed system conversion and leak check Radiator valve glands, joints, 2–4 valves replaced, expansion check £150–£350
System clean and protection Chemical cleanse or power flush, inhibitor, magnetic filter £300–£650
Electrical Fused spur, stat wiring, immersion circuit made safe £120–£250
Making good Boxing in, filling flue and pipe holes, floorboards, airing cupboard shelf £150–£400
Notification and handover Gas Safe notification, Benchmark, commissioning, customer demonstration £60–£120
Labour (engineer and mate, 2.5–3 days) £1,500–£2,200

Detailed Guidance

Step 1 — the survey that decides the job

A combi makes hot water from the incoming main, so the main decides whether the conversion is a good idea. Before pricing anything:

  1. Dynamic flow and pressure. At the kitchen cold tap, measure flow with a weir gauge with the bath cold tap also running, and pressure with a gauge on the outside tap under the same conditions. Record both. A 28–30 kW combi needs a dependable 12 l/min at 1 bar; a 35 kW needs 15 l/min; a 40 kW with two showers in use needs 18–20 l/min. A house on an old lead or 15 mm main delivering 8 l/min gets a poor combi whatever you fit, and the honest advice is a system boiler and an unvented cylinder, or a main replacement first (see lead pipe replacement pricing guide).
  2. Hot water demand. Count bathrooms and ask how they are used. Two showers running together is a 35–40 kW combi at best and realistically a cylinder. Set the expectation in writing: a combi serves one outlet at full flow.
  3. Gas supply. Trace the gas run from the meter and measure the pipe. Size it for the new appliance's maximum gas rate plus any other appliances, with a 1 mbar maximum drop. A 15 mm run of more than a few metres will not carry a 30 kW combi.
  4. Boiler position and flue. The ideal position is an external wall near the kitchen and bathroom, with a short horizontal flue meeting Approved Document J clearances and the manufacturer's distances from openings and boundaries, a condensate route to an internal waste, and a PRV discharge route to outside.
  5. Pipework condition. Look at the radiator valves, the pipework under floors and any microbore. A gravity system that has been topped up from the tank for 30 years may hold sludge and weeping joints that a sealed system at 1.5 bar will expose. Price a power flush and a valve allowance accordingly.
  6. Mains pressure. Above 3 bar static, specify a pressure-reducing valve.

The survey takes an hour and either confirms the conversion or saves the customer from a bad one. Charge for it or credit it; do not skip it.

Step 2 — strip-out

The removal list is longer than a swap: boiler, hot water cylinder (drain first; a 120-litre cylinder weighs 120 kg full), immersion heater and its circuit, cylinder thermostat, motorised valves and wiring centre if the new control scheme does not reuse them, feed-and-expansion tank, cold water storage cistern, their float valves, overflows and insulation, the open vent and cold feed pipes, and the gravity primaries if they are not reused as heating flow and return. The loft work alone is two hours for two people and a skip or a van run. Cap and label the redundant pipework rather than leaving it live and dead-legged, and photograph the loft before and after for the customer.

Step 3 — gas, flue and condensate

Run the new 22 mm gas supply, test the whole installation for tightness to IGEM/UP/1B and confirm the working pressure at the appliance under full load. Fit the boiler and flue to the manufacturer's instructions and Approved Document J, with a plume kit where the terminal would otherwise discharge towards a neighbour's window or across a boundary. Run the condensate internally where possible, in 22 mm with continuous fall to a waste, soil stack or condensate soakaway; an external run must be 32 mm, insulated and as short as possible. Run the PRV discharge to outside, visible and safe.

Step 4 — hot and cold re-plumb

In a gravity house the cold water storage cistern fed the hot water cylinder and usually the bathroom cold taps and WC; only the kitchen cold tap and perhaps an outside tap were on the main. After conversion everything is on the main. The cold supply to the bathroom and WC is connected to the mains distribution (often by reusing the tank-fed drop as a mains-fed pipe once its tank connection is cut and capped), and the combi's hot outlet is connected into the old hot distribution at the point where the cylinder outlet used to feed it. Check that no dead legs remain and that any old 22 mm gravity hot distribution does not leave the customer waiting for hot water at distant taps; a combi delivers hot water at mains flow, and a 22 mm run to a basin takes a long time to purge. Where taps and shower valves were low-pressure types (gravity-rated mixers, some older electric showers with a tank-fed supply), confirm they are rated for mains pressure or price replacements (see thermostatic vs manual mixer shower comparison).

Step 5 — sealed system, clean and controls

Convert the heating circuit to sealed: the combi carries the expansion vessel, pressure gauge, PRV and filling device. Check the expansion vessel size against the system volume (a large house with big radiators may need an additional vessel). Fill, pressurise to 1.0–1.5 bar and walk the house checking every valve gland and joint; a gravity system typically produces two to four weeping glands or compression nuts at this point, which is why a valve allowance belongs in the quote. Carry out the clean and flush to BS 7593:2019, dose with inhibitor, fit the magnetic filter on the return, and commission to the Benchmark checklist including gas rate, combustion analysis, flow and return temperatures, and DHW flow and temperature (see system cleansing inhibitors and central heating commissioning).

Boiler Plus in England requires a time and temperature control plus one of weather compensation, load compensation, a smart thermostat with automation and optimisation, or flue gas heat recovery; the weather compensation sensor supplied by most manufacturers is the cheapest route and the one that most improves efficiency (see weather compensation controls).

Step 6 — electrical and making good

The boiler needs a fused spur; the immersion heater circuit is removed back to the consumer unit or made safe and labelled; the room thermostat is wired or paired. None of this is normally notifiable under Approved Document P because no new circuit is created, but a Minor Works Certificate for the fused spur is good practice. Making good includes filling the old flue hole, boxing in or clipping the new pipework, replacing floorboards, and often fitting a shelf in the airing cupboard where the cylinder stood, which is the detail customers remember.

Worked example: three-bed semi, boiler moved from airing cupboard to kitchen external wall

Item Price
30 kW combi, mid-range brand, horizontal flue kit, filling loop £1,350
Weather compensation sensor (Boiler Plus) £110
Strip-out: cylinder, two tanks, immersion, vent/feed, disposal £350
22 mm gas supply from meter, 12 m, tightness test £450
Hot and cold re-plumb, cap redundant runs, PRV on incoming main £620
Condensate to kitchen waste, PRV discharge to outside £120
Sealed system conversion, three radiator valves replaced £220
Power flush, inhibitor, magnetic filter £520
Fused spur, immersion circuit made safe, stat wiring, MWC £180
Making good: flue hole, boxing, floorboards, airing cupboard shelf £280
Gas Safe notification, Benchmark, commissioning, handover £90
Labour: engineer 3 days, mate 2.5 days £1,850
Total £6,140

Materials at trade come to roughly £2,600, labour £1,850, and the balance is overhead and margin at about 25%, which is appropriate for a job with this many interfaces. Quoting it at £3,800 "because that's what combis cost" means working the third day for free and absorbing every weeping valve.

What to write into the quote

Frequently Asked Questions

Why is a conversion so much more than a combi swap?

A swap reuses the gas supply, flue position, pipework and controls; the engineer changes one appliance for another in a day. A conversion removes a cylinder and two tanks, re-plumbs the hot and cold throughout the house, usually upgrades the gas run, often moves the boiler and flue, converts the heating to a sealed system and cleans it, and adds Boiler Plus controls. That is two to three days of labour and £1,000–£2,000 of additional materials, which is why the honest range is £3,500–£6,500 against £2,200–£3,800 for a swap.

Can every house have a combi?

No. The limiting factors are the incoming main and the hot water demand. Below about 10–12 l/min dynamic flow, or where two showers are regularly used at once, a combi will disappoint and the right answer is a system boiler with an unvented cylinder, or a mains upgrade first. Survey before you sell.

Does the conversion need Building Regulations approval?

Yes, as any new boiler does. The Gas Safe registered installer notifies the installation through the Gas Safe Register's notification scheme as a competent person and the customer receives a Building Regulations Compliance Certificate; the installer does not need to involve the local authority directly. The Benchmark commissioning checklist should be completed and left in the boiler manual, and the warranty registered.

What happens to the old pipework in the loft?

The feed-and-expansion tank, cold water cistern, their overflows and the vent and feed pipes are redundant and should be removed, with any remaining pipe capped and the holes in the ceiling or roof made good. Leaving tanks in place "for the next owner" is poor practice; they collect debris and the overflow pipes are a route for cold air and vermin. Price the loft clearance explicitly.

Will the customer's taps and shower work on mains pressure?

Most modern taps are rated for mains pressure. Older gravity-rated mixer showers, some bath-shower mixers and any electric shower fed from the cold tank need checking and may need replacing. Where mains pressure is above about 3 bar, fit a pressure-reducing valve on the incoming main to protect the combi and reduce water hammer. Put the check and any replacements in the quote.

Regulations & Standards