Summary

Supplementary bonding was once the signature of a bathroom installation: green-and-yellow 4 mm² looped from the bath taps to the radiator to the basin pipes to the towel rail. Since the 17th Edition (BS 7671:2008) it has been permissible to leave it out in most new bathrooms, and the 18th Edition and its four amendments have kept that position. The result is two decades of confusion on site. Some electricians still bond everything; some bond nothing; many customers have been told by one tradesperson that the bonding "must be ripped out" and by the next that its absence is a fail. Both are wrong unless the conditions have actually been checked.

The logic of the regulation is simple. Supplementary bonding exists to limit the touch voltage between two pieces of metal a person might hold at the same time while wet, during the time it takes a protective device to clear a fault. If every circuit in the room will disconnect fast, every circuit has a 30 mA RCD to catch a fault before it reaches a dangerous level, and every piece of extraneous metal is already tied to the main earthing terminal by the main bonding, then the extra local bonding adds nothing. If any one of those protections is missing, it does. The decision is therefore a test and a check of the installation, not an opinion, and it has to be made room by room.

This article explains the three conditions and how to verify each, how to decide which metalwork is actually extraneous (plastic plumbing has changed the answer in most modern bathrooms), the conductor sizes and resistance test when bonding is required, what to do with existing bonding, and how to code the findings on a condition report. For the broader earthing and bonding picture see earthing and bonding; for the zones and equipment rules in the same room see bathroom zones and ip ratings.

Key Facts

Quick Reference Table

Quoting an electrical job? Describe the work and squote handles the pricing.

Try squote free →
Situation found in the bathroom Condition 1 (disconnection) Condition 2 (30 mA RCD all circuits) Condition 3 (main bonding) Supplementary bonding
Modern all-RCBO board, main bonding present, plastic plumbing Met Met Met (or no extraneous parts) Not required
Dual-RCD board, all bathroom circuits on RCD sides, main bonding OK Met Met Met Not required
Shower on RCD, lighting on non-RCD side of split board Met NOT met Met Required
Old rewireable fuse board, no RCD Likely met for MCB/fuse Zs NOT met Check Required
TT supply, all circuits RCD-protected, main bonding OK Met (0.2 s via RCD) Met Met Not required
No main bonding to incoming metal water pipe — — NOT met Required, and main bonding is a C2
Zs too high on lighting circuit (Type B 6 A, no RCD) NOT met NOT met — Required; also fix the circuit
All conditions met, old bonding still fitted Met Met Met May remain; not a defect
Metal bath on copper supply and metal waste, all RCD, main bonding OK Met Met Met Not required (bath is extraneous but main-bonded path exists)
Towel rail on plastic pipe, no electrical connection — — — Not extraneous; no bonding needed to it
Electric shower (Class I) and metal radiator on copper from boiler Met Met Met Not required; both already earthed/bonded

Detailed Guidance

Why the regulation allows omission

A fault on a Class I appliance in the bathroom, say a shower with a line-to-earth fault, raises the shower casing and its CPC to some fraction of the supply voltage until the protective device clears the fault. The person standing in the tray touching the shower and the metal tap could be exposed to the difference between the shower CPC potential and the tap's potential. Supplementary bonding pulls those two potentials together locally, so even during the fault the voltage between them is small. The three conditions remove the need for that: fast disconnection (Condition 1) limits the duration; a 30 mA RCD (Condition 2) disconnects at a current far too small to raise the CPC potential significantly and protects against the worst case of a person forming part of the fault path; and main bonding (Condition 3) keeps the extraneous metal at earth potential in the first place. Remove any one and the risk the bonding was designed for comes back.

Verifying Condition 1: disconnection times

For each final circuit that serves or passes through the room, confirm the protective device will disconnect within 0.4 s (TN) or 0.2 s (TT) under an earth fault. Where the circuit has a 30 mA RCD, the RCD itself provides the disconnection time (an RCD to BS EN 61008 or 61009 trips within 300 ms at IΔn and 40 ms at 5 IΔn) and Condition 1 is satisfied through the RCD. Where a circuit relies on the MCB or fuse alone, measure Zs at the furthest point and compare it with the maximum Zs for that device in Tables 41.2 to 41.4 of BS 7671, applying the 0.8 correction factor for conductor temperature if comparing against the tabulated values measured cold (GN3 gives the corrected figures). A circuit that fails its Zs fails Condition 1 regardless of anything else, and is a defect in its own right. See maximum zs values and testing.

Verifying Condition 2: 30 mA RCD on every circuit

List every circuit in the room, not just the obvious ones. Typical candidates: electric shower, lighting (which may be a landing or whole-floor circuit), extract fan (often off the lighting circuit, sometimes its own), shaver supply unit (fed from the lighting circuit), electric towel rail or radiator (socket circuit via an FCU, or its own circuit), electric underfloor heating, heated mirror or demister pad, bathroom cabinet with lighting, any socket outlet circuit whose cables pass through the room even if there are no sockets in it, and SELV transformers for LED lighting (the 230 V primary circuit counts). Each must be protected by a 30 mA RCD or RCBO. Test the RCD at IΔn and 5 IΔn and record the trip times. A circuit protected by a 100 mA RCD, or by a 30 mA RCD fitted downstream only to the shower but not to the lights, does not satisfy Condition 2 for the room.

Verifying Condition 3: main bonding

Check at the main earthing terminal that the incoming metallic water service, gas service, oil line and any other extraneous service and structural steel are main-bonded with conductors of the correct size (10 mm² minimum on a TN-C-S/PME supply under Regulation 544.1.1; otherwise not less than half the earthing conductor with a 6 mm² minimum), connected within 600 mm of the meter or point of entry on the consumer's side, with BS 951 clamps and labels. Test continuity from the MET to each bonded service. Where the incoming water and gas are plastic there may be no extraneous services to bond, and Condition 3 is met because there are no extraneous-conductive-parts to connect; record that finding. Where a metal service enters the building and is not bonded, Condition 3 fails: supplementary bonding is required in the bathroom and the missing main bonding is coded C2 and must be fixed. See tncs earthing pme for the PME sizing rules.

Deciding what is extraneous in the room

Modern plumbing has changed this part of the job. A bathroom plumbed in plastic push-fit with chrome tails at each fitting has metal taps and a metal towel rail that are electrically isolated from earth and from each other: they cannot introduce a potential and are not extraneous-conductive-parts. Bonding them achieves nothing and, in theory, introduces earth potential onto isolated metal.

Test rather than assume. With the installation isolated, measure the resistance between the metal part and the main earthing terminal (a long lead to the MET, or to a confirmed CPC at a local accessory, with a low-resistance ohmmeter on a high range or an insulation tester at a low voltage). IET Guidance Note 8 gives about 22 kΩ as the threshold: below it the part is treated as extraneous; above it, it is not. A copper pipe system fed from a copper rising main will read very low (it is extraneous, but it is also already connected to the main bonding, which is exactly what Condition 3 checks). A radiator on copper from a boiler elsewhere in the house is extraneous. A metal bath with a plastic waste and plastic supplies will usually read open. Metal window frames and door architraves are not treated as extraneous unless connected to the building's structural steel (Regulation 701.415.2 says so explicitly).

Installing supplementary bonding where it is required

  1. Identify every exposed-conductive-part (Class I equipment: shower, towel rail, fan, light fittings) and every extraneous-conductive-part (metal pipes to taps and radiators, metal waste pipes, metal bath or tray connected to earth, structural metal).
  2. Run 4 mm² single-core green-and-yellow (or 2.5 mm² where the conductor is sheathed or enclosed throughout) between the CPC terminal of each circuit (typically at the shower isolator, the fan, the light fitting or a junction box feeding them) and each extraneous part. A common method is a bonding terminal block under the bath or in the airing cupboard with each part connected to it, so there is one accessible point of inspection.
  3. Fix BS 951 clamps on cleaned bare metal, tightened so the conductor cannot pull out, each with the warning label. Where pipes are chromed or painted, clean a small section back to bare metal at the clamp position.
  4. Keep connections accessible: behind a removable bath panel, in an airing cupboard, at a cabinet, not plastered in.
  5. Test. Measure the resistance between each pair of simultaneously accessible exposed and extraneous parts with a low-resistance ohmmeter and confirm R ≤ 50 V ÷ Ia for the protective device of the circuit concerned. Record the values. Direct 4 mm² runs of a few metres read 0.01–0.05 Ω.
  6. Record on the certificate (EIC or Minor Works) that supplementary bonding has been installed and tested, and why (which of the three conditions is not met).

Do not rely on a run of copper pipe as the bonding conductor without testing it end to end; a single push-fit or pressed plastic-bodied fitting in the run breaks the path, and a soldered or compression joint can read high with age.

Existing bonding when the conditions are now met

A consumer unit upgrade to an all-RCBO board very often satisfies Condition 2 for the first time in a 1980s house, with Conditions 1 and 3 already met. The old supplementary bonding is now surplus, but it is not a defect and there is no requirement to remove it. The usual advice is to leave it in place unless it is damaged, incorrectly connected or in the way of the work. Where it is removed during a refurbishment and the conditions are confirmed met, record on the certificate that supplementary bonding is not required under Regulation 701.415.2 and state the verification done. If bonding is found connected to a non-extraneous part (an isolated towel rail on plastic pipe), it is harmless but unnecessary; it is not a code.

Coding on an EICR

Electrical Safety First Best Practice Guide 4 gives the agreed codes. No supplementary bonding in a bathroom where the conditions for omission are not met: C2. Bathroom circuits without 30 mA RCD protection: C2. Main bonding absent to an incoming metallic service: C2. Supplementary bonding present but of inadequate size or with a resistance exceeding the Regulation 415.2.2 limit: C2 where it is relied upon (conditions for omission not met), C3 or no code where it is surplus. Supplementary bonding to parts that are not extraneous: not a defect. Where the inspector cannot determine whether a part is extraneous or whether bonding exists behind finishes, a limitation is recorded and the item may be FI. See eicr codes c1 c2 c3 fi explained.

Frequently Asked Questions

My customer's new bathroom has all plastic pipes. Does anything need bonding?

If the taps, radiator and towel rail are fed entirely by plastic and nothing metallic in the room is connected to earth elsewhere, there are no extraneous-conductive-parts to bond and the question does not arise, whatever the state of the RCDs. Confirm it with the resistance test to the MET: an open reading above about 22 kΩ means the part is not extraneous. Class I equipment (shower, fan, towel rail) is earthed through its own CPC. The circuits in the room still need 30 mA RCD protection for their own sake under Regulation 701.411.3.3, but that is a separate requirement from bonding.

The shower is RCD protected but the lights are not. Is the bathroom compliant?

No, on two counts. Condition 2 requires every final circuit in the room to have 30 mA additional protection, so the bathroom does not qualify for omission of supplementary bonding and bonding is required. Separately, Regulation 701.411.3.3 requires 30 mA additional protection for all low-voltage circuits serving or passing through the location, so the unprotected lighting circuit is itself a C2 on a condition report. The practical fix is an RCBO on the lighting circuit, which resolves both.

Do I have to remove the old bonding now the board has RCBOs?

No. Once the three conditions are met the bonding is not required, but its presence is not a defect and nothing in BS 7671 asks for it to be removed. Leave it unless it is damaged or in the way. If it is removed as part of a refit, record on the certificate that the conditions of Regulation 701.415.2 were verified.

Is a metal bath an extraneous-conductive-part?

Only if it is connected to earth through something: a copper supply, a metal waste, or contact with structural metal. A pressed steel bath on copper hot and cold supplies and a copper waste reads low to the MET and is extraneous; it is also already connected to the main bonding through those pipes, so where Conditions 1 to 3 are met nothing more is needed. The same bath on plastic supplies and a plastic waste reads open and is not extraneous. Acrylic baths are not conductive at all, though their metal cradle may be if it touches pipework.

What size cable is supplementary bonding?

4 mm² copper where it is not mechanically protected (the usual single-core green-and-yellow clipped under a bath), 2.5 mm² where it is sheathed or in conduit throughout, for connections between extraneous parts. Between an exposed-conductive-part and an extraneous part, not less than half the CPC of the circuit; between two exposed parts, not less than the smaller CPC. In practice 4 mm² covers every case in a domestic bathroom and avoids the argument.

Regulations & Standards