Summary
Before 2020, landlords in England had no single statutory duty to periodically test the electrical installation in most privately rented homes — mandatory testing existed for licensed HMOs under separate housing conditions, but ordinary single-let properties relied on general "fit for habitation" duties rather than a specific testing regulation. The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 closed that gap, creating a clear, enforceable duty that mirrors the long-established gas safety check regime.
The regulation itself doesn't invent new technical standards — the inspection is still carried out and reported against BS 7671, exactly as any EICR always has been, using the familiar C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended), and FI (further investigation) classification codes. See electrical installation condition report for the full technical detail of how an EICR is conducted and classified. What this regulation adds is the legal duty and timetable around that existing technical process: who must commission it, how often, what must happen with an unsatisfactory result, and what penalties apply for non-compliance.
For tradespeople, the practical effect has been a steady, predictable stream of landlord-commissioned EICR work and remedial jobs, because the 5-yearly cycle and documentation duty give landlords a concrete, dated reason to act rather than an open-ended "should probably get it checked sometime."
Key Facts
- Regulations — Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020.
- Commencement — 1 June 2020 for new tenancies; 1 April 2021 extended the duty to all existing tenancies.
- Scope — privately rented domestic property in England; social housing and owner-occupied property are not covered by this specific regulation.
- Testing frequency — EICR required at least every 5 years, or sooner if a report or manufacturer's instructions specify a shorter interval.
- Who can carry out the inspection — a person who is qualified and competent, typically evidenced by registration with a recognised competent person scheme (e.g. NICEIC, NAPIT) or equivalent qualification.
- Satisfactory vs unsatisfactory — a report with no C1/C2/FI codes is "satisfactory"; any C1, C2, or FI finding makes the report "unsatisfactory" and triggers the remedial duty.
- Remedial timescale — further investigative or remedial work for C1/C2/FI findings must be completed within 28 days of the inspection, or within a shorter period if the report specifies one.
- Written confirmation required — once remedial work is done, the landlord must obtain written confirmation from the person who carried it out that the work addresses the issue, and (where applicable) a further report confirming a satisfactory outcome.
- Document retention and disclosure — landlords must give a copy of the most recent satisfactory report to existing tenants within 28 days of the inspection, to new tenants before they occupy, and to the local housing authority within 7 days of a written request.
- Enforcement — local housing authorities enforce the regulations; a landlord in breach can face a remedial notice and a financial penalty of up to £30,000.
- Interaction with HMO licensing — licensed HMOs already had electrical safety testing conditions through HMO licensing (see hmo licensing); this regulation extends an equivalent duty to the much larger population of ordinary single-let privately rented properties.
- Devolved position — this specific regulation is England-only. Scotland has its own electrical safety duty under the Repairing Standard (also broadly a 5-yearly EICR requirement, but under separate Scottish legislation); Wales has its own framework under the Renting Homes (Wales) Act. ****
Quick Reference Table
Need to quote compliant work? squote includes relevant regulations in your quotes.
Try squote free →| Requirement | Detail |
|---|---|
| Testing interval | At least every 5 years (or sooner if specified) |
| Commencement (new tenancies) | 1 June 2020 |
| Commencement (all tenancies) | 1 April 2021 |
| Who must be competent | Person undertaking the EICR — qualified/competent person |
| Classification codes | C1 (danger present), C2 (potentially dangerous), C3 (improvement recommended), FI (further investigation) |
| Remedial deadline | 28 days from inspection (or sooner if specified) for C1/C2/FI |
| Tenant disclosure | Copy to existing tenant within 28 days of inspection |
| New tenant disclosure | Copy before occupation |
| Local authority disclosure | Copy within 7 days of written request |
| Maximum penalty | Up to £30,000 per breach |
Detailed Guidance
What triggers the remedial clock
The 28-day remedial deadline starts from the date of the inspection that identifies a C1, C2, or FI finding — not from when the landlord gets around to reading the report or arranging a contractor. A landlord who sits on an unsatisfactory report for two weeks before calling an electrician has already used up a significant portion of the statutory window, which is worth flagging clearly when quoting remedial work so the urgency is understood on both sides.
What "written confirmation" actually needs to contain
Simply fixing the fault isn't sufficient on its own — the landlord needs documented evidence that the remedial work was carried out and that it addresses the specific issue identified in the original EICR. In practice this means the electrician doing the remedial work should provide a clear written statement referencing the original report's finding(s), plus — where the original report calls for it — a further EICR or supplementary report confirming the installation is now satisfactory. Keeping this documentation discipline tight protects both the landlord (compliance evidence) and the electrician (clear record of exactly what was done and why).
C3 findings don't trigger the statutory remedial duty — but shouldn't be ignored
A report that contains only C3 (improvement recommended) codes, with no C1/C2/FI, is still classified "satisfactory" under the regulations and doesn't trigger the 28-day remedial duty. This is worth explaining clearly to landlords who might otherwise assume any flagged issue is mandatory — C3 items are good-practice recommendations (e.g. no RCD protection where modern standards would now require it on an older, unaltered installation) rather than compliance failures, though addressing them is still sound advice for tenant safety and future-proofing.
The relationship with HMO licensing and other PRS duties
For licensed HMOs, electrical safety testing was already a licence condition before this regulation existed — see hmo licensing. This regulation's significance is extending an equivalent, nationally consistent duty to the much larger pool of standard single-let tenancies that previously had no specific statutory testing requirement. It also now sits alongside the wider raising of the bar on private rented sector compliance generally — see renters rights act 2026 landlord compliance for how recent reform is tightening repair-response timescales on top of these existing certification duties.
Common landlord misconceptions worth correcting
Landlords sometimes assume a Part P electrical installation certificate from recent work (an EIC) satisfies this ongoing duty — it doesn't; an EIC confirms new work was correctly installed at the time, while the EICR is a periodic condition assessment of the whole existing installation. Equally, some assume the duty only applies to older properties — it applies to all private rented property regardless of age, since even a relatively new installation needs re-assessment on the same 5-year cycle.
Frequently Asked Questions
Does a brand-new electrical installation still need an EICR within 5 years?
Yes. The 5-year clock applies regardless of how recently the installation was fitted or last tested — a landlord can't rely indefinitely on an installation certificate from the original work.
Can the landlord do the inspection themselves if they're a qualified electrician?
The regulations require the inspection to be carried out by a person who is qualified and competent — a landlord who happens to be a qualified, competent electrician could in principle satisfy this, but most landlords are not electricians and must commission an independent, competent person.
What if the tenant refuses access for the inspection?
Landlords must take "reasonable steps" to comply, which typically means being able to evidence repeated reasonable attempts to arrange access; persistent tenant refusal with documented attempts to gain access is generally treated as a mitigating factor, though the landlord should keep clear records of each attempt.
Is this the same as an Energy Performance Certificate or gas safety check?
No — this is specifically about the electrical installation (wiring, consumer unit, fixed electrical safety) under BS 7671, entirely separate from the EPC/MEES energy-efficiency duty (see mees regulations) and the gas safety certificate (CP12) duty, though all three now form part of a landlord's standard annual/periodic compliance checklist.
Regulations & Standards
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 — primary source of the duty described in this article.
BS 7671:2018+A2:2022 — the technical wiring regulations against which the EICR inspection and classification are carried out.
Housing Act 2004 — underlying framework for HMO licensing conditions that pre-date this regulation for licensed HMOs.
GOV.UK — Electrical safety standards in the private rented sector — official landlord/tenant guidance.
BSI — BS 7671 Requirements for Electrical Installations — technical EICR inspection and classification standard.
electrical installation condition report — full technical detail of the EICR inspection and C1/C2/C3/FI classification system.
hmo licensing — pre-existing electrical testing duty for licensed HMOs.
renters rights act 2025 landlord compliance — recent PRS reform tightening landlord repair-response obligations more broadly.
mees regulations — the separate EPC/energy-efficiency landlord duty, distinct from this electrical safety duty.