Summary
Timber is the material most customers picture when they say "cladding" — the warm, natural look that composite and fibre cement products are explicitly designed to imitate. It's also the material most likely to be mis-priced, because the boards themselves look like the main cost when in fact the ventilated cavity, membrane, batten sub-structure and fixing specification are what determine whether the job survives its first decade. Timber cladding fitted direct to a solid wall with no airspace behind it, or fixed with galvanised screws on cedar, looks identical to a correctly detailed job on the day it's finished and starts failing — cupping, staining, rot at the base — within two or three winters.
This guide sits alongside the general material comparison in external wall cladding pricing guide and provides the timber-specific deep dive: profile types, species and treatment class selection, the fixing regime that prevents staining and corrosion, weathering behaviour (the number one source of "is this a fault?" callbacks), and a worked pricing example. For composite and brick-slip alternatives to timber, see composite cladding installation pricing guide and brick slip cladding pricing guide; for the render finish alternative, see external render pricing guide.
Timber cladding also carries a fire-safety dimension that isn't relevant to render: it's a combustible material, generally acceptable and widely used on ordinary houses under Building Regulations Part B, but the permitted proportion reduces the closer the wall sits to a relevant boundary, and the rules change entirely on taller or multi-occupancy buildings — covered in the fire section below and in more depth at cladding fire safety.
Key Facts
- Treated softwood cladding (featheredge, shiplap, tongue-and-groove) — £70–£120/m² installed; the most common domestic spec
- Naturally durable species — cedar, larch (left to weather or oiled) — £100–£160/m² installed; higher material cost but no re-coating cycle if left unfinished
- Accoya (acetylated softwood, enhanced durability) — £130–£190/m² installed; 50-year above-ground durability claim from the manufacturer, premium price point
- Board profile options — featheredge (tapered, overlapping, most common), shiplap (interlocking rebate), tongue-and-groove (flush vertical or horizontal), board-on-board (rustic, gapped double layer)
- Board thickness (typical) — 16–22mm featheredge, 19–25mm shiplap/T&G, thicker for board-on-board
- Ventilated cavity — minimum 25mm behind the boards, required for the assembly to dry; open at the base with insect mesh, open at the top for airflow
- Breather membrane — fixed to the wall (or over insulation) before battening, to BS EN 13859-1, allows outward drying while shedding driving rain
- Battens and counter-battens — typically 25×38mm or 25×50mm treated softwood; counter-battens used where insulation sits behind the membrane
- Timber use class — cladding exposed to full weather but not in ground contact is commonly specified to Use Class 3 under BS 8417:2024; confirm the exact class against the species, treatment, and site exposure before ordering — under-specified timber fails early regardless of installation quality
- Fixings — stainless steel grade A2 minimum (A4 for coastal/high-exposure sites) ring-shank nails or screws; galvanised fixings corrode over time and cause black tannin-staining streaks, especially on cedar and oak
- Board fixing method — face-fixed (visible fixings, cheaper, standard on featheredge) or secret-fixed/concealed-clip (premium, cleaner finish, more labour, common on T&G and rainscreen-style boards)
- Gapping for movement — timber expands and contracts with moisture content; boards need a small fixed gap at ends and between courses, specified by the supplier for the species and profile
- Weathering — cedar/larch left untreated — silvers to a grey patina over 12–24 months; this is expected behaviour, not a defect, and should be flagged to the customer at quote stage to avoid a callback
- Maintenance cycle — treated softwood, finished — re-stain or re-oil every 3–5 years to hold colour; left unfinished it weathers grey like cedar but with a shorter service life
- Fire — Part B (domestic houses) — timber cladding is combustible and widely accepted on ordinary houses, but the permitted unprotected/combustible area reduces near a relevant boundary —
- Fire — tall/multi-occupancy buildings — Regulation 7(2) of the Building Regulations 2010 (as amended) bans combustible cladding materials on relevant buildings 18m and above (11m for certain residential buildings with balconies from December 2022); not generally relevant to a house, but must be checked on flats/HMOs
- Planning permission — timber cladding changes external appearance and is not automatically permitted development, particularly on a principal elevation, in a conservation area, or on a listed building
- VAT — 20% standard rate
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Species/Product | £/m² Installed | Finish Behaviour | Maintenance Cycle | Typical Lifespan |
|---|---|---|---|---|
| Treated softwood (painted/stained) | £70–£110 | Holds solid colour if maintained | Re-coat every 3–5 years | 25–35 years (maintained) |
| Treated softwood (left to weather) | £70–£100 | Weathers grey, less even than cedar | None required | 20–30 years |
| Cedar (unfinished, silvers naturally) | £100–£150 | Silvers evenly to grey patina over 1–2 years | None required | 30–50+ years |
| Cedar (oiled, retains tone) | £110–£160 | Retains warm tone if maintained | Re-oil every 1–3 years | 30–50+ years |
| Larch (unfinished) | £100–£150 | Similar weathering to cedar, slightly harder wearing | None required | 30–45 years |
| Accoya | £130–£190 | Can be left unfinished or coated; very stable | Minimal | 40–50+ years (manufacturer claim) |
| Elevation Size | Treated Softwood | Cedar/Larch | Accoya |
|---|---|---|---|
| Small (20m²) | £1,400–£2,400 | £2,000–£3,200 | £2,600–£3,800 |
| Medium (40m²) | £2,800–£4,800 | £4,000–£6,400 | £5,200–£7,600 |
| Large elevation/full house (100m²) | £7,000–£12,000 | £10,000–£16,000 | £13,000–£19,000 |
Detailed Guidance
The substructure, not the boards, is what you're pricing
Timber cladding is a layered build-up and the boards are the last and cheapest-per-hour part of the job:
- Substrate check and prep — wall inspected for defects, loose render removed, surface stabilised. On a new-build timber-frame wall this is minimal; on an existing solid wall being re-clad it can be a significant prep phase.
- Insulation (optional) — if the job is combined with a thermal upgrade, insulation boards go on first, similar to the render insulation systems build-up.
- Breather membrane — fixed over the wall or insulation, laps taped, to BS EN 13859-1.
- Battens and counter-battens — vertical battens for horizontal boards (or vice versa), forming the ventilated cavity; counter-battens where insulation sits behind. This layer is where most of the setting-out precision lives — battens must be plumb, level and correctly spaced for the board profile's fixing centres.
- Cladding boards — fixed with the correct stainless fixings, gapped for movement, starting from a level, plumb setting-out line (usually a level datum line struck around the whole elevation before the first board goes up).
- Trims and detailing — corner trims (external corner boards or metal trim), cill/head details at openings, base ventilation strip with insect mesh, top ventilation at the eaves.
A quote that prices "boards + labour" without itemising battens, membrane, fixings and trims separately will under-price the job by a wide margin — the invisible layers commonly account for 35–45% of total material cost on a timber cladding job.
Profile selection and how it changes labour time
- Featheredge — tapered board, each course overlaps the one below by roughly a third. Fast to fit, forgiving of minor substrate irregularity, cheapest labour per m². The standard domestic choice.
- Shiplap — rebated interlocking profile, flatter finished face than featheredge. Slightly slower to fit due to the interlock needing to seat correctly each course.
- Tongue-and-groove — can run vertical or horizontal, flush finish. Requires more accurate setting-out and is less forgiving of substrate movement; commonly secret-fixed for a premium finish, which adds labour time per board.
- Board-on-board — two layers of boards with a gap between the lower layer, covered by the upper layer. Rustic look, uses roughly 1.4–1.6x the timber of a single-layer profile, more fixing points, higher labour and material cost.
Species selection — matching durability to budget and expectation
Treated softwood (tanalised/pressure-treated pine or spruce, featheredge or shiplap) is the affordable, most-requested option. It needs a maintenance cycle if painted or stained to hold colour — re-coat every 3–5 years — or can be left to weather to a grey tone, which is cheaper long-term but less even and predictable than cedar's weathering.
Cedar and larch cost more upfront but many customers specifically want the look of cedar silvering naturally, which needs no maintenance at all if left unfinished — this is a genuine selling point, not a compromise. Oiling periodically (every 1–3 years) retains the warm original tone instead, which is a maintenance commitment the customer needs to understand at quote stage.
Accoya (acetylated softwood) is a premium, dimensionally enhanced product with a manufacturer-claimed 50-year above-ground durability. It costs the most but requires the least ongoing intervention and holds its shape better than untreated softwood, reducing gapping and cupping issues over the cladding's life.
Whichever species is specified, confirm the timber's use class against BS 8417:2024 (preservation of wood, code of practice) for the specific exposure — full weather exposure but not ground contact is commonly Use Class 3, but the exact class depends on the species' natural durability rating and any preservative treatment applied. Under-specified timber (e.g. an interior-grade treatment on an exposed elevation) fails early no matter how well it's fitted.
Fixings — the detail customers never ask about but always complain about
Fixing spec is the single most common source of post-completion callbacks on timber cladding, and it's cheap to get right at quote stage:
- Stainless steel A2 as an absolute minimum, A4 for coastal or high-exposure sites
- Galvanised fixings will corrode over time and streak the board with black tannin staining running down from every fixing point — worst on cedar and oak, which have naturally high tannin content
- Ring-shank nails or screws (not smooth shank) for pull-out resistance, particularly on featheredge where the board is only fixed through its thin edge
- The fixing upgrade from galvanised to A2 stainless typically adds a small fraction to overall material cost — specify it as standard, not an optional upgrade, and don't let it get value-engineered out on a competitive quote
Weathering — set expectations before the first course goes up
If a customer chooses cedar or larch left unfinished, the boards will silver to a grey patina over roughly 12–24 months, and the weathering is rarely perfectly even — north-facing or sheltered elevations weather slower and patchier than south-facing or exposed ones. This is normal behaviour, not a fault, but it is the single most common cause of a post-completion complaint call if it hasn't been explained clearly at quote stage. Put it in writing: "unfinished [species] cladding will change colour and weather unevenly over 12-24 months; this is expected and not a defect."
Fire safety on domestic timber cladding
For an ordinary house, timber cladding is combustible but widely used and generally acceptable under Building Regulations Part B — the constraint is the permitted proportion of combustible, unprotected external wall area relative to distance from a relevant boundary, not a blanket ban.
The picture is entirely different for taller and multi-occupancy buildings. Since Grenfell, Regulation 7(2) of the Building Regulations 2010 (introduced via the 2018 Approved Document B amendment, extended in December 2022 to certain residential buildings with balconies from 11m) bans combustible cladding materials — including timber — on relevant buildings 18m and above, sitting alongside the Building Safety Act 2022's higher-risk building regime. This isn't relevant to a standard house but must be flagged immediately on a converted block of flats, an HMO, or anything approaching the height thresholds. See cladding fire safety for the full A1/A2 classification detail.
Planning permission
Timber cladding changes the external appearance of the building, so it is not automatically permitted development — the same principle applies as for EWI (see external wall insulation pricing guide) and general cladding (see external wall cladding pricing guide). The principal (street-facing) elevation, conservation areas, and listed buildings are the most likely to require planning permission, and in a conservation area the choice of cladding may itself be restricted. Always check with the Local Planning Authority before quoting a visible material change. See permitted development householder and conservation areas.
Pricing example (35m² single-storey extension gable, cedar shiplap, unfinished, regional)
| Item | Cost |
|---|---|
| Breather membrane (35m²) | £110 |
| Treated battens + counter-battens | £250 |
| Stainless steel (A2) fixings | £180 |
| Cedar shiplap cladding, 22mm (35m²) | £4,025 |
| Corner trims, cill details, insect mesh, base ventilation strip | £260 |
| Labour (2-person crew, 3.5 days) | £1,750 |
| Waste disposal | £110 |
| Margin 20% | £1,337 |
| Total | £8,022 |
Frequently Asked Questions
How much does timber cladding cost per m² fitted?
Treated softwood runs £70–£120/m² installed; naturally durable species like cedar and larch run £100–£160/m²; premium Accoya runs £130–£190/m². These figures include the ventilated cavity build-up (membrane, battens, fixings) and detailing, not just the boards — the boards themselves are typically only 40–55% of the total material cost.
Do I need to finish (paint, stain or oil) timber cladding, or can I leave it bare?
Cedar and larch can be left completely unfinished and will silver naturally to a grey patina over 12–24 months — a legitimate and increasingly popular choice that requires no maintenance. Treated softwood can also be left unfinished but weathers less predictably and has a shorter unmaintained lifespan; most customers choose to stain or paint softwood to hold a solid colour, which then requires re-coating every 3–5 years. Explain both options and the maintenance implication at quote stage.
Why do galvanised fixings cause black streaks on cedar cladding?
Cedar (and oak) contain naturally high tannin levels, which react with the zinc coating on galvanised fixings and cause corrosion and black staining that streaks down the board from every fixing point. Stainless steel (A2 minimum) doesn't react the same way and should be specified as standard on any naturally durable species, not offered as a chargeable upgrade.
Why does timber cladding need a ventilated cavity behind it if the boards are treated?
Treatment protects the timber from decay but doesn't stop moisture getting behind the boards through joints, end grain or driving rain. A minimum 25mm ventilated cavity, open at the base and top with insect mesh, lets any moisture that does get through dry out rather than sit trapped against the wall or the back of the boards. Fixing boards direct to a solid wall with no airspace is the single most common cause of premature timber cladding failure — cupping, staining and rot from the back, invisible until the damage is advanced.
Is timber cladding a fire risk on a normal house?
For an ordinary domestic house, no more than any other combustible material used sensibly — timber cladding is widely used and generally acceptable under Building Regulations Part B, though the permitted amount of combustible material reduces the closer the wall is to a relevant boundary. The rules change sharply for taller or multi-occupancy buildings, where Regulation 7(2) of the Building Regulations 2010 bans combustible cladding materials on buildings 18m and above (11m in some cases for residential buildings with balconies). Always confirm the building's height and occupancy classification before assuming standard domestic rules apply.
Regulations & Standards
Building Regulations Part B — fire safety, external fire spread and unprotected area calculations relative to boundary distance
Building Regulations Part C — resistance to moisture (ventilated cavity, breather membrane, detailing)
Building Regulations Part L — conservation of fuel and power, where cladding is combined with an insulation upgrade
Regulation 7(2) of the Building Regulations 2010 (as amended) — bans combustible materials in external walls of relevant buildings 18m and above (11m for certain residential buildings with balconies from December 2022)
Building Safety Act 2022 — higher-risk building regulatory regime for buildings meeting the HRB threshold
BS EN 13859-1 — breather membranes, flexible sheets for waterproofing
BS EN 14915:2013 — solid wood panelling and cladding, characteristics and requirements
BS 8417:2024 — preservation of wood, code of practice (timber use classes, treatment specification; supersedes BS 8417:2011+A1:2014, effective 15 August 2024)
Town and Country Planning (GPDO) 2015 — permitted development limits for external alterations
GOV.UK — Approved Document C (site preparation and resistance to moisture)
TRADA — Timber cladding guidance — species selection, treatment classes, fixing detail
BSI — BS 8417:2024 — preservation of wood code of practice
Planning Portal — External alterations — permitted development guidance
external wall cladding pricing guide — cross-material cladding comparison and pricing overview
composite cladding installation pricing guide — low-maintenance composite alternative
brick slip cladding pricing guide — masonry-effect cladding alternative
cladding fire safety — post-Grenfell fire regime for taller and multi-occupancy buildings
permitted development householder — planning permission detail for external alterations