Summary
Builders, kitchen fitters and loft converters live downstream of architects. The customer's "we've got drawings" means the design fee has already been spent, the planning application is in, and the tradesperson is now pricing against someone else's specification. Knowing what the architect was paid, for which stages, and what that fee did and did not include tells you how complete the information really is. A customer who paid £1,800 for "planning drawings" has a set of 1:100 elevations and no structural detail, no construction drawings, no specification and no Building Regulations package. Pricing that job as if it were fully designed is how a £75,000 extension becomes a £95,000 argument.
There is also a direct commercial angle. Tradespeople increasingly offer design-and-build: they sub-contract an architect or technologist, mark the fee up and present one price. To do that profitably you need to know the market rate for each stage, when a technologist is enough, when the job genuinely needs a registered architect (planning appeals, listed buildings, complex sites, party wall and rights-of-light disputes), and what the structural engineer, party wall surveyor and building control fees will add on top. This guide separates the stages, gives the fee bands for each, and explains the contractual terms (RIBA Domestic Professional Services Contract, stage payments, "additional services") that catch customers out.
Finally, the fee shapes the build sequence. Full-service appointments include contract administration under RIBA Stage 5, where the architect values the works, certifies stage payments and can instruct variations. Planning-only appointments leave the builder dealing directly with building control and the customer. Which one applies changes who you are answerable to on site and how you get paid.
Key Facts
- Protected title — "Architect" may only be used by someone on the ARB register (Architects Act 1997, s.20). Misuse is a criminal offence with a fine up to level 4 on the standard scale. "Architectural designer", "architectural technologist" and "architectural consultant" are not protected.
- RIBA chartered status — RIBA membership is voluntary and additional to ARB registration. A "Chartered Practice" has signed up to RIBA standards and must carry professional indemnity insurance.
- Chartered Architectural Technologists (MCIAT) — regulated by CIAT, carry PII, and routinely produce planning and Building Regulations drawings for domestic work at 60–80% of architect fees.
- RIBA Plan of Work 2020 — eight stages, 0 (Strategic Definition) to 7 (Use). Domestic fee quotes are usually broken into Stages 0–2 (feasibility and concept), 3 (planning), 4 (technical design and Building Regulations), 5 (construction) and 6 (handover).
- Percentage fees — 8–15% of construction cost for a full service on domestic extensions and refurbishments; 5–8% on new-build houses and larger budgets; 15–20% on very small, detail-heavy jobs such as listed building repairs.
- Typical split of a full-service percentage fee — Stages 0–2 around 15–20%, Stage 3 around 15–20%, Stage 4 around 30–35%, Stages 5–6 around 30%.
- Hourly rates (2024 market) — Part 1 assistant £35–£55; Part 2 assistant £55–£90; registered architect £90–£150; associate or director £150–£250+. London adds 20–40%.
- Planning-drawing lump sums — single-storey rear extension £1,500–£3,500; two-storey side or rear extension £2,500–£5,000; loft conversion with dormer £1,500–£3,000; new-build house £6,000–£15,000+.
- Building Regulations package (Stage 4) — typically 1.5–2.5 times the planning fee because it includes construction details, specification, schedules and co-ordination with the structural engineer.
- Measured survey — usually an extra: £400–£900 for a terraced house, £800–£1,800 for a detached, more for topographical surveys.
- Structural engineer — separate appointment, £500–£1,500 for a domestic extension's calculations and drawings; see structural engineer pricing guide.
- Planning application fee (England) — householder application around £258 (index-linked annually; check the Planning Portal); full application for a new dwelling around £578 per dwelling.
- Building control fees — local authority or registered building control approver, typically £500–£1,200 for a single-storey extension; see building control.
- Party wall surveyor — £700–£1,500 per surveyor where notices are disputed; see party wall agreement pricing guide.
- Professional indemnity insurance — ARB requires registered architects to hold adequate PII; RIBA Chartered Practices minimum £250,000 per claim, usually £1m–£2m in practice.
- Contract form — most domestic appointments use the RIBA Domestic Professional Services Contract (DPSC) 2020. Read the "Services" schedule: anything not listed is an "additional service" at hourly rates.
- VAT — architects' fees carry 20% VAT regardless of the build's VAT status (a new-build house is zero-rated for construction but the design fee is not).
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Job | Construction cost | Planning drawings (Stage 3) | Building Regs package (Stage 4) | Full service (Stages 0–6) |
|---|---|---|---|---|
| Single-storey rear extension | £50,000–£90,000 | £1,500–£3,500 | £2,500–£5,500 | £6,000–£12,000 |
| Two-storey rear/side extension | £90,000–£160,000 | £2,500–£5,000 | £4,000–£8,000 | £10,000–£20,000 |
| Loft conversion with dormer | £45,000–£75,000 | £1,500–£3,000 | £2,500–£4,500 | £5,000–£9,000 |
| Whole-house refurbishment | £120,000–£250,000 | £3,000–£6,000 | £6,000–£12,000 | £14,000–£30,000 |
| Garage conversion | £15,000–£30,000 | £800–£1,800 | £1,200–£2,500 | £2,500–£5,000 |
| New-build detached house | £300,000–£600,000 | £6,000–£15,000 | £10,000–£25,000 | £25,000–£55,000 |
| Listed building alterations | Varies | £3,000–£8,000 (incl. heritage statement) | £5,000–£12,000 | 12–20% of cost |
Figures are 2024 regional England. London and the South East add 20–40%. Measured survey, structural engineer, planning and building control fees, party wall surveyors and CDM principal designer duties are usually extra.
Detailed Guidance
The three fee structures and when each is used
Percentage of construction cost is the traditional model and still common for full-service work. The architect quotes, say, 11% of the final construction cost. The advantage for the customer is that the fee tracks the scope; the disadvantage is that the architect is paid more when the build costs more, and the customer only learns the real fee when tenders come back. Watch for the definition of "construction cost": most contracts use the final account including variations but excluding VAT, fees and the customer's own purchases (kitchens, sanitaryware). A customer who assumes the fee is fixed at the feasibility estimate will be surprised when a £60,000 estimate becomes an £85,000 tender and the fee rises with it.
Fixed lump sum per stage is now the most common domestic structure. The architect prices each RIBA stage separately and the customer can stop after any stage. This is what a typical "£2,400 for planning drawings" quote is. The lump sum assumes a defined scope, usually one design option developed to planning and one round of revisions. Change the brief after planning and the Stage 4 fee is re-quoted.
Hourly or day rates are used for feasibility work, planning appeals, additional services, listed building consent negotiations and site visits beyond the agreed number. A full-service domestic appointment often has a fee cap for Stage 5 site attendance (for example "fortnightly site visits, 12 in total, additional visits at £140 per hour").
What each RIBA stage actually delivers
Tradespeople pricing from drawings need to know which stage the drawings represent.
| RIBA stage | What the customer receives | What is missing for a builder |
|---|---|---|
| 0–1 Strategic Definition / Preparation and Briefing | Feasibility sketches, site appraisal, budget range | Everything |
| 2 Concept Design | Plans, elevations and sections at 1:100; massing; initial planning strategy | Structure, services, materials, details |
| 3 Spatial Co-ordination (planning) | Planning drawings: existing and proposed plans, elevations, sections, site plan at 1:1250/1:500, design and access statement where needed | Construction details, specification, structural design, drainage design, U-values |
| 4 Technical Design (Building Regs and construction) | 1:50 construction plans, 1:20 and 1:5 details, written specification, door and window schedules, drainage layout, structural engineer's drawings co-ordinated, SAP/U-value calculations | Nothing essential; this is the set to price from |
| 5 Manufacturing and Construction | Contract administration, site inspections, valuations, instructions | n/a |
| 6 Handover | Snagging, final certificate, defects period administration | n/a |
The commercial trap is Stage 3. The customer has paid for "the drawings", planning permission is granted, and they ask three builders to quote. Each builder is guessing at foundation depth, steel sizes, insulation specification, roof build-up and drainage route. Quotes vary by 30% or more because each builder has priced a different building. Insist on a Stage 4 package, or price your own design development time and exclusions explicitly. See building control process for what building control will want to see.
Architect, technologist or architectural designer
The job dictates the professional, not the other way round.
- Registered architect: planning-sensitive sites (conservation areas, listed buildings, green belt, basements in London boroughs), appeals, anything where design quality is part of the planning argument, and full-service appointments where contract administration matters. ARB registration and PII give the customer recourse.
- Chartered Architectural Technologist (MCIAT): technically strong on Building Regulations and construction detailing, often better value for Stage 4 packages on conventional extensions and loft conversions. Many practices pair an architect for Stage 3 with a technologist for Stage 4.
- Architectural designer / plan drawer: unregulated. Fees of £600–£1,500 for planning drawings are common. Fine for a permitted-development rear extension on a plain suburban house; a false economy on anything contentious. Check they carry PII and ask who does the structural design.
For a tradesperson offering design-and-build, a technologist is usually the right sub-consultant for Stages 3–4 on ordinary domestic work; bring in an architect where planning risk is real.
What is usually excluded from a quoted fee
Read the services schedule. Common exclusions that become additional charges or separate appointments:
- Measured survey of the existing building (£400–£1,800)
- Topographical survey, drainage survey, tree survey, ecology survey
- Structural engineer (calculations and drawings)
- Planning application fee, pre-application advice fee (£100–£500 to the council), CIL liability forms
- Building control fees
- Party wall notices and surveyor fees
- SAP or SBEM energy calculations, air-tightness testing
- Principal Designer duties under the Construction (Design and Management) Regulations 2015 (now often charged separately since the Building Safety Act 2022 dutyholder regime in England)
- Planning appeals, re-submissions after refusal, discharge of conditions
- Interior design, kitchen design, landscape design
- More than the agreed number of design revisions or site visits
A customer's "the architect's fee was £9,000" may therefore represent £9,000 plus another £4,000–£7,000 of consultants and statutory fees they did not count.
How architects' fees affect the build contract and your cashflow
Under a full-service appointment, the architect administers a building contract, typically the JCT Minor Works or Home Owner contract, or the RIBA Domestic Building Contract. Practical consequences for the builder:
- Interim valuations are certified by the architect, usually monthly, with 5% retention and a 3–6 month defects period. Your cashflow follows their valuation dates.
- Variations must be instructed in writing by the architect. Verbal agreements with the customer on site are not variations under the contract.
- The architect inspects periodically, not continuously. "Architect inspected" does not transfer responsibility for workmanship.
- Where the appointment ends at Stage 4 (very common on domestic work to save fees), none of this applies. You contract directly with the customer and should use your own written contract; see written contracts tradespeople.
Pricing a design-and-build offer
Worked example for a single-storey rear extension with an £80,000 construction cost:
| Item | Cost to you | Markup | Price to customer |
|---|---|---|---|
| Measured survey (sub-consultant) | £550 | 15% | £633 |
| Stage 3 planning drawings (technologist) | £1,900 | 15% | £2,185 |
| Planning application fee | £258 | 0% (disbursement) | £258 |
| Stage 4 Building Regs package | £3,200 | 15% | £3,680 |
| Structural engineer | £850 | 15% | £978 |
| Building control (approver) | £780 | 0% (disbursement) | £780 |
| Your co-ordination time (12 hours at £45) | £540 | 25% | £675 |
| Design package total | £8,078 | £9,189 |
Present the statutory fees as disbursements at cost; mark up the professional work and your time. The customer sees one number, you control the information you build from, and the technologist's drawings are co-ordinated with how you actually build rather than how a stranger assumed you would.
Frequently Asked Questions
Can I call myself an architect if I design extensions?
No. The title "architect" is reserved by the Architects Act 1997 for people on the ARB register, which requires a recognised Part 1, Part 2 and Part 3 qualification route or an ARB prescribed equivalent. You may describe yourself as offering "architectural design services", "architectural drawings" or "design and build". ARB actively pursues misuse, and insurers may refuse a claim where the title was used fraudulently.
Does a customer need an architect for a small extension?
Not legally. Planning and Building Regulations applications can be submitted by anyone, including the homeowner or the builder. For a permitted-development single-storey extension on a plain site, a technologist or competent plan drawer plus a structural engineer is normal. A registered architect earns their fee where planning risk, design complexity or heritage constraints exist, or where the customer wants contract administration.
Why do architects' quotes vary so much?
Scope and seniority. One quote covers Stage 3 only; another covers Stages 0–4 with a measured survey included; a third includes contract administration. One practice bills director time at £220 per hour; another uses a Part 2 assistant at £70. Ask every architect to break the quote down by RIBA stage and to list exclusions, then compare like with like.
Who is responsible if the drawings are wrong?
The architect or technologist owes a duty of reasonable skill and care and carries PII for exactly this. However, the builder is still responsible for building in accordance with the Building Regulations and for raising obvious errors. If a drawing shows a 150 mm steel over a 5 m opening and you build it, you share the liability. Query it in writing before you build it.
Should the builder be involved before Stage 4?
Ideally yes. Early contractor involvement at Stage 2–3 catches buildability and cost problems before they are drawn into the planning submission. Many architects resist it because it compromises competitive tendering; many customers are happy to appoint a preferred builder early in exchange for a transparent cost plan. A fixed-fee pre-construction agreement for your input (£400–£900) is a reasonable way to charge for that time.
Regulations & Standards
Architects Act 1997 — establishes the Architects Registration Board and protects the title "architect" (sections 20–21).
ARB Architects Code: Standards of Professional Conduct and Practice — requires registered architects to agree terms in writing, hold adequate PII and manage conflicts of interest.
RIBA Plan of Work 2020 — the eight-stage framework that structures most UK design appointments and fee proposals.
RIBA Domestic Professional Services Contract 2020 — the standard appointment contract between a homeowner and an architect.
Construction (Design and Management) Regulations 2015 — Principal Designer duties on projects with more than one contractor; domestic client duties pass to the contractor or designer by default.
Building Safety Act 2022 and the Building Regulations etc. (Amendment) (England) Regulations 2023 — dutyholder and competence regime in England, including Principal Designer and Principal Contractor duties under the Building Regulations from 1 October 2023.
Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012 (as amended) — planning application fees.
Building Regulations 2010 — Approved Documents A to S; the Stage 4 package must demonstrate compliance.
Architects Registration Board – Protection of title — who may use the title "architect"
RIBA Plan of Work 2020 — stage definitions and outputs
RIBA – Working with an architect for your home — fee structures and appointment guidance
Chartered Institute of Architectural Technologists — the technologist profession and MCIAT register
Planning Portal – Fee calculator and planning fees — current application fees
HSE – CDM 2015 domestic clients — how designer and contractor duties apply on domestic projects
structural engineer pricing guide — the engineer's fee that always sits alongside the architect's
party wall agreement pricing guide — surveyor fees the architect's quote rarely includes
planning permission — what a Stage 3 submission has to contain
building control process — what the Stage 4 package must satisfy
building notice vs full plans application — choosing the building control route the drawings support
knock through load bearing wall removal guide — a typical job where drawings stop at planning and the structure is left to the builder