Summary

A ceiling replacement is the job the customer wants to be a skim and the plasterer knows is a strip-out. The call usually comes after a leak has brought part of a lath-and-plaster ceiling down, after a surveyor has reported a sagging ceiling, or because a customer has lived with cracks and bellies for years and is finally decorating. In each case the pricing question is the same: can the existing ceiling stay (overboard), or does it come down (strip, reboard, skim)? The answer is in the condition of the existing ceiling and the joists above it, and it is worth a survey visit, because the two jobs are £20–£40/m² apart and the customer will compare your figure with someone who quoted the cheaper one without looking.

A strip-out is dusty, heavy, slow, and full of things the quote has to carry: the skip, the asbestos sample, the noggins where board edges land between joists, the light fittings and downlighters, the coving, the loft insulation above a top-floor ceiling, and the day's cleaning. The boarding and skim at the end is the part the plasterer prices confidently; everything before it is where the margin goes. This guide gives the 2026 build-up for strip-and-reboard and for overboarding, the fire and Part L points that decide the board specification, the joist and services lines, a worked example, and a note on the heritage case where a lath-and-plaster ceiling should be repaired rather than replaced. For the technical method see plasterboard fixing and dot and dab, plasterboard types and taping and jointing techniques; for the repair alternative see lath and plaster repair pricing guide.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Job Regional (outside London/SE), per m² South East, per m² London, per m² 12 m² bedroom, regional 20 m² lounge, regional
Strip lath-and-plaster, reboard 12.5 mm, skim £50–£90 £58–£105 £70–£120 £600–£1,100 £1,000–£1,800
Strip old plasterboard, reboard, skim £40–£70 £46–£80 £55–£95 £500–£850 £800–£1,400
Overboard sound ceiling, skim £30–£50 £35–£58 £42–£70 £360–£600 £600–£1,000
Reboard with 15 mm Type F (fire) board, skim +£5–£10 +£6–£12 +£7–£14 +£60–£120 +£100–£200
Noggins, per m² of ceiling £3–£6 £3–£7 £4–£8 £36–£72 £60–£120
Skip, 6 yd (per 20 m² of lath and plaster) £250–£350 £280–£400 £320–£480 £250–£350 £250–£350
Asbestos sample (per sample) £30–£80 £35–£85 £40–£90 £30–£80 £30–£80
Light fitting re-hung, each £15–£30 £18–£35 £22–£42
Downlighter re-fitted with fire hood, each £15–£25 + hood £8–£15
Loft insulation top-up to 270 mm, per m² £8–£15 £9–£17 £11–£20 £96–£180 —
Coving replaced, per linear metre £8–£15 £10–£18 £12–£20 £110–£210 £150–£270
Decoration, per m² £8–£14 £10–£16 £12–£20 £96–£170 £160–£280
Patch repair (up to 1 m²), half-day minimum £150–£220 £170–£250 £200–£300

Detailed Guidance

Strip or overboard: the survey decision

Overboarding is the right job when the existing ceiling is firmly fixed, flat enough to board over (a belly of more than 10–15 mm over 2 m will show through), dry, and free of anything that will keep moving. It is the wrong job when the ceiling is lath and plaster with the keys broken (push up gently: it moves, or it crunches), when there has been a leak and the plaster is soft, when the laths are rotten or the joists need looking at, or when the customer wants the ceiling height kept and the cornice saved. The survey checks:

Write the decision down with the reason. "Strip and reboard: existing lath-and-plaster ceiling has failed keys over approximately 40% of the area and bellies of 25 mm; overboarding would not be sound" protects the quote against the cheaper one.

Labour and materials build-up: strip and reboard, 12 m² bedroom

Two operatives, lath and plaster, 1900s terrace, joists at 400 mm, no textured coating, one pendant, loft above with 100 mm of old insulation:

Step Time (two operatives) Materials
Seal the room, sheet the floor, isolate the lighting circuit, drop the pendant 1 hr Polythene, tape £10
Lift and bag the loft insulation above; strip plaster and laths with bars and shovels; bag and carry to skip 3–4 hr Rubble bags £15
Clean the joists of nails and plaster; check condition; fit noggins at board ends (3 rows × 3 m = 9 m) 1.5 hr 47 × 75 mm C16, 9 m, £25
Board: 5 × 2400 × 1200 × 12.5 mm, staggered, 38 mm screws at 230 mm 2 hr Board £60, screws £8
Re-lay and top up loft insulation to 270 mm (optional line, priced separately) 1 hr 170 mm top-up, 12 m² £90
Scrim the joints, bonding agent at the perimeter, two-coat skim 2.5 hr Scrim £5, multi-finish 1.5 bags £16
Re-hang pendant on a new ceiling rose; clean down; remove sheeting 1 hr Rose £5
Total 12–13 hours each, two days £140 + 20% = £168 (excl. insulation)

At £220–£300 a day each (see plasterer day rate guide), labour is £880–£1,200 for two days for two, which with materials, the skip (£300) and the asbestos sample (none here) gives a quote of £1,000–£1,400 at the regional band's top end for a bedroom with a loft above. A first-floor ceiling with a floor above (no insulation, no loft access) is quicker and sits at £700–£1,000. Those are the figures that reconcile with £50–£90/m².

The fire specification

The ceiling is the underside of a floor, and in Approved Document B the floor has a fire-resistance requirement that the ceiling lining helps meet:

See part b fire, building regs part b fire lining and compartmentation. The 15 mm Type F board is £5–£10/m² more than standard 12.5 mm; put it on the quote where it applies and say why.

Part L and the top-floor ceiling

A ceiling under a cold loft is the inside face of the roof thermal element. Approved Document L Volume 1 treats renovation of more than 50% of a thermal element as triggering the upgrade requirement — for a pitched roof with insulation at ceiling level, 0.16 W/m²K, which is about 270 mm of mineral wool. Where the existing insulation is 100 mm or less, the top-up is cheap while the insulation is already lifted (£8–£15/m²), and Building Control would expect it if the work is notified. Reboarding a single ceiling in a house is usually not notified, but a competent plasterer prices the top-up as an option and recommends it; see loft insulation and part l energy.

Overboarding build-up

Where the ceiling is sound: locate the joists (a stud finder, or probe with a bradawl along a line; mark both ends on the wall), remove the coving and drop the fittings, screw 12.5 mm board through the existing ceiling into the joists with screws long enough to get 25 mm into the timber (50–60 mm through lath and plaster), stagger the joints, scrim, skim. 20–30 m² a day for two including the skim. The price (£30–£50/m²) is lower because there is no strip, no skip and no dust, and it is the right job for a plasterboard ceiling with cracked joints or a lath-and-plaster ceiling that is flat and firm. Note the 12–15 mm height loss and that the ceiling rose, the smoke alarm and every downlighter need re-fitting.

Heritage ceilings: repair, do not replace

A lath-and-plaster ceiling with a run cornice, a ceiling rose or any decorative plasterwork, in a listed building or a conservation area, is a repair job: the keys are re-formed from above with a lime-based or resin-bonded repair, the plaster is consolidated, and the cornice is preserved. Stripping it in a listed building without consent is an offence under the Planning (Listed Buildings and Conservation Areas) Act 1990. Price it from lath and plaster repair pricing guide and bring in a conservation plasterer where the cornice matters.

What goes on the quote

Frequently Asked Questions

How much does it cost to replace a ceiling?

In 2026, £600–£1,100 for a 12 m² bedroom and £1,000–£1,800 for a 20 m² lounge outside London, to strip a lath-and-plaster ceiling, reboard with 12.5 mm plasterboard and skim, including the skip. Overboarding a sound ceiling without stripping it is roughly half that. Add coving, light fittings, loft insulation and decoration as separate items. London is 30–40% more.

Can I plasterboard over a lath-and-plaster ceiling?

Yes, if it is flat, firmly fixed and dry. The board is screwed through the old ceiling into the joists (which have to be found first) with 50–60 mm screws, and the old ceiling is sandwiched tight. It does not work on a ceiling that is sagging in bellies or where the laths are rotten, and it drops the ceiling by 12–15 mm. Where the old ceiling is loose over more than a small area, strip it.

Do I need Building Control to replace a ceiling?

Not usually for a like-for-like reboard of a single ceiling in a house. The exceptions: a ceiling that forms part of a fire-resisting floor (flats, HMOs, three-storey houses), where the replacement must maintain the fire resistance and may need to be demonstrated; and a top-floor ceiling where more than half the roof thermal element is being renovated, which brings in the Part L insulation upgrade. If in doubt, a building notice (£150–£300) covers it.

What is the dust like, and is old plaster dangerous?

A lath-and-plaster strip-out is the dustiest job in domestic plastering: lime, horsehair, soot and a century of loft dust. It is not usually hazardous in the asbestos sense (lime plaster and laths contain no asbestos), but any textured coating on the surface from before 2000 must be sampled first, and some pre-1980s ceilings are asbestos insulating board, which is licensed work. Seal the room, run an extractor, wear FFP3 masks, and keep the customer out until it is cleaned.

How long before I can paint a new ceiling?

A two-coat skim is touch-dry in a day and ready for a mist coat (watered-down emulsion) after 5–7 days in a heated, ventilated room, longer in winter. Painting too soon traps moisture and the paint peels. Put the drying time on the quote so the decorator is booked for the right week.

Regulations & Standards