Summary

Shower screen fitting looks like a simple like-for-like swap — take the old one out, put the new one in — but the pricing spread between the cheapest and most expensive version of "fit a shower screen" is enormous, and most of that spread is invisible until you're on site. A standard over-bath screen going onto sound, already-tanked tile is a half-day job with modest materials cost. A bespoke frameless panel that needs precise on-site measurement, a bracing bar, and possibly a look behind the tile to check what it's fixing into is a different job entirely, even though the customer's request ("I want a shower screen fitted") sounds identical.

This guide covers the commercial side of the job — what to charge, what drives the price up or down, and where quotes typically underprice the work. For the technical detail on how to actually set out, fix and seal each screen type correctly, see shower screen installation — that article covers glass standards, sealing technique and substrate requirements in full; this one focuses purely on pricing the job profitably.

The two biggest commercial risks on this job are underpricing bespoke/frameless work as if it were standard framed work, and failing to price in the callback risk from sealing work. A shower screen seal that fails within the first year is the single most common reason a bathroom fitter gets called back to a job they thought was finished — pricing in a realistic contingency, and being clear about what warranty (if any) covers a reseal, protects margin on every job of this type.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Job type Materials cost (supply) Labour Typical total price Notes
Over-bath screen (fixed panel, standard size) £60–£150 2–3 hrs £150–£280 Fastest, cheapest job type
Over-bath screen (bi-fold/hinged, standard size) £90–£200 2.5–3.5 hrs £200–£340 Slightly more complex hinge/seal detail
Framed pivot or hinged door enclosure £120–£300 3–4 hrs £280–£480 Includes wall channel fitting
Bi-fold door enclosure £150–£350 3.5–5 hrs £320–£550 More adjustment/alignment time
Quadrant / offset quadrant enclosure £150–£380 4–5 hrs £350–£600 Curved tray and glass must match radius
Sliding door enclosure £180–£400 4–5.5 hrs £380–£650 Rail alignment adds time
Frameless walk-in panel, standard size, no bracing bar £250–£500 3–4 hrs £450–£750 8mm glass typical
Frameless walk-in panel, bespoke size, with bracing bar £400–£900+ 5–7 hrs £750–£1,300+ Bespoke lead time; two-person heavy glass handling
Add: removal & disposal of existing enclosure £30–£90 1–2 hrs +£60–£150 Larger for heavy frameless panels; may need skip/tip run
Add: re-tanking/waterproofing required before fit Materials per waterproofing 0.5–1.5 days +£250–£600 Separate scope; screen job pauses until resolved

Detailed Guidance

Pricing by screen type — where the money actually goes

The base labour time for setting out and fixing a screen is fairly consistent across types (2–3 hours for the simplest, up to 5+ for a bespoke frameless panel), but the material cost swings hugely with glass thickness and hardware. A 4–6mm framed screen with a hinge kit is a low-cost, largely off-the-shelf product; an 8–10mm frameless panel is a heavier, more expensive piece of glass that needs careful transport, a two-person lift in most cases, and precision fixing because there's no frame to hide small setting-out errors.

Quote the screen type specifically, not a generic "shower screen fitting" rate. A customer asking for a quote "to fit a shower screen" without specifying type should be quoted a range with the final figure confirmed once the screen type and site survey are done — never commit to a single fixed price before confirming which of these categories the job actually falls into.

Materials cost breakdown

Item Typical cost Notes
Over-bath screen unit (4–6mm glass, standard) £50–£140 Wide range by finish (chrome vs brushed/black)
Framed enclosure door + side panel kit £100–£280 Depends on size and glass thickness
Frameless glass panel (8–10mm, standard size) £200–£450 Price rises sharply for non-standard sizes
Bracing/stabiliser bar (frameless, >1000mm) £40–£90 Often not included in the base panel price
Wall profile/channel kit £20–£60 Adjustable profiles cost more, absorb wall lean
Low-modulus neutral-cure silicone (sanitary grade) £8–£15 per tube Budget 2–3 tubes per job depending on run length
Fixing hardware (brackets, screws, wall plugs/resin anchor) £10–£30 Resin anchors for heavy panels cost more than standard plugs
Disposal (skip share/tip run for old enclosure) £20–£60 Larger for heavy frameless glass panels

Labour time and a worked day-rate example

A worked example for a mid-range job — replacing a tired framed pivot door enclosure with a new frameless walk-in panel, standard size, on a substrate that's already properly tanked and tiled:

Margin, contingency and the callback risk

Sealant failure is the leading cause of a callback on this job type, and it's almost always avoidable at quoting stage by pricing in enough time to do the seal properly — masking, a single clean bead, correct tooling, and genuinely leaving it uncured and unused for the full cure window. Rushing the sealing stage to hit a tighter labour estimate is the single most common way this job type erodes its own margin through repeat visits.

Build a specific contingency line for glass drilling risk where brackets need to go through existing tile — cracked tile during drilling is a realistic risk on old or poor-quality tile, and either an agreed contingency allowance or an explicit customer conversation about that risk before starting protects the quote from an unplanned tile-matching and replacement cost.

What quotes commonly miss

Frequently Asked Questions

How much does it cost to fit a shower screen in the UK?

For a standard, already-tanked bathroom, expect £150–£320 for a simple over-bath or framed screen, and £450–£1,100+ for a bespoke frameless walk-in panel. The single biggest driver of where in that range a specific job lands is the screen type and whether it's a stock size or a bespoke cut, not the fitting technique itself — see shower screen installation for the technical detail behind the labour time.

What's the real price difference between framed and frameless screens?

Framed and semi-framed screens are cheaper both in materials (thinner glass, less precision required because the frame conceals small tolerances) and in labour (less critical setting-out). Frameless panels use thicker, more expensive toughened glass, require millimetre-precision setting out because there's no frame to hide errors, often need a bracing bar over 1000mm, and are heavier to handle safely — typically a two-person job. Expect frameless to cost 1.5–3x a comparable framed enclosure.

Does removing an old screen add much to the price?

Yes, and it should be quoted as a distinct line rather than folded silently into the new-fit price. Breaking down a bonded or heavily sealed old enclosure, especially a heavy frameless panel, can take as long as fitting a simple new framed screen, and safe disposal of large glass panels needs planning (skip, tip run, or specialist glass disposal), not just a rubble bag.

Should the quote include a warranty on the sealant work?

It's good commercial practice to offer a defined warranty period (commonly 6–12 months) covering reseal callbacks for sealant failure, but this should be priced into the margin explicitly rather than treated as a free extra. A quote that's silent on warranty invites a dispute the first time a customer expects a free callback for a problem that's actually down to customer misuse (using the shower before the silicone has cured, for example) rather than workmanship.

Regulations & Standards