Summary
The safe zones are one of the most-searched and most-misunderstood parts of the Wiring Regulations. Electricians know them as the lines they are allowed to chase cables along; kitchen fitters, plumbers and carpenters know them, or should, as the lines where they must not drill. The two uses are the same rule from opposite sides. The regulation exists because a cable buried in plaster is invisible to the next person to fix a shelf, and the only defences are predictability (the zones), physical protection (steel) or a device that cuts the supply fast enough when a screw goes through the cable (the RCD).
The requirement has been stable in substance since the 17th Edition in 2008, when 30 mA RCD protection was added to the zone rule for domestic installations, and it was carried unchanged through the 18th Edition and its amendments to A4:2026. What changes between installations is the wall. A 100 mm block wall with 15 mm of plaster, a 1930s lath-and-plaster partition, a dot-and-dab plasterboard dry-lining and a metal-stud partition are all treated differently, and the most common real-world error is to run flat twin-and-earth down the dab line of a dry-lined wall outside any zone, without RCD protection, because "it's behind plasterboard, not in the wall".
This guide sets out the regulation as written, with the depth, zone and RCD logic laid out so that both the installer and the person fixing to the wall can apply it; the special cases of metal partitions, floors and ceilings; what an inspector codes on an EICR when the rule is not met; and how to price the remedial work. For cable fixing and support see cable clipping and fixings; for the RCD types that satisfy the requirement see rcd types explained.
Key Facts
- Regulation — BS 7671:2018+A4:2026, Section 522.6 (impact), Regulations 522.6.201 (floors and ceilings), 522.6.202 (cables concealed in walls at less than 50 mm: zones and RCD protection), 522.6.203 (partitions with metallic parts) and 522.6.204 (the alternative protection methods); the substance is unchanged since the 17th Edition, except that Amendment 3:2015 removed the exemption for installations under the supervision of skilled or instructed persons, so the RCD requirement now applies to every installation
- Depth threshold — 50 mm from any surface of the wall or partition to the cable. At 50 mm or more, no zone, mechanical protection or RCD is required by 522.6 (though RCD protection for the circuit may be required by other regulations)
- Zone 1 — top of wall — within 150 mm of the junction of the wall and the ceiling (measured from the finished ceiling)
- Zone 2 — corners — within 150 mm of an angle formed by two adjoining walls or partitions (internal or external corners), measured along the wall from the corner
- Zone 3 — line of accessory — horizontally or vertically from any point, accessory or switchgear on the wall, the zone being the width or height of the accessory and running to the edge of the wall
- Reverse side — a zone created by an accessory on one face of a wall applies on the other face only if the wall or partition is 100 mm thick or less (the position of the accessory can then be inferred from the other side)
- Protection options for a cable less than 50 mm deep — (i) earthed metallic covering meeting the requirements for a protective conductor (SWA, MICC); or (ii) enclosed in earthed steel conduit, trunking or ducting; or (iii) mechanical protection sufficient to prevent penetration by nails, screws and the like (steel capping is generally not considered sufficient on its own); or (iv) installed in a prescribed zone
- RCD requirement — a cable relying on the zone (option iv) alone must additionally be protected by an RCD with a rated residual operating current not exceeding 30 mA (Regulation 415.1.1). Since Amendment 3:2015 this applies to every installation, domestic or commercial; the earlier exemption for installations under the supervision of skilled or instructed persons no longer exists
- Metal partitions — where the partition's internal construction includes metallic parts other than fixings (metal stud, metal lath), every concealed cable at any depth must have protection (i), (ii) or (iii), be SELV or PELV, or have 30 mA RCD protection
- Floors and ceilings — Regulation 522.6.201: cables under floors or above ceilings must be run where they will not be damaged by contact with the floor, ceiling or their fixings; through joists, the hole or notch must keep the cable at least 50 mm from the top or bottom surface, or the cable must have protection (i) to (iii) (see joist installation)
- Steel capping — protects against plaster damage and trowel strikes, not against drilling; it does not satisfy the mechanical protection option and the zone and RCD rules still apply
- Oval conduit, PVC conduit — do not provide earthed metallic covering or nail protection; the zone and RCD rules still apply
- Dry-lined and dot-and-dab walls — a cable behind plasterboard on dabs is concealed in the wall at a depth less than 50 mm; the zones and RCD rule apply exactly as for a chased cable
- EICR coding — a cable less than 50 mm deep, outside a zone, with no mechanical protection and no RCD is normally a C2 (potentially dangerous); the same cable in a zone but without RCD protection on an older installation is normally a C3, rising to C2 where the circuit supplies sockets likely to be used outdoors or is in a bathroom (see eicr codes c1 c2 c3 fi explained)
- Approved Document P — the Building Regulations route by which BS 7671 is enforced in dwellings in England; new circuits and consumer unit changes are notifiable (see part p notifiable work)
- Fixing to walls — the practical rule for other trades: assume cables run in the zones, locate them with a detector before drilling, and keep fixings out of the 150 mm bands and the lines above, below and beside accessories
Quick Reference Table
Quoting an electrical job? Describe the work and squote handles the pricing.
Try squote free →| Cable position | Depth | Wall type | Mechanical protection? | In a zone? | RCD 30 mA required by 522.6? | Compliant? |
|---|---|---|---|---|---|---|
| Chased into block, plastered | ≥50 mm | Solid | No | Not relevant | No | Yes |
| Chased into block, plastered | <50 mm | Solid | No | Yes | Yes | Yes, with RCD |
| Chased into block, plastered | <50 mm | Solid | No | No | — | No |
| In earthed steel conduit | <50 mm | Any | Yes (ii) | Not required | No | Yes |
| SWA or MICC | <50 mm | Any | Yes (i) | Not required | No | Yes |
| In PVC oval conduit, in zone | <50 mm | Solid | No | Yes | Yes | Yes, with RCD |
| Under steel capping, in zone | <50 mm | Solid | No (capping is not sufficient) | Yes | Yes | Yes, with RCD |
| Behind dot-and-dab plasterboard | <50 mm | Dry-lined masonry | No | Yes | Yes | Yes, with RCD |
| Behind dot-and-dab plasterboard | <50 mm | Dry-lined masonry | No | No | — | No |
| In timber stud partition | Any | Timber stud | No | Yes | Yes | Yes, with RCD |
| In metal stud partition | Any | Metal stud | No | Yes or no | Yes (regardless of zone) | Yes, with RCD |
| In metal stud partition, in earthed steel conduit | Any | Metal stud | Yes (ii) | Not required | No | Yes |
| Through joist, hole centred | ≥50 mm from top and bottom | Floor | No | — | No | Yes |
| Notched into top of joist under floorboards | <50 mm | Floor | No | — | — | No without protection (i)–(iii) |
Detailed Guidance
What the regulation is trying to achieve
Section 522 of BS 7671 deals with external influences on wiring systems, and 522.6 with impact. The concealed-cable rules recognise that a cable in a wall will, sooner or later, be in the path of a drill or a nail driven by someone who cannot see it. The regulation offers three ways to make that event safe and one way to make it less likely:
- Make the cable robust (earthed metallic sheath or armour, or earthed steel conduit): a screw that penetrates the sheath contacts earthed metal first and the protective device operates
- Keep the fixing out (mechanical protection sufficient to stop nails and screws): in practice heavy-gauge steel plate or channel, rarely used domestically
- Put the cable where people expect it (the zones), so that anyone who knows the rule avoids those lines
- And, if relying on the zones alone, cut the supply fast (30 mA RCD) when a fixing does penetrate, limiting the shock to a survivable duration
The 50 mm figure reflects the length of a typical fixing; the vast majority of domestic screws and nails are shorter. A cable deeper than that is deemed out of reach.
The three zones, precisely
The zones are measured on the face of the wall:
- Within 150 mm of the top of the wall. A horizontal band 150 mm deep immediately below the ceiling, the full length of the wall. The equivalent band at the bottom of the wall is not a zone; the floor junction is where skirting is fixed, which is exactly why it was excluded.
- Within 150 mm of a corner. A vertical band 150 mm wide running full height along each side of every internal and external corner formed by two adjoining walls or partitions. A corner formed by a wall and a chimney breast counts; a window reveal does not create a zone along the window.
- In line with an accessory. From every socket, switch, fused connection unit, light point, consumer unit or other item fixed to the wall surface, a vertical zone the width of the accessory running up to the ceiling and down to the floor, and a horizontal zone the height of the accessory running to the edges of the wall in both directions. The zone belongs to the accessory; remove the accessory and the zone no longer exists, which matters when a socket is blanked off and plastered over.
The reverse-side rule: a zone created by an accessory extends to the other face of the wall only if the wall is 100 mm thick or less, because only then could someone on the other side reasonably infer where the cable is. A cable dropping to a socket on one side of a 215 mm brick wall is not in a zone when viewed from the other side, and must be protected accordingly, or kept 50 mm deep from that face.
Depth: how it is measured and why dry-lining is caught
Regulation 522.6.202 is the wall rule. Depth is measured from the finished surface of the wall or partition to the cable. In a chased solid wall with a 15 mm plaster coat, a chase 35 mm deep puts the cable at 50 mm and outside the rule; most domestic chases are 20–25 mm, so the cable sits at 35–40 mm and the zone and RCD rules apply.
In a dry-lined wall the plasterboard is the surface. A cable clipped to the masonry behind 12.5 mm board on 10 mm dabs is at about 25 mm and is concealed in the wall for the purposes of 522.6. It must be in a zone and RCD protected, or mechanically protected. Running cables anywhere convenient behind dry-lining is a widespread practice and a common C2 on EICRs when discovered during a socket replacement.
In a timber stud partition the cable passes through holes in the studs and lies in the void. It is concealed at less than 50 mm from at least one face unless the partition is unusually thick. The zone rule applies; running the cable through the centre of 100 mm studs puts it at roughly 56 mm from each face and outside the rule in theory, but where it drops in the void to an accessory it is in that accessory's zone anyway.
Metal partitions: RCD regardless of depth
Regulation 522.6.203 deals with partitions. Where the partition has metal studs, metal lath, metal channel or other metallic parts in its construction (fixings such as screws are excluded), a fixing driven into the wall can make the whole frame live if it penetrates a cable. The regulation therefore requires every concealed cable in such a partition, at any depth and whether or not in a zone, to have an earthed metallic covering, earthed steel conduit or trunking, adequate mechanical protection, or 30 mA RCD protection, or to be SELV or PELV. In practice, in a domestic metal-stud wall this means RCD protection on every circuit in the partition, and grommets or sleeving where cables pass through the studs to prevent chafing.
Floors and ceilings
Regulation 522.6.201 covers cables under floors and above ceilings. They must be run where they will not be damaged by contact with the floor or ceiling or their fixings. For cables through joists, the IET On-Site Guide gives the practical rule: holes drilled on the joist centreline, at least 50 mm from the top and bottom surface, within the permitted zone along the joist; notches in the top of a joist with the cable less than 50 mm from the floorboard face need the cable protected by (i) to (iii), in practice earthed steel conduit or a steel plate. Cables laid loose across the top of ceiling joists in a loft are not concealed in a wall and 522.6 does not apply, but they must be supported and protected from mechanical damage under Section 522.8 (see cable clipping and fixings and joist installation).
Design and installation practice
- Plan accessory positions so that cable routes fall naturally in zones: drops from the ceiling band to each accessory, horizontal runs between accessories at the same height, corner drops where a run has to change walls
- Where a route cannot be kept in a zone (a cable crossing a wall diagonally to avoid a steel), use earthed steel conduit or SWA for that section, or chase to 50 mm where the wall permits
- Fit 30 mA RCD protection (RCBOs for preference) to every circuit with concealed cables in zones; on a new or rewired domestic installation this is already required for most circuits by other regulations, so the zone rule rarely adds cost
- Record cable routes on the Electrical Installation Certificate schedule or a sketch left with the customer; it is good practice and the next tradesperson will thank you
- Do not rely on steel capping, PVC conduit or oval conduit as mechanical protection; they are for plaster protection and future cable replacement
For other trades fixing to walls: assume there are cables within 150 mm of the ceiling, within 150 mm of every corner, and in vertical and horizontal lines from every socket, switch and light. Use a cable detector, drill shallow first, and keep fixings for kitchen units, shelving and curtain rails out of those bands where the design allows. The zones do not make drilling into them safe; they tell you where the danger is.
What the inspector codes
An EICR observation about concealed cables is one of the commonest items on a report for a 1980s to 2000s house. The accepted coding, consistent with Electrical Safety First Best Practice Guide 4:
- Cable at less than 50 mm depth, not in a zone, no mechanical protection, no 30 mA RCD: C2
- Cable in a zone, no RCD protection, installation pre-dates the RCD requirement, circuit not supplying sockets for outdoor use or a bathroom: C3
- Cable in a zone, no RCD protection, circuit supplies sockets likely to be used outdoors, or is in a bathroom: C2
- Cable in metal-stud partition, no RCD and no mechanical protection: C2
The remedial work is almost always RCD protection at the consumer unit: RCBOs at £70–£120 per circuit fitted, or a consumer unit replacement at £550–£1,100 (see consumer unit upgrade). Re-routing or re-running a cable that is outside a zone is only necessary if RCD protection cannot be provided, which is rare.
Frequently Asked Questions
If the cable is in a safe zone, does it still need an RCD?
Yes, in a domestic installation. The zone on its own satisfies the location requirement, but a cable relying on the zone rather than on an earthed metallic covering, earthed steel conduit or adequate mechanical protection must also be protected by a 30 mA RCD. The two requirements work together: the zone makes a strike less likely, the RCD makes a strike survivable.
Does steel capping count as mechanical protection?
No. Steel capping protects the cable from the plasterer's trowel and makes a future cable pull possible; it will not stop a screw or a masonry drill. A cable under capping is treated as an unprotected cable: it must be in a zone and RCD protected, or be deeper than 50 mm.
Are the zones different in Scotland or on commercial jobs?
BS 7671 applies across the UK, so the zones are the same, and since Amendment 3:2015 the RCD requirement attached to the zone rule applies to every installation. The old exemption for commercial and industrial installations under the supervision of skilled or instructed persons was removed; a concealed cable in a zone in an office or shop needs 30 mA RCD protection or one of the mechanical alternatives just as it does in a house.
Can I run a cable horizontally at socket height around a room?
Only in the horizontal zone of an accessory on that wall, which extends from the accessory to the edges of that wall at the accessory's height. On a wall with no accessory there is no horizontal zone at socket height, and a cable there must be 50 mm deep, mechanically protected, or re-routed via the ceiling band or a corner. Looping a ring final horizontally between sockets on the same wall is fine; carrying on across a wall with no socket is not.
What should a kitchen fitter do before drilling for wall units?
Assume the ceiling band, both corners and the vertical and horizontal lines from every socket, switch and the cooker switch contain cables, and that a cable also runs behind the worktop sockets to feed them. Use a cable detector, mark the lines, and position fixings between them. Where a fixing has to go into a zone, drill shallow, check, and use the shortest fixing that will do the job. If the circuit is not RCD protected, say so to the customer; it is a legitimate reason to add RCBOs before the kitchen goes in.
Regulations & Standards
BS 7671:2018+A4:2026 (IET Wiring Regulations, 18th Edition, Amendment 4) — Section 522.6 external influences: impact; Regulation 522.6.201 (cables under floors and above ceilings, including cables through joists), 522.6.202 (cables concealed in walls or partitions at less than 50 mm: zones and 30 mA RCD protection), 522.6.203 (partitions with metallic parts) and 522.6.204 (earthed metallic covering, earthed conduit or trunking, mechanical protection, SELV/PELV); Regulation 415.1.1 (RCD additional protection); Section 522.8 (mechanical stresses and support)
IET On-Site Guide (BS 7671:2018+A4:2026 edition) — Section 7.3 cables concealed in walls, with the zone diagram used throughout the trade
IET Guidance Note 1: Selection & Erection — detailed guidance on concealed cable protection
Electrical Safety First Best Practice Guide 4 — EICR coding of concealed cables without zone or RCD protection
Building Regulations 2010, Approved Document P (England) — electrical safety in dwellings; BS 7671 as the means of compliance; notifiable work
Electricity at Work Regulations 1989 — the duty to prevent danger from electrical systems, under which an unprotected concealed cable in a workplace is a hazard
BS EN 61439-3 — consumer units (the enclosure the remedial RCBOs go into)
BS EN 61008 / BS EN 61009 / BS EN 62423 — RCCBs, RCBOs and Type F/B RCDs that satisfy the 30 mA requirement
IET — BS 7671 Wiring Regulations — the current edition and amendments
IET — Wiring Matters: Cables concealed in walls — IET technical articles on Section 522.6
Electrical Safety First — Best Practice Guides — BPG4 coding of concealed cables
GOV.UK — Approved Document P: Electrical safety — Building Regulations route for BS 7671 in dwellings
HSE — Electricity at Work Regulations 1989 guidance (HSR25) — preventing danger from electrical systems
NICEIC — Technical guidance — scheme guidance on concealed cables and RCD protection
cable clipping and fixings — support spacings, fixings and fire-resistant supports under Section 522.8
rcd types explained — the RCD and RCBO types that provide the 30 mA protection
rcd vs rcbo — choosing between a shared RCD and per-circuit RCBOs for remedial work
eicr codes c1 c2 c3 fi explained — how concealed-cable observations are coded
consumer unit upgrade — the usual remedial route when circuits lack RCD protection
rewire guide — planning cable routes in a rewire
joist installation — notching and drilling joists for cables and pipes
socket heights — accessory positions that define the zones