Summary

Tiling is priced per square metre by almost everyone, and the per-metre figure is where tilers lose money. A customer compares £40/m² with £30/m² and takes the £30, not knowing that the £30 excludes the backer board, the tanking, the trims, the 40% cutting waste on a herringbone layout and the day spent levelling a floor that was never flat. The tiler who quoted £30 then either does all of that for nothing or has an argument on day two. The alternative is to build the price from the day rate, which carries the tiler's real costs, converted to a per-metre figure for each tile type and layout at the output that layout actually achieves, with the preparation as separate priced lines the customer can see.

Tiling output varies more than most trades. A competent tiler lays 10–15 m² of 300 × 600 mm porcelain on a flat floor in a day; the same tiler lays 4–6 m² of 50 mm mosaic or a herringbone with a 45° cut on every piece at the perimeter. A bathroom with a bath, a shower niche, a window reveal and a boxed soil pipe is three days of cutting for 20 m² that the per-metre price has to carry. This guide builds the day rate from 2026 costs, gives the regional figures, converts the rate to per-metre prices by tile type and layout at realistic outputs, prices the preparation and tanking separately, and shows a worked bathroom.

For the method across all trades see pricing labour; for converting day and hourly rates see day rate to hourly rate calculator; for the per-room detail see bathroom tiling pricing guide, wall tiling pricing guide and floor tiling pricing guide.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Charge Regional (outside London/SE) South East London Notes
Day rate, tiler, own tools £200–£300 £250–£350 £300–£420 6.5–7 billable hours
Hourly equivalent £30–£45 £38–£55 £45–£60 Small works only
Half-day minimum £150–£200 £180–£240 £200–£280 Splashbacks, repairs
Walls, standard tile, per m² labour £35–£55 £40–£60 £50–£75 200 × 250 to 300 × 600 mm
Floors, standard porcelain, per m² labour £40–£60 £45–£70 £55–£85 300 × 300 to 600 × 600 mm
Large-format, per m² labour £60–£90 £70–£100 £85–£120 Two tilers above 1200 × 600
Mosaic, per m² labour £60–£100 £70–£110 £85–£130
Herringbone / pattern uplift +30–50% +30–50% +30–50% On the straight-lay rate
Natural stone, per m² labour £60–£100 £70–£110 £85–£130 Plus sealing £8–£15/m²
Tile backer board, per m² supplied and fitted £15–£25 £18–£28 £22–£35 6 mm or 12 mm cement board
Self-levelling compound, per m² £10–£20 £12–£22 £15–£25 Plus primer
Tanking a shower enclosure (walls and tray upstand) £150–£300 £180–£340 £220–£400 Kit + labour
Remove old tiles, per m² £10–£20 £12–£22 £15–£25 Plus disposal; skim damage extra
Trims, per linear metre fitted £5–£15 £6–£16 £8–£18 Aluminium or PVC; brass/stainless more
Standard bathroom (20 m² walls, 5 m² floor), labour and prep, excluding tiles £1,400–£2,400 £1,700–£2,800 £2,100–£3,400 See worked example

Detailed Guidance

Building the day rate from your costs

A sole-trader tiler outside London:

Item Annual figure
Target income before tax £36,000
Van: finance or depreciation, insurance, tax, servicing, work fuel £6,500
Public liability insurance £600
Tools: wet cutter, bridge saw blades, levelling system clips, mixers, trowels, replacement £1,500
Consumables not recharged: blades, spacers, sponges, buckets, sealant guns £500
Phone, accountant, software, card fees £1,800
Workwear, PPE, FFP3 for silica dust when cutting porcelain £400
Advertising, website, directory listings £900
Pension contribution £2,400
Total to recover £50,600

A tiler working 46 weeks and losing a day a week to quoting, collecting materials and waiting on other trades has about 207 billable days. £50,600 ÷ 207 = £244 a day to earn £36,000 before tax. At £200 a day the income before tax is about £27,000; at £300 it is about £47,000.

Materials are not in the table. Adhesive (£12–£25 per 20 kg bag, 1 bag per 4–6 m² on walls, 1 per 3–4 m² on floors with a 10 mm trowel), grout, trims, backer board and tanking go on the quote at trade cost plus 15–25%. A tiler who "throws in" the adhesive on a £220 day is giving away £30–£60.

Converting the day rate into per-metre prices

The per-metre rate is the day rate divided by realistic output, plus the uplift for preparation, cutting and the grouting return:

Work Realistic output per day Day rate £244 ÷ output Charged
Walls, 300 × 600 porcelain, straight, few cuts 8–10 m² £24–£31 £35–£55/m²
Walls, same tile, bathroom with bath, niche, window 5–7 m² £35–£49 £45–£65/m²
Floors, 600 × 600 porcelain, flat substrate 10–15 m² £16–£24 £40–£60/m²
Floors, same tile, L-shaped kitchen, many cuts 7–10 m² £24–£35 £45–£70/m²
Large-format 1200 × 600 walls 5–7 m² £35–£49 £60–£90/m²
Mosaic sheets 3–5 m² £49–£81 £60–£100/m²
Herringbone 100 × 400 on a floor 5–7 m² £35–£49 £55–£85/m²

The charged figure is above the simple division because the output figures are for laying only. A day's tiling includes setting out, mixing, cutting at the perimeter (with a wet cutter outside, in the rain, with a mask), cleaning off, and a return visit to grout and seal. The per-metre price carries all of that; the day rate only carries the hours. Where a job is small enough that the per-metre total falls below the half-day minimum, charge the minimum.

Preparation is a separate line, always

The commonest tiling dispute is about what was included. Put the preparation on the quote as lines, with a price each, so the customer can see what they are paying for and what happens if they decline it:

A quote that lists "tiling, 25 m², £1,000" is an invitation to argue. One that lists the tiling, the board, the tanking, the trims and the removal separately is a contract.

Worked example: standard family bathroom

Bath with shower over, basin, WC, 300 × 600 mm porcelain walls to ceiling (20 m²), 600 × 600 mm porcelain floor (5 m²), one window reveal, one boxed soil pipe, tiles supplied by the customer:

Preparation
  Remove old tiles, 20 m² × £15                            =   £300
  Re-board damaged areas, 8 m² backer board × £20          =   £160
  Tank bath/shower area, walls and bath upstand            =   £220
  Floor: 6 mm backer board overlay, 5 m² × £20             =   £100
Tiling labour
  Walls, bathroom-grade complexity, 20 m² × £50            = £1,000
  Floor, 5 m² × £50                                        =   £250
  Trims, 12 lin m × £10                                    =   £120
  Silicone to all internal corners and bath line           =    £60
Materials (adhesive 7 bags, grout, primer, spacers,
  sealant, levelling clips) £240 + 20%                     =   £290
Disposal (old tiles, 2 bulk bags)                          =    £80
                                                            --------
Quote, excluding tiles                                       £2,580
Tiles: customer-supplied; wastage 12% advised on the order
Programme: 5 days (prep 1.5, walls 2, floor 0.5, grout/seal 1)

Five days at £244 is £1,220 of day rate; the quote returns £1,930 in labour and prep lines — the difference is the cutting, the window reveal, the boxing, the tanking and the return visit, all of which the per-metre and per-line prices carry and a bare day rate would not. See bathroom tiling pricing guide for the per-room variants.

When to use the day rate instead

Regional, London and seasonal factors

The spread from the cheapest regions to London is 40–50%, and London adds parking (£15–£40 a day as a disbursement), ULEZ on older vans and slow travel. Tiling is largely counter-seasonal to external trades — bathrooms get done in autumn and winter — and a tiler with a reputation is booked two to three months ahead, which justifies the top of the range. External tiling (porcelain paving, balconies) is a March-to-October trade with its own rules; see external tiling and outdoor porcelain paving tiles.

Quoting, deposits and payment

Written quote for every job with the tile type and size, the layout, the preparation lines, the trims, the wastage percentage, the programme and the day rate for extras. State that the customer-supplied tiles must be on site, checked for batch and calibre, before the start date. Materials deposit of 25–40% on anything over £800. Invoice on completion with 7-day terms; stage payments on anything over a week. The Consumer Contracts Regulations 2013 give a 14-day cancellation right on contracts agreed in the customer's home; see quotes vs estimates.

Frequently Asked Questions

What is a fair day rate for a tiler in 2026?

£200–£300 a day outside London and the South East for a self-employed tiler with their own tools, £300–£420 in London. Those figures give a mid-£30,000s income before tax on about 207 billable days once the van, tools, insurance and pension are paid for. A day rate for a builder or bathroom company is lower (£180–£260) because the materials, the programme and the substrate are theirs.

How much do tilers charge per square metre?

£35–£60/m² labour for standard wall tiles, £40–£70/m² for floors, £60–£120/m² for large-format, mosaic, stone and patterned layouts, outside London in 2026. Preparation — backer board, levelling, tanking, removing old tiles — is extra and should be priced as separate lines, because it varies more between jobs than the tiling does.

How many square metres can a tiler do in a day?

6–10 m² of standard wall tiles, 8–15 m² of standard floor tiles on a flat substrate, 5–8 m² of large-format and 3–6 m² of mosaic. A bathroom with a bath, a niche and a window reveal halves wall output. Anyone quoting 20 m² a day of bathroom walls is describing a straight run of blank wall, not a bathroom.

Should preparation be included in the per-metre price?

No. Put it on the quote as separate lines — backer board per m², tanking per enclosure, levelling per m², tile removal per m² — with a price each. It is what the customer is comparing when they compare quotes, and it is what BS 5385 requires for the tiling to last. A quote that hides it in the per-metre figure loses to the tiler who left it out, and then costs the customer twice when the tiles fail.

Do I need to charge VAT?

Only once taxable turnover passes £90,000 in a rolling 12 months. A tiler who supplies tiles as well as labour reaches that on quite modest labour income because the tiles pass through the turnover figure; a labour-only tiler rarely does. Watch the rolling total monthly; see vat registration for tradespeople.

Regulations & Standards