Summary
Amendment 4 is the largest change to the 18th Edition since Amendment 2 in 2022. Where Amendment 3 (July 2024) was a single-issue change — Regulation 530.3.201 on bidirectional protective devices for prosumer installations — Amendment 4 touches every part of the book and adds new sections for technologies that barely existed when the 18th Edition was drafted: home battery storage at scale, vehicle-to-grid, and powered data cabling feeding lighting and building services. It also tidies up the inspection and testing paperwork that electricians use every day, and that change will be the one most of the trade notices first.
The six-month overlap period was designed so that jobs designed and priced to A2/A3 before April could be completed and certified to that edition. That window closed on 15 October 2026. From now on the edition box on an Electrical Installation Certificate (EIC), Minor Electrical Installation Works Certificate (MEIWC) or Electrical Installation Condition Report (EICR) should read BS 7671:2018+A4:2026, and scheme providers (NICEIC, NAPIT, ELECSA, SELECT, Stroma) have updated their model forms accordingly. Anyone still carrying a 2022 brown book with the A3 corrigendum tucked inside is now working to a withdrawn standard.
This article sets out what changed, which regulations and appendices moved, what it means on site for domestic and small commercial work, and what it does not mean — in particular, that an existing installation certified to A2 or earlier does not suddenly need remedial work. Where a secondary source gives a regulation number that could not be confirmed against the published standard, it is marked rather than stated as fact. The authoritative text is the book itself, available from the IET and BSI.
Key Facts
- Published 15 April 2026; usable immediately from that date; previous edition withdrawn 15 October 2026
- Citation: BS 7671:2018+A4:2026. Amendment 3:2024 is incorporated into the main text, so there is no longer a separate A3 document to carry alongside
- New chapter — Stationary secondary batteries (Chapter 57): system design, power conversion equipment, bidirectional/hybrid inverters, protective devices for two-way energy flow including vehicle-to-home (V2H) and vehicle-to-grid (V2G), battery location, ventilation and fire-risk mitigation. A battery is treated as a generating set, not simply a load
- Regulation 551.7.1: a suitable protective device is required where energy flow is bidirectional, and a source must not be connected on the load side of an RCD in certain conditions — the Amendment 3 principle now sitting in the generating-sets section
- New Section 716 — Power over Ethernet (PoE): Part 7 special location; SELV/PELV supplies over structured cabling; voltage limits 60 V ripple-free DC in dry locations, 15 V ripple-free DC elsewhere; cabling and connectors to BS ISO/IEC 11801-1 rated for a continuous 750 mA per contact
- New section — Functional earthing and functional equipotential bonding for ICT equipment (Section 545): earthing arrangements for data and communications systems distinct from protective earthing
- Table 51 conductor identification: adds functional bonding and combined protective-and-functional conductors; a functional bonding conductor must not be identified by FE markings or green-and-yellow
- Section 710 Medical Locations — major revision: locations classified as Group 0, Group 1 and Group 2; Group 2 (operating theatres, intensive care) requires a medical IT system with an isolating transformer and insulation monitoring device, two independent supplies and a UPS located as close as practicable to the equipment; aligned with IEC 60364-7-710:2021
- Appendix 6 — EICR redrafted: observations in Section K split into two tables — C1/C2 (which make the report unsatisfactory) and C3/FI (which do not, although FI must still be acted on). FI is for items the inspector could not verify within the agreed extent and limitations. Photographic or thermographic images may be attached to support observations
- Two signature blocks on the EIC, MEIWC and EICR: one for the person who inspected and tested, one for the person who authorised the report
- Recipient guidance issued with an EICR now runs to 15 items including: test RCDs six-monthly via the test button; test AFDDs with a manual test facility six-monthly; check SPD status indicators
- Model-form earthing options now list TN-C-S (PME) and TN-C-S (PNB) separately, alongside TN-C, TN-S, TT and IT. Regulation 312.2.1.1 and Figure 3.9B add protective neutral bonding (PNB), typically seen on private networks and multiple-source supplies
- Appendix 4 buried-cable tables revised (Tables 4A2, 4D4A, 4E4A, 4H4A, 4J4A): current-carrying capacity now distinguishes cables in direct contact with soil from cables in a duct — relevant to every SWA run to an outbuilding or EV charger
- Regulation 422.2.1: lists the cable types permitted within protected escape routes; cables within a fire-resisting enclosure are treated as outside the route
- Regulation 537.4.2: firefighter's switches required where the fire strategy specifies them
- Section 551 (generating sets) redrafted
- Chapter 81 energy efficiency replaces Appendix 17 — reported by several training providers; not mentioned in the IET press release, so confirm against the book before citing it
- Existing installations: an installation complying with an earlier edition is not thereby unsafe and does not have to be upgraded — the 18th Edition's own preface position, repeated by the IET and SELECT for A4
- Landlord duty (England): the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 — now extended to social housing — still require remedial or further investigative work identified on an EICR to be completed within 28 days or any shorter period stated in the report; the GOV.UK guidance (November 2025) still describes FI as "further investigation required without delay", so landlords should continue to treat FI as a 28-day item regardless of the softened wording on the new form
Quick Reference Table
Quoting an electrical job? Describe the work and squote handles the pricing.
Try squote free →| Area | Before A4 (A2:2022 + A3:2024) | After A4:2026 |
|---|---|---|
| Edition to cite on certificates | BS 7671:2018+A2:2022 (with A3:2024) | BS 7671:2018+A4:2026 |
| Battery energy storage | Scattered requirements; Reg 530.3.201 (A3) on bidirectional devices | New dedicated chapter; battery treated as a generating set; bidirectional protection in 551.7.1 |
| Power over Ethernet | Not specifically covered | New Section 716; 60 V / 15 V ripple-free DC limits; BS ISO/IEC 11801-1 cabling |
| ICT functional earthing | General requirements only | New section on functional earthing and bonding for ICT systems |
| Medical locations (710) | 2018 text | Rewritten; Groups 0/1/2; medical IT systems, IMD, dual supplies, UPS |
| EICR observation codes | Single observations table; C3 and FI listed with C1/C2 | Two tables: C1/C2 (unsatisfactory) and C3/FI (not unsatisfactory) |
| FI wording | "Further investigation required without delay" | "Further investigation" — for items outside the agreed extent/limitations |
| Signatures | One signature block | Separate inspector and authoriser blocks |
| Earthing options on forms | TN-C, TN-S, TN-C-S, TT, IT | TN-C, TN-S, TN-C-S (PME), TN-C-S (PNB), TT, IT |
| Buried cable ratings | Single buried rating | Direct-buried vs in-duct ratings |
| Photos on EICR | Not provided for on model form | May be attached to support observations |
| Recipient guidance with EICR | Shorter list | 15 items including six-monthly RCD/AFDD test-button checks and SPD indicator check |
| Energy efficiency | Appendix 17 (informative) | Chapter 81 |
Detailed Guidance
Dates, editions and what to put on the certificate
The amendment was published on 15 April 2026 and could be used from that day. The IET and BSI gave a six-month coexistence period during which either edition was acceptable, so that work designed and priced before April could be finished under the edition it was designed to. That period ended on 15 October 2026 with the withdrawal of BS 7671:2018+A2:2022 and the free-standing A3:2024.
Practical consequences:
- New certificates from 15 October 2026 cite BS 7671:2018+A4:2026. Scheme model forms have been updated; if your software or pads still show A2:2022, update them.
- Jobs that straddled the date: if the installation was designed and installed to A2/A3 and completed before 15 October, certifying to A2/A3 was correct. Work completed after that date is certified to A4, and where a design was to A2/A3 you should note any departures in the "Comments on existing installation" or departures box and confirm they do not reduce safety.
- EICRs are reports on an existing installation against the current edition. An installation wired to the 17th Edition or to A2:2022 is inspected against A4, and non-compliance with the current edition that does not affect safety is recorded as C3 (improvement recommended) — exactly as before. A4 does not create new C2s on old installations by itself.
Stationary secondary batteries — the new chapter
Home battery storage has gone from niche to routine, and the Amendment 3 fix (Regulation 530.3.201, requiring RCDs, RCBOs and other protective devices in prosumer installations to be suitable for bidirectional current) was a stop-gap. A4 adds a full chapter covering:
- System design — how the battery, inverter, PV and the consumer's installation relate; where the point of connection sits; what the battery is treated as. The important conceptual change is that a battery is a source and the installation is treated as having a generating set, so the Section 551 rules on generating sets apply, not just the rules for a fixed load.
- Power conversion equipment — bidirectional and hybrid inverters, and the protective devices either side of them. Protection must work for fault current from both directions, and a source must not be connected on the load side of a unidirectional RCD.
- Vehicle-to-home and vehicle-to-grid — an EV used as a battery is now within scope. Combine this with the existing Section 722 requirements for EV charging (see bs 7671 ev wiring requirements and vehicle to grid v2g explained).
- Location, ventilation and fire risk — battery location (not in escape routes, not in certain ceiling or roof spaces without mitigation), ventilation for off-gassing, separation from combustibles, and fire-risk mitigation. This dovetails with PAS 63100:2024 (fire safety of battery storage in dwellings), which many installers already specify to; see battery storage safety standards guide and solar battery storage installation.
On site, the two changes most domestic installers will meet are (1) the EIC Schedule of Inspections now has a row for a prosumer's low voltage installation, so you are expected to have inspected the battery/inverter arrangement as part of the certificate, and (2) the earthing arrangement box distinguishes PME from PNB.
Section 716 — Power over Ethernet
A new special location in Part 7 for installations where structured data cabling (Cat 5e/6/6A) carries extra-low-voltage DC to equipment — PoE lighting, access control, sensors, Wi-Fi access points, cameras. The section:
- treats the supply as SELV or PELV and sets voltage limits of 60 V ripple-free DC in dry locations and 15 V ripple-free DC in other locations (lower than the general 120 V ripple-free DC SELV/PELV limit in Part 4, because of the small conductors and connectors involved);
- requires cabling and connectors to BS ISO/IEC 11801-1 and able to carry 750 mA per contact continuously;
- addresses bundling and heating of many PoE cables in a tray (the thermal issue that has caused real fires in large PoE deployments).
Electricians who install data cabling alongside power — see data cabling and smart home cabling — now have a section of BS 7671 that applies to it when the cabling is delivering power.
Functional earthing and bonding for ICT
Data centres, server rooms and increasingly smart buildings use functional earthing (for signal reference and EMC) that is separate from the protective earthing required for shock protection. The new section sets out how functional earthing conductors and functional equipotential bonding are arranged, how they relate to the protective earthing system, and how they are identified. Table 51 now includes functional bonding conductors and combined protective-and-functional conductors, and a conductor used only for functional bonding must not be marked as a protective conductor. Most domestic electricians will not meet this; commercial and data-cabling contractors will.
Section 710 — Medical locations
A complete rewrite aligning with IEC 60364-7-710:2021. Medical locations are classified by the risk to the patient of a loss of supply or of a fault:
| Group | Typical locations | Key requirements |
|---|---|---|
| Group 0 | Consulting rooms, offices in a surgery where no applied parts are used | General BS 7671 requirements |
| Group 1 | Treatment rooms, wards, dental surgeries, physiotherapy, where applied parts are used externally or invasively but not in a way where loss of supply endangers life | Supplementary equipotential bonding, RCD requirements, specified changeover times |
| Group 2 | Operating theatres, ICU, cardiac catheterisation, where loss of supply or a first fault could endanger life | Medical IT system via isolating transformer with insulation monitoring device (IMD); two independent supplies; UPS located as close as practicable to the equipment; stringent bonding and changeover times |
Dental practices, GP surgeries, vets and private clinics are the places a general electrical contractor meets Section 710. The practice manager will not know what Group their rooms are; the designer has to classify them with the clinical lead.
Appendix 6 — the new EICR
The change the whole trade will notice first. The model EICR form has been redrafted:
- Two observation tables in Section K. The first lists C1 (danger present) and C2 (potentially dangerous) observations; any entry here makes the overall assessment unsatisfactory. The second lists C3 (improvement recommended) and FI (further investigation) observations; entries here do not make the report unsatisfactory. FI items must still be considered and acted on, but they no longer automatically fail the installation.
- FI redefined. FI is for matters the inspector could not verify within the agreed extent and limitations of the inspection — not a catch-all for anything the inspector did not have time to look at. The previous "without delay" wording has gone from the form.
- Photographs. The form provides for photographic or thermographic images to be attached in support of observations, which scheme assessors have been asking for.
- Two signatures. The person who carried out the inspection and testing signs, and the person who authorised (reviewed and issued) the report signs. For a sole trader this is the same person twice; for a firm it formalises the review step.
- Scope note. An EICR is not the document for a consumer unit or distribution board replacement — that is an EIC. Some contractors had been issuing an EICR with a "CU replaced" comment; the form now says not to.
- Intake equipment. On the schedule of inspection, an outcome for intake equipment other than access to live parts should not determine the overall outcome — so a cracked cut-out fuse carrier (DNO property) is recorded and reported to the DNO, but it is not what fails the report.
- Recipient guidance. Fifteen points now accompany the report, including six-monthly RCD and AFDD test-button checks and an SPD status indicator check. Give the sheet to the client; it is part of the report.
For landlords in England, note the mismatch flagged above: the 2020 Regulations and the GOV.UK guidance still treat FI as requiring action within 28 days, so advise landlord clients not to read the softened form wording as "optional". See electrical safety standards private rented sector and landlord certificates.
Earthing arrangements — PME versus PNB
The model forms now split TN-C-S into PME (protective multiple earthing — the ordinary DNO supply where the neutral is earthed at multiple points) and PNB (protective neutral bonding — where the supply neutral is earthed at one point only, typically on a private network or a single-transformer multiple-source arrangement). Regulation 312.2.1.1 and new Figure 3.9B describe PNB. For a normal domestic DNO supply you will still tick PME. You are more likely to meet PNB on a farm, a private estate network or a site with its own transformer. The distinction matters because the open-PEN risk mitigations required for EV charging (Regulation 722.411.4.1) and the limits on exporting a PME earth to outbuildings depend on the actual arrangement — see tncs earthing pme and pme earthing ev charging.
Buried cables — revised Appendix 4 tables
The current-carrying capacity tables for buried cables now distinguish a cable in direct contact with the soil from a cable in a buried duct or conduit, with different ratings. Every SWA run to a garage, garden office or EV charger is affected: a 6 mm² or 10 mm² SWA in a duct may no longer carry what the previous single buried figure allowed. Re-check standard designs rather than relying on a remembered figure. See armoured cable, swa cable glanding and termination and garden room electrical supply sizing.
What has not changed
- No new RCD type requirements beyond the A2 position (Type AC not to be used for new installations; Type A minimum; Type B for certain EV and inverter loads) — see rcd types explained
- AFDD recommendations (Regulation 421.1.7) unchanged from A2 — see afdd requirements
- SPD requirements (Section 443 and 534) unchanged in substance — see spd surge protection
- Part P notification requirements are a Building Regulations matter and are unaffected — see part p notifiable work
- Maximum Zs values and the test methods in Part 6 are unchanged in substance — see maximum zs values and testing
Frequently Asked Questions
Do I have to bring an installation certified to A2:2022 up to A4?
No. The 18th Edition's own preface states that installations complying with earlier editions are not necessarily unsafe for continued use or in need of upgrading. A4 does not change that. If you inspect such an installation, record non-compliance with the current edition that does not affect safety as C3, and only code C1 or C2 where there is actual danger or potential danger. SELECT and the IET have both restated this for A4.
What happens to a C3 on an EICR now — has it been downgraded?
The classification has not changed; what changed is the form. A C3 ("improvement recommended") never made a report unsatisfactory, but on the old single-table form it sat alongside C1 and C2 and was often misread by landlords and agents as a fail item. The new form puts C3 and FI in a separate table so the overall assessment is clearly driven by C1 and C2 only. The recommendation to the client is the same as it ever was.
I have a brown book with the A3 corrigendum tucked inside — can I keep using it?
Not for new work after 15 October 2026. A3 is incorporated into the A4 text and A2:2022 is withdrawn. You need the A4 book (or a current subscription to the IET's online version) and your certificates should cite BS 7671:2018+A4:2026. Scheme assessors will check the edition cited on sampled certificates.
Does Amendment 4 change what I need for a domestic battery or solar installation?
In substance it formalises what good installers were already doing: protection suitable for bidirectional current, the battery treated as a generating set under Section 551, location and ventilation requirements and fire-risk mitigation consistent with PAS 63100:2024, and a prosumer row on the EIC schedule of inspections. If you have been installing to Amendment 3 plus PAS 63100 and the manufacturer's instructions, the transition is paperwork and checking the new chapter's wording rather than redesign. Confirm the exact chapter and regulation numbers from the book before quoting them on a certificate.
Is there a new 18th Edition qualification?
Awarding bodies (City & Guilds 2382, EAL) issue an updated 18th Edition requirements qualification for each amendment. Most scheme operators expect at least one qualifying supervisor per firm to hold the current-amendment qualification or to have completed an approved update. Check your scheme's current rule; it is a scheme requirement, not a statutory one.
Regulations & Standards
BS 7671:2018+A4:2026 — Requirements for Electrical Installations, IET Wiring Regulations, 18th Edition incorporating Amendment 4 (published 15 April 2026; previous edition withdrawn 15 October 2026)
BS 7671:2018+A2:2022 and Amendment 3:2024 — superseded editions; A3 (Regulation 530.3.201, bidirectional protective devices) now incorporated into A4
IEC 60364-7-710:2021 — medical locations; the basis of the revised Section 710
BS ISO/IEC 11801-1 — generic cabling for customer premises; referenced by new Section 716 for PoE cabling and connectors
PAS 63100:2024 — fire safety of electrical energy storage systems in dwellings; complements the new battery chapter
Building Regulations Approved Document P (England) — electrical safety in dwellings; notification requirements unchanged by A4
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 — five-yearly EICR and 28-day remedial duty; now extended to social housing
Electricity at Work Regulations 1989 — duty to maintain systems to prevent danger; BS 7671 is the recognised means of compliance
BS EN 61557 series — test equipment for verification to Part 6
IET Guidance Notes 1–8 and IET On-Site Guide — updated for A4
IET press release — IET & BSI officially publish Amendment 4 (2026) to BS 7671:2018 — official announcement with the headline technical changes
IET — BS 7671 Wiring Regulations — purchase and subscription for the current edition
BSI Knowledge — BS 7671:2018+A4:2026 — standard purchase
NAPIT — statement welcoming Amendment 4 (2026) — scheme-provider position
EAL — BS 7671 Amendment 4 (2026): key changes explained — awarding body summary
GOV.UK — Electrical safety standards in the private rented sector: guidance for landlords — 28-day remedial duty and FI treatment
wiring regs overview — the 18th Edition structure and how amendments work
test and inspection procedures — EICR and EIC process to Part 6
inspection checklist — schedule of inspections items
battery storage safety standards guide — PAS 63100 and battery location requirements
solar battery storage installation — battery installation practice
bs 7671 ev wiring requirements — Section 722 and open-PEN protection
vehicle to grid v2g explained — bidirectional EV charging
tncs earthing pme — PME earthing and its limits
rcd types explained — RCD types unchanged by A4
armoured cable — SWA runs affected by the revised buried-cable tables
electrical safety standards private rented sector — landlord EICR duties in England