Summary

The four EICR codes are the single most argued-over part of domestic electrical inspection. A landlord sees a C2 and thinks the house is about to burn down; a tenant sees a C3 and refuses to move in; an agent sees FI and does not know whether the report has passed or failed. Electricians disagree too, which is why two inspectors can look at the same 1980s consumer unit and one writes C2 while the other writes C3. The codes themselves are short and clear. The difficulty is applying them consistently, and explaining to a customer what each one obliges them to do.

This article is for the electrician writing the report and for the tradesperson who has to price the remedial work that follows. It sets out the definition of each code, the common domestic observations that attract each one with the industry consensus on which code applies, how the codes drive the overall satisfactory or unsatisfactory assessment under the current Appendix 6 form, and what the codes mean legally for landlords under the 2020 Regulations. It does not cover how to carry out the inspection itself; see electrical installation condition report for extent, sampling and testing, and eicr pricing guide for what to charge.

One point worth stating up front: an EICR is a judgement against the current edition of BS 7671, but a departure from the current edition is not automatically a defect. An installation wired to the 15th or 16th Edition that remains in good condition and is not dangerous is coded C3 at most. The question an inspector asks of every observation is not "does this comply with the 18th Edition?" but "is this dangerous, potentially dangerous, or merely not what we would do today?"

Key Facts

Quick Reference Table

Quoting an electrical job? Describe the work and squote handles the pricing.

Try squote free →
Code Wording on the form Meaning in practice Effect on overall assessment Landlord duty (England PRS)
C1 Danger present. Risk of injury. Immediate remedial action required Someone could be injured now Unsatisfactory Remedy within 28 days (in reality: immediately)
C2 Potentially dangerous. Urgent remedial action required One further fault or event away from danger Unsatisfactory Remedy within 28 days
C3 Improvement recommended Not to current standard, but not dangerous Satisfactory None (good practice only)
FI Further investigation required without delay Inspector could not determine whether danger exists Unsatisfactory Investigate and remedy within 28 days

Detailed Guidance

C1 — danger present

C1 is reserved for observations where a person or livestock could be injured, or a fire started, without anything else going wrong first. Typical domestic examples:

A C1 obliges the inspector to act on the day. The accepted sequence is: tell the client, obtain permission to make safe, isolate or repair as far as the agreed scope allows, and if the client refuses, record the refusal and issue a written Danger Notification. Walking away from a C1 with nothing more than a line on a report is not acceptable practice and would not survive scrutiny if someone were later hurt.

C2 — potentially dangerous

C2 is the code that generates most remedial work and most disagreement. The test is whether the defect is likely to result in danger through a single further fault or a reasonably foreseeable event. BPG4 gives the clearest domestic examples, and the following are generally agreed:

The consistent theme is that a C2 defect is dormant until something else happens: a flex gets cut on a lawnmower, a lighting fitting develops an earth fault, a nail goes through a cable. Remove the thing that would turn the fault into an injury, and you have remedied the C2.

C3 — improvement recommended

C3 records departures from the current BS 7671 that do not give rise to danger. The installation would not be designed this way today, but nobody is at risk. Common domestic C3 observations:

A report with only C3 items is satisfactory. Under the 2020 Regulations the landlord has no legal duty to act on C3 items, though a well-written report explains why acting on them is still worthwhile. Many of the C3 items above, particularly RCD protection, cost little to fix at the same time as C2 work and remove most of the residual risk in an older installation.

FI — further investigation required

FI is the code for the inspector's own uncertainty: a defect might exist but could not be confirmed within the agreed extent and limitations. Legitimate uses:

FI is not a way of avoiding a decision. If the inspector can see the defect and knows what it is, it gets a C1, C2 or C3. FI makes the report unsatisfactory and, in the private rented sector, starts the 28-day clock, so it has real consequences. The inspector should say in the observation exactly what investigation is needed, so the follow-up electrician does not have to re-inspect the whole installation to find it.

How the overall assessment is decided

The logic has always been simple: any C1, C2 or FI gives an unsatisfactory assessment; C3 observations alone give a satisfactory assessment. What changed in Amendment 4 is the layout of the form. On the old single-table Section K, a C3 sat in the same list as C1 and C2 and was routinely misread as a failure item by landlords and letting agents. The A4 form separates the observations into a C1/C2 table and a C3/FI table so the outcome is visually tied to the first table. FI remains an unsatisfactory outcome and must be followed up; placing it alongside C3 on the form reflects that it is not a confirmed defect, not that it can be ignored.

When writing up, state the overall assessment on the report, in the covering email and in the quote for remedial work. Then list the C1/C2/FI items as mandatory, and the C3 items as recommended, with separate prices. This is what the landlord's letting agent needs to see to demonstrate compliance, and it avoids the common dispute where a customer is asked to pay for a C3 item they believed was legally required.

Coding consistency — using BPG4

Electrical Safety First's Best Practice Guide 4 is a free document, written with the IET, NICEIC, NAPIT, ECA and others, that lists dozens of common domestic observations and the code each should attract. It is not a British Standard, but it is the closest thing the trade has to an agreed interpretation, and competent person scheme assessors use it when auditing reports. Two rules of thumb drawn from it:

Is there a risk of injury NOW?
  ├── Yes ────────────────────────────────→ C1 (make safe today)
  └── No
       │
       Would ONE further fault or foreseeable event make it dangerous?
         ├── Yes ──────────────────────────→ C2 (urgent remedial action)
         └── No
              │
              Can you confirm whether a danger exists?
                ├── No, not within the agreed extent ──→ FI (investigate without delay)
                └── Yes, and it is simply not to current standard → C3 (improvement recommended)

If a report is challenged, the question an assessor asks is whether the code can be justified against this logic and against BPG4. "I always code plastic consumer units C2" is not a justification. "There is thermal damage at the main switch terminals of a non-metallic consumer unit, photograph attached" is.

Pricing the remedial work

For the tradesperson quoting after an unsatisfactory report, the usual pattern is a small number of C2 items and a longer list of C3. Typical remedial prices in England and Wales (labour and materials, excluding VAT) are shown below; adjust for region and access.

Remedial item Typical code Typical price
Main protective bonding to gas and water (10 mm² green/yellow, two clamps) C2 £120–£250
Replace damaged socket or switch front C1 or C2 £40–£80 each
Add 30 mA RCD protection by replacing MCBs with RCBOs (per circuit) C2 or C3 £70–£120 per way
Consumer unit replacement (metal, RCBOs, SPD, 8–12 ways) C3 (C2 if damaged) £550–£1,100
Add CPC to a lighting circuit (re-run cable, one floor) C2 £250–£600
Re-terminate overheated connection and replace accessory C2 £60–£150
Install warning labels, RCD test notice, circuit chart C3 £20–£50
Trace and identify unknown circuit (FI follow-up, per hour) FI £45–£75/hour

Prices in this table are indicative 2026 figures and should be checked against local rates. A follow-up visit to confirm remedial work and issue written confirmation is itself chargeable and should be in the quote; landlords need that confirmation in writing within the 28-day window.

Frequently Asked Questions

Does a C2 mean the property cannot be let?

Not in itself. The 2020 Regulations do not prohibit letting; they require the landlord to obtain a satisfactory report and, where the report is unsatisfactory, to complete the remedial work within 28 days and obtain written confirmation. A property can be occupied during that window. A C1, however, means danger is present now, and the electrician should have made it safe on the day. A landlord who leaves a known C1 in an occupied property is exposed well beyond the Regulations, including under the Landlord and Tenant Act 1985 repairing obligations and the Homes (Fitness for Human Habitation) Act 2018.

Why did one electrician code my plastic consumer unit C2 and another C3?

Because the first was wrong, unless there was evidence of damage. BPG4 and the main scheme providers agree that a non-metallic consumer unit, including one under a wooden staircase or on the sole escape route, is a C3 on an existing installation. It becomes C2 where there is thermal damage, poor connections or missing blanks that would let a fault escape the enclosure. Inconsistent coding of consumer units is the most common EICR complaint scheme providers receive.

Is FI a pass or a fail?

A fail, in the sense that the overall assessment is unsatisfactory and, in the private rented sector, the 28-day duty applies. The investigation may conclude there is no defect, in which case the follow-up electrician issues written confirmation and the installation is then treated as satisfactory. Do not use FI as a soft option to avoid committing to a C2; it has the same legal effect and costs the landlord a second visit.

Does every departure from the 18th Edition need a code?

No. The report records observations that are dangerous, potentially dangerous or that the inspector recommends improving. An installation wired to an earlier edition is not required to comply with the current one. Items such as the absence of AFDDs or SPDs on an older installation are C3 at most, and some inspectors legitimately choose not to list every such item, instead noting in the general comments that the installation pre-dates the current edition. What must never be omitted is a C1, C2 or FI.

Can a tenant or agent demand that C3 items are fixed?

They can ask, but there is no legal duty on the landlord under the 2020 Regulations to act on C3 observations. A satisfactory report with C3 items is a satisfactory report. Agents who insist "everything on the report must be done" are misreading the form, which is exactly the confusion the two-table layout in Amendment 4 was introduced to reduce.