Summary

Creaking floors are the most common complaint in houses of every age, and the most commonly mis-fixed. The DIY response is talcum powder in the gaps, or a few nails in the noisy board, which silences the symptom for a fortnight. The trade response is to understand that a creak needs three things: movement, friction and a gap for the movement to happen in. Remove any one and the creak stops. Boards lifting off joists (loose fixings), boards rubbing against each other (shrinkage opening tongue-and-groove joints, or a board edge rubbing a neighbour), chipboard rubbing on a joist that has shrunk away, a joist that has dropped on a sleeper wall or hanger, a pipe clipped to a joist that squeaks as the board above moves: each has a different fix, and only the first is cured by a screw.

Stairs are the same problem in a different shape. A traditional cut-string or closed-string stair is held together with glued wedges driving the treads and risers into housings in the strings, and glue blocks in the internal angle between tread and riser. Fifty years of drying and foot traffic loosen the wedges, the glue blocks fall off and the tread flexes against the riser tongue on every step. The fix is from below, re-wedging and re-blocking, which is a two-hour job if the underside is accessible and a half-day with plastering if it is boxed in. The alternative, screwing down through the tread into the riser from above, works only where there is enough timber and the heads can be hidden.

The regulatory position matters because customers ask whether it is a "defect". Approved Document E concerns sound insulation between dwellings and rooms, not creaks, and there is no Building Regulations tolerance for creaking floors in a single dwelling. New-home warranty providers (NHBC Standards Chapter 6.4 and equivalents) accept some floor noise but treat persistent creaking caused by inadequate fixing as a defect in the first two years. For the joist rules referenced throughout see notching and drilling joists rules and joist installation; for stair construction see staircase construction.

Key Facts

Quick Reference Table

Diagnosed the problem? Create a repair quote in minutes with squote.

Try squote free →
Symptom Likely cause Test Fix
Single board creaks underfoot, rises visibly Board loose on nails Press board edge: see it move 1–3 mm Screw down into joist both sides of the gap
Creak along a line across the room Joist dropped or shrunk; boards suspended on fixings Several boards move together; straight edge shows dip Pack bearing, re-fix boards to joist
Chipboard creaks at a joint, not over a joist Unglued T&G rubbing Creak between joists; joint visible Glue joint (inject PU adhesive) or screw both sides
Creak under carpet, whole area, newer house Chipboard not glued or screwed to joists; joists shrunk Bounce test; count fixings on lifted board Lift carpet, screw at 300 mm centres
Creak only when stepping near a wall Board rubbing skirting or a pipe clipped at the joist end Remove skirting or lift board at wall Trim board, sleeve pipe
Floor bounces and creaks mid-room Missing or loose strutting; undersized joists Deflection over 10 mm under one person Fit herringbone or solid strutting; sister joists if undersized
Laminate or engineered floor creaks everywhere Uneven subfloor, pinched expansion gap, compressed underlay Check gap at skirting; check level 3 mm/2 m Relieve gap; level subfloor; re-lay
Stair tread creaks at the front Glue blocks off; riser tongue loose in tread groove Press nosing; see riser move Re-block and glue from below; screw tread to riser
Stair tread creaks at the string Wedges loose or split Look under stair: wedges proud or missing Re-glue and re-drive wedges; replace split ones
Whole stair creaks and flexes String fixing to wall or newel loose; carriage missing Push stair sideways; look for gaps at wall string Re-fix string to wall; fit a carriage piece under centre
Creak returns within weeks Lubricant or nails used; cause not addressed — Diagnose movement and screw-fix

Detailed Guidance

Diagnosis: find the movement first

Walk the room slowly, heel first, and mark each creak with tape. Then kneel and press beside each mark with the flat of the hand and watch: the board that moves is the culprit, and the direction tells you the cause. A board that rises and falls at one edge is loose on the joist below that edge. Two boards whose edges move relative to each other are rubbing at the joint. A whole strip of boards moving together is a joist problem. If nothing visibly moves but the creak persists, the noise is coming from below the board: a pipe, a cable clip, a joist on a loose hanger, or the board rubbing on the joist itself where the joist top is uneven.

CREAKING FLOOR — DIAGNOSIS
│
├─ Does ONE board visibly rise 1–3 mm when pressed at its edge?
│   └─ YES ──> Loose fixing. Screw into joist each side of the lifting point.
│
├─ Do TWO adjacent boards move relative to each other at the joint?
│   └─ YES ──> Edge rub / open T&G. Screw both to joist; glue joint if chipboard.
│
├─ Do SEVERAL boards in a line move together?
│   └─ YES ──> Joist moving (shrunk, dropped bearing, loose hanger).
│               Lift a board, inspect bearing, pack and re-fix.
│
├─ Does the floor BOUNCE (>10 mm under one person at mid-span)?
│   └─ YES ──> Missing strutting or undersized joists. Strut; sister if needed.
│
├─ Is the creak near a wall, radiator or bathroom?
│   └─ YES ──> Suspect a pipe under the board. Lift and sleeve; do not screw.
│
└─ No visible movement, creak remains?
    └─ Lift the board. Look for: pipe/cable clip, uneven joist top, loose noggin.

Screwing down a boarded floor

The standard fix for a loose softwood board. Find the joist line from the existing nail heads. Before driving the first screw, confirm what is under the board: lift a board at the edge of the room, or use a pipe and cable detector, or at the very least drill a 3 mm pilot hole and probe. The highest-risk zone is the 400 mm nearest any wall, where plumbers notch pipes into the joist tops, and anywhere a radiator, bathroom or kitchen is nearby. A 60 mm screw through a 15 mm copper pipe is a flood under a floor you have just fixed.

Use 4 mm or 4.5 mm × 50 mm screws for 20 mm boards (60 mm for 25 mm boards), countersunk and driven flush or 1 mm below the surface, two per joist crossing, 20–25 mm in from the board edges. Where the board has cupped, screw the high edge first and pull it down. Fill the holes if the floor is to be exposed. If the old cut nails are proud, drive them below the surface with a nail punch first.

Where a board has been lifted before and has lost its tongue, the cut edge rubs its neighbour; a screw into the joist each side cures it, or glue a thin fillet of timber into the gap.

Chipboard floors

Most post-1970 upper floors are tongue-and-groove chipboard, often laid dry with nails or too few screws, on joists that then dried and shrank. The creak comes from the board rubbing on the joist, from the T&G joint rubbing, or from the nail shank squeaking in the hole. Lift the carpet (a carpet fitter's job if it is to go back without stretch marks), find the joists from the existing fixings, and screw at 300 mm centres along every joist and 150 mm at board ends with 4.5 mm × 50 mm (18 mm board) or 60 mm (22 mm board) screws. For unglued joints between joists, inject polyurethane adhesive into the joint from above through 3 mm holes at 200 mm centres, or screw a 50 × 50 mm batten to the joist side under the joint, or screw both boards down to a noggin fixed between joists. BS EN 312 P5 board that has got wet and swollen will never stop creaking and must be replaced.

Under a laminate or engineered floor laid over chipboard, the creak is usually the chipboard, not the floating floor. Lift the floating floor along one wall, screw down the chipboard, re-lay.

Joists, bearings and strutting

A line of creaking boards across a room is a joist moving. Lift one board over the line and look at the joist. Common findings:

Pipes, cables and fixings that squeak

A copper pipe clipped tight to the side or top of a joist, or passing through a tight notch, squeaks as the board deflects and the pipe rubs. Lift the board, loosen the clip or replace it with a plastic snap clip, and wrap the pipe in felt or foam pipe insulation where it passes through notches. Never screw a board down over a creaking pipe to "hold it still": the board still moves and the screw may enter the pipe.

Stairs: fixing from below

With the underside accessible (a cupboard under the stairs with the soffit open, or a plasterboard soffit you can remove and replace), the repair is straightforward. Clean the dust off. For each creaking tread, check the wedges: a loose wedge pulls out by hand, a split one has a visible crack. Remove, apply PVA or polyurethane adhesive to the housing and the wedge, and drive it home with a hammer until the tread or riser is tight in the housing. Replace missing wedges with new ones cut from hardwood (oak or beech) to match the taper. Then fit glue blocks: 50 × 50 mm softwood, 100–150 mm long, glued and rubbed into the internal angle between the tread underside and the riser face, two or three per tread, pinned or screwed while the glue sets. Finally, screw up through the riser into the underside of the tread above at 200 mm centres with 4 mm × 40 mm screws where the riser tongue is loose in the tread groove. Allow 1.5–3 hours for a 13-tread flight.

If the stair has a carriage (a central bearer under the treads with brackets), check it is fixed at top and bottom and that the brackets are tight.

Stairs: fixing from above

Where the underside is plastered in and the customer will not accept opening it, work from the top. Lift the carpet. For a creak at the nosing, drive 4 mm × 50 mm screws down through the tread into the top edge of the riser at 200 mm centres, in a line 15–20 mm back from the riser face (locate the riser by its thickness, usually 15–20 mm), counterbored 8 mm and plugged with matching timber or filled under carpet. Glue the joint first by working PVA into any gap. For a creak at the back of the tread, screw at an angle through the tread into the riser above where there is a gap, or fit a small glued fillet in the angle. For the string joint, screw down through the tread into the string where the housing has opened. It is less tidy than working from below and less durable, because the wedges remain loose; tell the customer.

Frequently Asked Questions

Is a creaking floor a Building Regulations failure?

No. The Building Regulations do not address creaking within a dwelling. Approved Document E concerns airborne and impact sound insulation between separate dwellings and between rooms used for residential purposes, not floor noise within a house. Approved Document A covers structural adequacy, and a floor that deflects excessively or has over-notched joists may be an A issue, but the creak itself is not. On a new home, persistent creaking caused by inadequate fixing is a workmanship defect under the warranty provider's standards during the defects period.

Will talc, graphite or lubricant fix it?

Briefly. Lubricants reduce the friction between the rubbing surfaces, which stops the noise until the lubricant works out, typically a few weeks. They do nothing about the movement that causes the rub. The only permanent cure is to stop the movement: fix the board to the joist, glue the joint, pack the joist or re-wedge the stair.

Can I screw down floorboards without lifting them?

Yes, and that is the normal fix, with one condition: you must know what is under the board. Pipes run in notches at the top of joists, mostly within 400 mm of walls and near radiators and bathrooms, and a 50 mm screw will go straight through 15 mm copper. Use a detector, check the pipe routes from radiators and sanitaryware, drill a pilot and probe, or lift one board to see. Never guess near a wall.

Why does a new-build floor creak after a year?

Because the joists were installed with a moisture content of 20% or more and have dried to 10–12% in a heated house, shrinking several millimetres and leaving the chipboard suspended on its fixings. Nails, where used, lose grip; the board rubs on the fixing and on the joist. Screwing at close centres cures most of it; packing is needed where the gap is large. Report it to the warranty provider within the two-year defects period.

How much does it cost to stop a floor creaking?

A carpenter charges roughly £35–£55 per hour regionally. A boarded bedroom floor with easy access takes 1–3 hours; a carpeted chipboard floor 2–5 hours plus a carpet fitter to lift and refit (£60–£120); a stair from below 1.5–3 hours; a stair from above 3–5 hours. Materials are a box of screws, a tube of polyurethane adhesive and some packers, under £30. A bouncing floor that needs strutting or sistering is a different job at £300–£1,200.

Regulations & Standards