Summary
Carpentry covers more ground than almost any other trade — a first-fix chippy cutting a roof on a new-build site, a second-fix joiner hanging twelve doors in a refurb, a kitchen fitter and a bespoke furniture maker are all "carpenters" to a customer — and the pricing structure has to follow the work. A site carpenter working for a builder is on a day rate because the builder controls the programme; a second-fix carpenter in a homeowner's house is quoting fixed prices because the customer wants a number; a joiner making alcove units is pricing by the piece because the time is mostly in the workshop. The day rate is the common foundation under all three, which is why it has to be right.
Carpenters tend to under-price for two reasons. The first is the employed comparison: the Construction Industry Joint Council (CIJC) rates for a skilled operative produce an hourly figure in the high teens, and customers who have seen "carpenter salary £33,000" are looking at that with the employer's costs stripped out. The second is tools. A carpenter's kit — track saw, mitre saw, first-fix nailer, second-fix nailer, router, planer, drills, a bench — runs to £5,000–£10,000 and depreciates fast, and a day rate that ignores it is a day rate that is slowly selling the tools to the customer. This guide builds the day rate from real 2026 costs, gives the regional figures, shows how to turn the rate into per-door, per-metre and per-item prices for second-fix work, and explains how to price day work for builders without being paid like an employee.
For the method across all trades see pricing labour; for converting day and hourly rates see day rate to hourly rate calculator; for the CIS deductions that apply on site work see cis tax explained.
Key Facts
- Day rate, 2026 — £200–£300 regionally; £250–£350 South East; £300–£420 London. Top of range for site-leading carpenters, kitchen fitters with a reputation and bespoke joiners
- Hourly equivalent — £30–£60, derived from the day rate ÷ 6.5–7 billable hours
- Door hanging, second fix — £60–£110 per internal door labour including hinges, latch and handle fitting; £80–£140 for fire doors with intumescent strips and closers; see internal door fitting pricing guide
- Skirting and architrave — £6–£12 per linear metre fitted for skirting; £40–£80 per door set for architrave; see skirting board fitting pricing guide
- Stud wall — £30–£55 per m² labour for a timber stud partition boarded one side; see stud wall installation pricing guide
- Loft boarding — £20–£35 per m² labour on raised loft-leg system; see loft boarding pricing guide
- Decking — £40–£80 per m² labour on a simple ground-level deck; see decking installation pricing guide
- Kitchen fitting — £800–£2,000 labour for a standard 8–12 unit kitchen, 3–5 days; see full kitchen fit pricing guide
- Floor joists — £40–£70 per m² labour to replace; see floor joist replacement pricing guide
- Site day rate for builders — £180–£260 regionally per carpenter, more with own tools, van and a labourer; paid on CIS with 20% deducted at source if registered
- Minimum charge — £150–£200 for a half-day; a single door hung on its own is a half-day, not £70
- Billable days per year — 200–215 after holidays, quoting, workshop time that is not recharged, sickness and weather on external work
- Tool cost — £5,000–£10,000 of power tools and a bench, replaced on a 3–5 year cycle: £1,500–£2,500 a year that must be in the rate
- Materials markup — 15–25% on timber, sheet material, ironmongery and fixings; timber bought in bulk and used across jobs is charged per job at the going rate, not at what you paid six months ago
- Workshop time — bespoke joinery made off-site is priced per item from workshop hours at the same hourly rate plus a workshop overhead (rent, machinery, extraction, power) of £5–£15 an hour on top
- VAT — compulsory registration above £90,000 taxable turnover in a rolling 12 months; kitchen fitters and bespoke joiners who supply materials reach the threshold on modest labour income
- Insurance — public liability £1–£2 million, £500–£800 a year; tool insurance for the van kit is a separate policy and worth it; see tools insurance explained
- Consumer Rights Act 2015, s.51 — reasonable price where none agreed; written rate and scope protect both sides
- Work at Height Regulations 2005 — applies to roof carpentry, loft work and anything from a tower; the hire belongs on the quote
- Building Regulations Approved Document B — fire doors in flats, three-storey houses and loft conversions must be fitted to the door-set certification; fire door pricing carries the certification check
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Charge | Regional (outside London/SE) | South East | London | Notes |
|---|---|---|---|---|
| Day rate, domestic second fix | £200–£300 | £250–£350 | £300–£420 | 6.5–7 billable hours, own tools |
| Day rate, site first fix for a builder | £180–£260 | £220–£300 | £260–£350 | CIS, builder's programme |
| Day rate, carpenter + labourer gang | £320–£440 | £380–£500 | £440–£600 | Roofs, joists, large stud layouts |
| Hourly equivalent | £30–£45 | £38–£55 | £45–£60 | Small works only |
| Half-day minimum | £150–£200 | £180–£240 | £200–£280 | One door, one shelf |
| Hang internal door (customer-supplied, existing lining) | £60–£110 | £70–£130 | £90–£160 | Hinges, latch, handle; plus £20–£40 if lining needs packing |
| Fire door FD30 to certified lining | £80–£140 | £100–£170 | £130–£220 | Strips, closer, certified ironmongery |
| Skirting, per linear metre fitted | £6–£12 | £8–£14 | £10–£18 | MDF or softwood, scribed, excludes painting |
| Architrave, per door set | £40–£80 | £50–£90 | £60–£110 | Both sides |
| Stud wall, per m² boarded one side | £30–£55 | £35–£60 | £45–£70 | Excludes plastering |
| Loft boarding on loft legs, per m² | £20–£35 | £22–£40 | £28–£45 | Excludes legs/boards |
| Standard kitchen fit, 8–12 units, labour | £800–£2,000 | £1,000–£2,400 | £1,400–£3,000 | 3–5 days, plumber and electrician extra |
| Alcove unit, bespoke, each | £600–£1,500 | £800–£1,800 | £1,000–£2,500 | Workshop-made, fitted, unpainted |
Detailed Guidance
Building the day rate from your costs
Start from what the business has to recover. A sole-trader second-fix carpenter outside London:
| Item | Annual figure |
|---|---|
| Target income before tax | £38,000 |
| Van: finance or depreciation, insurance, tax, servicing, work fuel | £7,000 |
| Public liability and tool insurance | £900 |
| Tools: power tools, blades, nailer gas, bench, replacement cycle | £2,000 |
| Consumables not recharged: screws, glue, pins, sandpaper, pencils | £600 |
| Phone, accountant, software, card fees | £1,800 |
| Workwear, PPE, dust extraction filters | £400 |
| Advertising, website, directory listings | £900 |
| Pension contribution | £2,400 |
| Total to recover | £54,000 |
A carpenter working 46 weeks, averaging 4.5 billable days (quoting, materials runs, a day lost to a late delivery every fortnight) has about 207 billable days. £54,000 ÷ 207 = £261 a day to earn £38,000 before tax. At £200 a day the income before tax is about £25,000; at £300 it is about £46,000. If a chunk of the week is workshop time making things to fit later, that time is billable too — it is just invoiced as part of the item, not as a day on site.
Materials are not in the table. Timber, MDF, doors, ironmongery and fixings go on the quote at cost plus 15–25%. A carpenter who "throws in" the fixings and the odd length of CLS on a £230 day is giving away £20–£40 a day.
Turning the day rate into fixed prices
Domestic customers want a number for the job, and the fixed price is the day rate applied to a realistic output, plus a contingency for the things old houses do:
| Task | Realistic output per day | Day rate £261 ÷ output | Fixed price charged |
|---|---|---|---|
| Hang internal doors, existing linings | 4–6 doors | £45–£65 | £60–£110 each |
| Skirting, scribed and fixed | 25–40 lin m | £6.50–£10 | £6–£12 per m |
| Architrave, both sides | 5–7 door sets | £37–£52 | £40–£80 per set |
| Stud wall, CLS, boarded one side | 8–12 m² | £22–£33 | £30–£55 per m² |
| Loft boarding on legs | 10–15 m² | £17–£26 | £20–£35 per m² |
The fixed-price column sits above the simple division because a day hanging doors is never six doors in a row: the first lining is out of plumb, the third door is 10 mm wider than the opening, the customer wants the handles 50 mm higher than standard, and there is a drive to the merchant for the hinges the door came without. Output figures assume good conditions; fixed prices carry the bad ones. State the assumptions ("doors supplied to size; linings plumb and square; existing latch positions reused") so the extra is visible in advance.
Worked example — six internal doors, customer-supplied, existing linings, new hinges and latches, new lever handles supplied by the customer:
Labour: 6 doors × £85 = £510
Materials: 12 pairs hinges £36, 6 latches £30,
screws and packers £10 = £76 (+20% = £91)
Quote: £601 (approx 1.25–1.5 days)
Sold as a day rate that job is £261–£390; sold per door it is £601 and the customer has a price they understand. The difference is the half-day the sixth door takes when the lining needs packing, which the per-door price absorbs and the day rate turns into an argument.
Day work for builders
First-fix work for a builder — joists, studwork, roofs, floor decks, window and door frames — is almost always on a day rate, because the builder sets the programme and the materials are theirs. Price it as a labour-only day rate with these terms in writing:
- Rate per carpenter per day — £180–£260 regionally in 2026 for a competent first-fix carpenter with own hand and power tools; more if you bring a van and a labourer
- CIS status — the builder deducts 20% at source if you are registered, 30% if not; confirm your UTR and registration before the first payment; see cis subcontractor verification
- Hours — a day is 8 hours on site including breaks; overtime at 1.5× after that and on Saturdays, or not at all
- Wasted visits — half a day charged if the materials are not on site or the previous trade is not finished
- Payment terms — fortnightly or monthly on application; builders pay slower than homeowners, and the rate must carry 30 days of cash
- Who supplies what — fixings and consumables are usually the builder's on site work; be clear, because a carpenter buying his own nailer gas and screws at £15 a day on a £200 rate has quietly cut the rate by 7%
The site rate is lower than the domestic rate because there is no quoting, no small-job travel and no materials to chase, and the days are continuous. It is still higher than the CIJC employed rate because it carries the van, the tools, the insurance and the unpaid days.
Bespoke joinery and workshop time
Fitted furniture, alcove units, bespoke doors and staircases are priced per item, and the item price is workshop hours plus fitting hours at the same hourly rate, plus the workshop overhead, plus materials at a higher markup (25–35%, because sheet material offcuts and the waste from selecting timber are real costs). A pair of alcove units in 18 mm MR MDF, painted by the decorator:
Workshop: 14 hours × (£40 rate + £10 workshop overhead) = £700
Fitting: 6 hours × £40 = £240
Materials: MDF, back panels, hinges, shelf pins, edging = £260 (+30% = £338)
Quote: £1,278 for the pair
Keep workshop hours as billable in your own records; the common mistake is to count the fitting day as the only income and treat the two workshop days as free. See fitted furniture and alcove cupboard and shelving installation for the construction detail.
Regional, London and seasonal factors
The spread from the cheapest regions to London is 40–50%, driven by the same cost base against different demand and by London-specific costs: parking (£15–£40 a day, recharged as a disbursement), ULEZ on older vans, and slower travel that costs billable hours. External carpentry — decking, fencing, garden rooms, roofs — is weather-dependent, and a carpenter who relies on it needs internal second-fix work lined up for winter or a summer rate high enough to carry the lost days. Kitchen fitting is counter-seasonal, with a rush before Christmas, and a fitter who is booked three months ahead can and should charge at the top of the range.
Quoting, deposits and payment
Written quote for every domestic job listing the items, the quantities, what is supplied by whom, what preparation and making good is included, and the day rate for extras. Materials deposit of 30–50% on anything over £500 — a kitchen or a staircase is a large deposit because the materials are large. Invoice on completion with 7-day terms for homeowners; card payment on site where possible. The Consumer Contracts Regulations 2013 give a 14-day cancellation right on contracts agreed in the customer's home, and bespoke items made to the customer's specification are the one category where the cancellation right does not apply once work has started — say so in the quote, because it matters for a £1,200 alcove unit that has been cut before the customer changes their mind. See quotes vs estimates.
Frequently Asked Questions
What is a fair day rate for a carpenter in 2026?
£200–£300 a day outside London and the South East for a self-employed carpenter with their own tools and van, £300–£420 in London. Those figures produce a mid- to high-£30,000s income before tax on 200–215 billable days once the van, tools, insurance and pension are paid for. A site day rate for a builder is lower (£180–£260) because the work is continuous and there is no quoting or materials chasing.
Should I charge per door or per day for hanging doors?
Per door for domestic customers — £60–£110 each for an internal door on an existing lining, with the assumptions stated. It pays better than a day rate once the fourth door's lining turns out to be out of square, and the customer gets a price they can compare. Day rate only when a builder is supplying the doors, the linings and the programme.
How much should I add for materials?
15–25% on timber, sheet material, doors and ironmongery; 25–35% on bespoke joinery materials where waste and selection are significant. The markup covers the time spent ordering and collecting, the stock on the van, and the offcuts that never get used. Charge materials at the current merchant price, not at what the timber in your rack cost last spring.
Does CIS apply to me?
Only when you are paid by a contractor — a builder, developer or another tradesperson acting as the main contractor. Work direct for a homeowner is outside CIS. On contractor work, 20% is deducted from the labour element at source if you are registered, 30% if not, and reclaimed through your Self Assessment return; see cis tax explained.
When should I use an hourly rate?
Rarely. Small jobs that cannot be quoted — easing a sticking door, refixing a loose newel, a half-hour of investigation — are better handled with a half-day minimum charge than an hourly rate, because the travel and set-up for a 30-minute job are the same as for a 3-hour one. If you do quote hourly, pair it with a first-hour minimum of £80–£120.
Regulations & Standards
Consumer Rights Act 2015 (s.49–s.52) — reasonable care and skill; reasonable price where none agreed
Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 (SI 2013/3134) — 14-day cancellation right; exemption for goods made to the consumer's specification (reg 28)
Income Tax (Construction Industry Scheme) Regulations 2005 (SI 2005/2045) — deductions at source from labour payments by contractors
Value Added Tax Act 1994 — compulsory registration threshold £90,000 (from 1 April 2024)
Health and Safety at Work etc. Act 1974 — general duties for the self-employed
Work at Height Regulations 2005 (SI 2005/735) — roof carpentry, loft work, towers
Provision and Use of Work Equipment Regulations 1998 (SI 1998/2306) — guarding and safe use of saws and nailers
Control of Substances Hazardous to Health Regulations 2002 (SI 2002/2677) — wood dust (hardwood dust is a carcinogen; WEL 3 mg/m³ softwood, 3 mg/m³ hardwood, 8-hour TWA), extraction and FFP3 RPE
Building Regulations 2010, Approved Document B — fire door requirements in flats, loft conversions and three-storey houses
Building Regulations 2010, Approved Document K — stair pitch, rise, going and guarding for staircase work
BS 8212:1995 — code of practice for dry lining and partitioning using gypsum plasterboard (stud partitions)
BS EN 942:2007 — timber in joinery, general requirements
Construction Industry Joint Council Working Rule Agreement — employed site rates, for context only
Consumer Rights Act 2015, Part 1 Chapter 4 — services — reasonable price and reasonable care and skill
Consumer Contracts Regulations 2013, regulation 28 — exemptions from cancellation right — bespoke goods made to the consumer's specification
HMRC — Construction Industry Scheme (CIS) — who must register and deduction rates
HMRC — VAT registration thresholds — £90,000 compulsory threshold
HSE — Wood dust: controlling the risks — workplace exposure limits and extraction
HM Government — Approved Document B (fire safety) — fire door provisions
pricing labour — the cost-based pricing method and baseline day rates by trade
day rate to hourly rate calculator — converting between day rate, hourly rate and billable hours
internal door fitting pricing guide — per-door fixed pricing in detail
skirting board fitting pricing guide — per-metre skirting and architrave pricing
stud wall installation pricing guide — pricing stud partitions from the day rate
full kitchen fit pricing guide — pricing a kitchen installation
cis tax explained — CIS deductions on site work for builders
second fix carpentry — the second-fix sequence the fixed prices are built on
fitted furniture — bespoke joinery construction behind per-item pricing