Bathroom Waterproofing and Tanking: When Is It Required and How to Do It

Quick Answer: Since the 2018 revision of BS 5385-1 (clause 6.1.1.3), all substrates in wet areas -- including domestic showers, bath surrounds, and wet rooms -- must be waterproofed with a suitable proprietary tanking membrane system before tiling. Tiles and cementitious grout alone are water-resistant, not waterproof, and will allow moisture to penetrate the substrate over time. The January 2025 NHBC Standards update reinforces this for new-build homes, mandating EAD-certified tanking systems for wet rooms and any shower with a flow rate above 12 litres per minute.

Summary

Tanking is the process of applying a continuous waterproof membrane to walls and floors before tiling, creating a sealed envelope that prevents water reaching the substrate. BS 5385-1:2018 moved tanking from a recommendation to a requirement for all wet areas in both domestic and commercial settings, recognising that cementitious adhesives and grouts are only water-resistant -- they slow moisture penetration but do not stop it. Two main system types exist: liquid-applied membranes (painted or rolled on in two coats) and sheet membranes (bonded to the substrate with tile adhesive). The choice between them depends on the substrate, project timeline, and installation environment. Getting waterproofing wrong is one of the most expensive mistakes in bathroom fitting -- failures typically remain hidden until water damage to joists, ceilings, and adjacent rooms forces a complete strip-out.

Key Facts

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →

Detailed Guidance

When is tanking required vs recommended?

BS 5385-1:2018 makes waterproofing a requirement for all wet areas. The NHBC Standards 2025 add specific enforcement tiers for new-build homes:

Scenario Tanking Status Standard/Regulation
Wet room (no tray, tiled floor to drain) Mandatory -- full EAD-certified system BS 5385-1:2018, NHBC 2025
Walk-in shower without tray Mandatory -- full EAD-certified system BS 5385-1:2018, NHBC 2025
Shower enclosure with tray, flow rate >12 L/min Mandatory -- full EAD-certified system NHBC 2025
Shower enclosure with tray, flow rate ≤12 L/min Required (waterproof adhesive + grout + water-resistant substrate acceptable as minimum under NHBC) BS 5385-1:2018, NHBC 2025
Bath surround (tiled walls) Required by BS 5385-1; NHBC permits waterproof adhesive + grout on water-resistant substrate BS 5385-1:2018
Bathroom floor (no shower drain) Recommended -- protects against splashes and overflows Best practice
Kitchen splashback Not required --

Key distinction: The NHBC 2025 revision allows a lighter-touch approach for low-flow showers (≤12 L/min) in new builds -- waterproof tile adhesive and grout on a water-resistant backing board, with a preformed or adhered upstand at the perimeter. However, BS 5385-1:2018 itself does not make this distinction and recommends full tanking for all wet areas. Professional best practice remains full tanking for any area that will receive regular water exposure.

What tanking systems are available?

There are two fundamental categories: liquid-applied membranes and sheet membranes. Many professional installers use a combination -- liquid on walls, sheet on floors -- to get the best of both systems.

Liquid-Applied Membranes

Applied by brush, roller, or trowel in two coats at right angles to each other. The combined dry film thickness must reach at least 1mm. Reinforcing tape is embedded in the first coat at all junctions, corners, and penetrations.

Product Manufacturer Coats Tile-Ready Time EAD Certified Notes
Mapelastic AquaDefense Mapei 2 4 hours Yes Rapid-drying, blue-to-green colour change indicates cure. Kit includes Mapeband PE 120 tape
BAL Waterproof 1C BAL 1 2 hours Yes (ETA-24/1129) Only single-coat EAD-certified system on UK market. Apply by brush, roller, or 4mm notched trowel
Aquaseal Wet Room Membrane Sika/Everbuild 2 12 hours (min 6 between coats) Check current status Budget-friendly, widely stocked. Non-hazardous, solvent-free
ARDEX WPC ARDEX 2 90 minutes Yes Fastest cure time. Kit includes roller sleeve and scrim tape
Weber SYS Protect Weber 2 4-6 hours Yes Part of a complete tanking kit system
Laticrete Hydro Ban Laticrete 2 4-6 hours Yes Thin-film application, crack-bridging. Popular in commercial spec

Sheet Membranes

Pre-manufactured waterproof sheets bonded to the substrate with tile adhesive or proprietary bonding compound. Tiles can typically be fixed directly over the membrane once the bonding adhesive has set.

Product Manufacturer Thickness Tile-Ready Time Notes
Schluter KERDI 200 Schluter-Systems 0.2mm polyethylene As soon as bonding adhesive sets Fleece-webbing both sides anchors in thin-set. Lifespan 40+ years. Industry standard for shower enclosures
Schluter KERDI-BOARD Schluter-Systems 5-50mm Immediate (substrate + membrane in one) Combined waterproof backer board. Eliminates separate tanking step
Wedi Building Board Wedi 4-60mm Immediate (substrate + membrane in one) XPS foam core, cement-coated. Fully waterproof, load-bearing. Excellent for creating niches and shelves
Tilesure CCL Wetrooms 1.4mm butyl-based Immediate once bonded Designed specifically for wet room floors on timber. 11dB acoustic improvement. Fast-track -- no drying time
Screedsure CCL Wetrooms 1mm butyl-based Immediate once bonded For concrete/screeded wet room floors
Impey WaterGuard Impey 0.2mm polypropylene As soon as adhesive sets Specifically designed for Impey wet room systems

Comparison: Liquid vs Sheet

Factor Liquid Membrane Sheet Membrane
Speed 90 mins to 12 hours drying between coats/before tiling Tile as soon as bonding adhesive sets (often same day)
Ease of use Simple -- brush or roller, minimal training Requires careful cutting and lapping at joints
Complex shapes Excellent -- conforms to any geometry Difficult around pipes, niches, curves
Floor suitability Good, but must not be walked on during cure Excellent -- immediate foot traffic once bonded
Timber substrates Adequate with flexible membrane Preferred -- sheet bridges timber movement better
Consistency Depends on application thickness (operator skill) Factory-controlled, consistent thickness
Acoustic benefit None Some sheet systems (e.g. Tilesure) add 11dB sound insulation
Lifespan 25-30 years when protected by tiles 40+ years for quality systems (Schluter KERDI)
Cost (materials) Lower per m2 Higher per m2, but faster installation may offset labour

How do I tank a wet room?

Wet rooms demand the highest standard of waterproofing because the entire floor is the shower tray. Every surface that could receive water must be sealed into a continuous, bonded envelope.

Prerequisites

Step-by-Step Procedure (Liquid Membrane System)

Step 1: Prime the substrate Apply the manufacturer's recommended primer to all surfaces. This ensures proper adhesion of the membrane to the substrate. Allow primer to dry fully (typically 1 hour). Both absorbent and non-absorbent substrates need priming -- do not skip this step.

Step 2: Apply tanking tape to all junctions Bed reinforcing tanking tape (e.g. Mapeband PE 120, BAL Waterproof 1C Tape) into a coat of membrane at:

The tape must overlap at corners by a minimum of 50mm. Use manufacturer-specific drain collars where available.

Step 3: Apply the first coat of membrane Using a brush or long-pile roller, apply the first coat with horizontal strokes across all primed surfaces -- floor and walls. Ensure full, even coverage with no pinholes or thin spots. The coat should be approximately 0.5mm thick.

Coverage area for walls: apply membrane to all walls within the wet room to a minimum height of 1800mm from finished floor level. Best practice for a wet room is full floor-to-ceiling coverage on all walls.

Step 4: Allow first coat to dry Drying times vary by product:

Do not force-dry with heat guns. Maintain adequate ventilation. Do not allow foot traffic during cure.

Step 5: Apply the second coat Apply the second coat with vertical strokes (perpendicular to the first coat). This cross-hatch pattern ensures complete coverage and eliminates any missed areas. The combined dry film thickness of both coats must be at least 1mm.

Step 6: Allow full cure before tiling

Step 7: Flood test (best practice) Temporarily seal the drain and fill the wet room floor with 10-20mm of water. Leave for 24 hours. Check the ceiling below and all perimeter edges for any signs of moisture. If the test fails, identify and repair the breach before proceeding.

Step 8: Tile Use a C2 S1 (minimum) adhesive applied with full bed coverage -- no dot-and-dab. Fix tiles working from the drain outwards. Grout with CG2 WA minimum for wet room floors.

How do I waterproof a standard shower area?

Standard shower enclosures with a tray require less intensive treatment than wet rooms, but tanking is still required under BS 5385-1:2018.

Height and Coverage Requirements

Procedure

  1. Prepare substrate -- remove any loose material, fill voids, ensure surfaces are flat and dry. Cement backer board (e.g. Hardiebacker 12mm, Wedi board 12.5mm) is the preferred substrate for shower walls. Plasterboard is acceptable if tanked, but moisture-resistant (green) board is strongly recommended
  2. Prime as per manufacturer's instructions
  3. Apply tanking tape to all internal corners, floor-wall junction within the shower zone, around the shower valve penetration, and any pipe entries
  4. Apply membrane in two coats as described above. One coat if using BAL Waterproof 1C
  5. Allow full cure before tiling
  6. Tile with full-bed adhesive -- C2 S1 minimum. Never dot-and-dab in wet areas
  7. Grout with CG2 WA and seal the perimeter joint between tiles and shower tray/bath with a flexible silicone sealant (not grout)

Critical Detail: The Perimeter Seal

The junction between the shower tray and wall tiles must be sealed with a flexible silicone sealant, not grout. Grout at this junction will crack as the tray flexes under load, breaking the waterproof envelope. Use a mould-resistant sanitary silicone (e.g. Mapei Mapesil AC, Sika Sanisil, Dow Corning 785).

What are the common failures from inadequate waterproofing?

Waterproofing failures are among the most costly defects in bathroom installations because the damage is often extensive before it becomes visible. Here are the most common failure modes:

1. Water tracking through grout joints Cementitious grout is porous. In a shower used twice daily, moisture steadily penetrates the grout, saturates the adhesive bed, and reaches the substrate. On plasterboard, this causes swelling, delamination, and mould growth. On timber, it causes rot. This process can take 6-18 months to become visible, by which time structural damage may be significant.

2. Dot-and-dab adhesive voids Tiles fixed with adhesive dabs rather than full-bed coverage create voids behind the tile. Water entering through grout collects in these voids, creating reservoirs of standing water against the substrate. This accelerates substrate degradation and provides an ideal environment for mould.

3. Failed corner and junction seals If tanking tape is omitted or poorly applied at internal corners and floor-wall junctions, these high-stress points become the first breach in the waterproof envelope. Water follows gravity to the lowest point of failure, often appearing as damp on the ceiling below -- sometimes metres from the actual breach.

4. Insufficient membrane thickness Applying liquid membrane too thinly (under 1mm combined dry film thickness) results in pinholes and weak spots. A single pinhole in a shower floor can allow enough water through to cause mould on the ceiling below within weeks.

5. Tiling before full cure Tiling over membrane that has not fully cured traps moisture and prevents the membrane from achieving its full bond and waterproofing performance. This is especially common with liquid systems that have longer cure times (e.g. Sika Aquaseal at 12 hours).

6. No tanking behind bath A common shortcut. The bath surround gets tiled but not tanked, on the assumption that the bath itself catches all water. In practice, splash from showering over the bath, condensation, and water running down tiles behind the bath lip all reach the substrate. Over years, this rots timber framing and causes damp in adjacent rooms.

7. Timber substrate movement cracking the membrane Liquid membranes on insufficiently rigid timber floors can crack as the timber deflects under foot traffic. Sheet membranes (e.g. Tilesure, Schluter KERDI) are better at bridging movement on timber substrates.

Typical remediation cost: A failed shower waterproofing in a first-floor bathroom can easily cost GBP 3,000-8,000+ to remediate once you factor in stripping tiles, replacing damaged plasterboard or timber, re-tanking, re-tiling, and repairing the ceiling below. Prevention (proper tanking) adds GBP 150-400 in materials to the original installation.

Does a wet room need Building Control approval?

The answer depends on the scope of work:

Building Control notification is NOT typically required when:

Building Control notification IS required when:

Drainage Requirements (Building Regulations Part H)

Competent Person Schemes

A plumber registered with a competent person scheme (e.g. APHC, CIPHE, or a multi-trade scheme like NAPIT) can self-certify notifiable plumbing work without separate Building Control involvement. This covers most wet room drainage installations in existing dwellings.

Frequently Asked Questions

Can I tile a shower without tanking?

Technically the tiles will go on, but you should not. BS 5385-1:2018 requires waterproofing of all wet area substrates before tiling. Even if you are not bound by NHBC standards (i.e. it is not a new build), omitting tanking in a shower is a failure waiting to happen. Cementitious grout absorbs water -- it is a matter of when, not if, moisture reaches the substrate. The cost of tanking materials (GBP 50-150 for a standard shower) is trivial compared to the cost of failure.

How long does tanking membrane last?

Quality liquid membranes last 25-30 years when properly applied and protected by tiles. Sheet membrane systems such as Schluter KERDI can exceed 40 years. In practice, the tiles, grout, and silicone seals will need maintenance long before the membrane fails.

Can I tank over existing tiles?

Yes, provided the existing tiles are firmly bonded, the surface is clean, and you use a suitable primer. Products like Mapei Eco Prim Grip or BAL Bond will key the membrane to the glazed tile surface. This is a common approach when converting an existing bathroom to a wet room without stripping tiles from walls that will not receive water directly.

Do I need to tank behind a bath if there is no shower over it?

BS 5385-1:2018 defines the area around a bath as a wet area. While the risk is lower without a shower, condensation and splashing still expose the substrate to moisture over time. Best practice is to tank the full tiled area behind and beside the bath. At minimum, use a waterproof adhesive and ensure all junctions are sealed.

What is the difference between tanking and waterproofing?

In practical UK tiling terminology, the two terms are often used interchangeably. Strictly, "tanking" refers to creating a complete sealed envelope (as in a wet room), while "waterproofing" can refer to localised moisture protection (e.g. a shower wall). For BS 5385-1 compliance, both require a proprietary membrane system -- the distinction is in coverage area rather than product type.

Is a tanking kit enough for a wet room?

Standard tanking kits (e.g. Mapei AquaDefense Kit, Weber SYS Protect Kit) typically contain enough membrane for 4-5 m2 and a roll of tanking tape. This is usually sufficient for a standard shower enclosure but will not cover a full wet room. For a wet room, calculate total wall and floor area and purchase membrane and tape accordingly -- you will typically need 2-3x the quantity in a standard kit.

Regulations & Standards