Summary

Every trade that runs services through a floor cuts joists: plumbers for 15 mm and 22 mm pipes, electricians for cables, heating engineers for 28 mm flow and returns, and bathroom fitters for 40 mm wastes that should never go through a joist at all. A joist is a beam; its strength is in the top (compression) and bottom (tension) fibres, and its stiffness falls with the cube of its depth. A 40 mm notch in the bottom of a 195 mm joist at mid-span is not a small cut. It removes the tension fibres where the bending moment is highest and can halve the joist's capacity; a crack starting from the notch corner is the usual failure. Building Control officers see it on nearly every bathroom refit inspection, and insurers see it when a floor sags under a new bath.

The rules exist to keep cuts where the stresses are low: notches near the supports where bending is small but shear is highest (so they are limited in depth and kept away from the bearing), and holes near the neutral axis where the bending stress is close to zero, in the zone between a quarter and 0.4 of the span where shear has dropped off but the bending moment has not peaked. Follow them and the joist's design capacity is preserved; ignore them and the only honest answer is a structural engineer's check or a repair.

A point of confusion is where the rules now live. The familiar diagram was in Approved Document A from 1992 until the 2004 edition, which dropped the span tables and the detailed timber guidance and instead refers to TRADA's span tables and (through them and BS 8103-3) to Eurocode 5. The figures did not change; the reference did. Councils, LABC and the IET's electrical guidance all still publish the same limits, and a Building Control officer will expect them to be met for solid timber. For engineered joists the manufacturer's hole chart replaces them entirely.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
Joist depth (mm) Max notch depth (0.125 × D, capped at 35 mm) Max hole diameter (0.25 × D) Hole spacing minimum (3 × D hole) Pipes that will fit a maximum hole
97 12 mm 24 mm 72 mm 15 mm only
120 15 mm 30 mm 90 mm 15 mm, 22 mm
145 18 mm 36 mm 108 mm 15 mm, 22 mm, 28 mm
170 21 mm 42 mm 126 mm up to 35 mm
195 24 mm 48 mm 144 mm up to 40 mm waste (45 mm hole marginal)
220 27 mm 55 mm 165 mm 40 mm waste with clearance
245 30 mm 61 mm 183 mm 50 mm waste
Span (clear, mm) Notch zone from each support (0.07–0.25 span) Hole zone from each support (0.25–0.4 span) No-cut middle zone
2,500 175–625 mm 625–1,000 mm 1,000–1,500 mm
3,000 210–750 mm 750–1,200 mm 1,200–1,800 mm
3,500 245–875 mm 875–1,400 mm 1,400–2,100 mm
4,000 280–1,000 mm 1,000–1,600 mm 1,600–2,400 mm
4,500 315–1,125 mm 1,125–1,800 mm 1,800–2,700 mm
5,000 350–1,250 mm 1,250–2,000 mm 2,000–3,000 mm

Detailed Guidance

Why the zones are where they are

A uniformly loaded simply supported joist has its maximum bending moment at mid-span and zero at the supports, and its maximum shear at the supports and zero at mid-span. Bending is carried by the top and bottom fibres; shear is carried by the web (the middle of the depth).

A notch removes top fibres, so it is kept away from mid-span where the bending stress peaks, and kept away from the bearing where the full shear passes through the reduced section. The 0.07–0.25 zone is the compromise. A hole on the centre line removes material where bending stress is nearly zero, so it can be bigger, but it reduces the shear area, so it is kept out of the high-shear zone near the supports; the 0.25–0.4 zone is where both are modest. Nothing goes in the middle 20% of the span.

     support                                              support
       │  notch zone   │   hole zone   │ no cuts │ hole zone │ notch zone │
       │ 0.07 – 0.25 L │ 0.25 – 0.4 L  │0.4–0.6 L│ 0.4–0.25 L│0.25–0.07 L │
       ▼               ▼               ▼         ▼           ▼            ▼
  ═════╤═══════════════╤═══════════════╤═════════╤═══════════╤════════════╤═════
       │ ▔▔ top notch  │   ○ hole on   │         │   ○ hole  │  top notch │
       │ ≤ 0.125 D     │   centre line │         │   ≤ 0.25 D│  ▔▔        │
  ═════╧═══════════════╧═══════════════╧═════════╧═══════════╧════════════╧═════
       ◄──────────────────────── clear span L ────────────────────────────►

Working through a real floor

A first-floor bathroom with 47 × 195 mm C24 joists at 400 mm centres spanning 3.8 m clear, and you need to run a 22 mm hot and cold, a 15 mm radiator pair, and a 40 mm basin waste across the joists to a stack on the far wall.

That is the normal outcome: pipes under 28 mm go through holes; anything bigger runs parallel to the joists in the void or below the ceiling.

Cables through joists

Electricians usually drill rather than notch, and BS 7671 Regulation 522.8.5 adds the 50 mm rule: a cable passing through a joist must be at least 50 mm from the top and bottom surface, or be in earthed steel conduit or protected by a plate. A centre-line hole in a joist 100 mm or deeper satisfies it automatically. Where a cable must go in a notch (on a shallow joist, or where the pipe has taken the hole zone), a steel plate at least 3 mm thick nailed over the notch is the accepted protection. Cables and pipes share holes only with clearance; do not run a cable in contact with a hot pipe (Regulation 522.2).

Engineered joists

Timber I-joists (such as TJI, JJI and similar) have a thin OSB or plywood web and solid or LVL flanges. The flanges carry the bending and must never be cut, notched or drilled. The web may have round holes, often up to a large proportion of the web depth, to the manufacturer's hole chart, which specifies the maximum diameter against position along the span and minimum spacing; many webs have pre-marked knockouts for services. Rectangular holes are generally not permitted without the manufacturer's approval.

Metal-web joists (Posi-Joist, Easi-Joist and similar) have open webs that services pass through without any cutting. They must not be notched, drilled or cut anywhere, including the flanges. The one failure mode on site is a joiner trimming a flange for a soil pipe; it needs an engineer's repair detail.

When the rules do not cover you

The published limits assume a simply supported solid timber joist with a uniformly distributed domestic floor load. They do not cover:

In those cases the answer is an engineer's calculation, or to run the service another way.

Repairing a joist cut beyond the limits

A single joist cut too deep near mid-span (the classic 40 mm bottom notch for a waste) is repaired by:

  1. Supporting the floor on props if there is any sign of deflection.
  2. Bolting a timber plate (same depth as the joist, 47 mm or more, C24) or a 6–10 mm steel flitch plate to one or both sides, extending at least 600 mm either side of the cut, with M12 bolts at 300 mm centres staggered top and bottom.
  3. Or sistering a full new joist alongside, bearing on the same supports, and bolting through at 400–600 mm centres.

Either repair should be agreed with Building Control where the work is part of a notified job, and photographed before the floor goes back down. A row of joists cut for a waste along the whole bathroom is an engineer's job.

Pricing and quoting

Drilling joists is included in a plumbing or electrical first fix and is not usually a line item. The things that are: boxing a waste below a ceiling because the joists are too shallow (£150–£300 for a run), a flitch plate repair to a previously cut joist (£120–£250 per joist including bolts), and a structural engineer's letter where Building Control asks for one (£250–£500). Quote them when the survey shows 120 mm or 145 mm joists in a bathroom, because the waste will not go through them.

Frequently Asked Questions

Can I notch the bottom of a joist if it is only a small notch?

No. The bottom fibres are in tension and a notch there, however small, is a stress concentration where a crack starts. None of the published UK rules permit a bottom notch in a solid joist. If a service must cross below the neutral axis, drill a hole on the centre line or run it below the ceiling.

Where exactly are these limits in the current Approved Document A?

They are not in the 2004 edition text. The 2004 edition removed the timber span tables and the notching diagram (paragraph 1B6 of the 1992 edition) and refers to TRADA's span tables for domestic floor joists, which carry the same notching and drilling limits, as does BS 8103-3:2009. Building Control still expects the limits to be met; cite TRADA, BS 8103-3 and LABC guidance rather than "Approved Document A paragraph 1B6".

How big a hole can I drill for a 40 mm waste?

A 40 mm plastic waste is about 43 mm outside diameter, so it needs a 45–50 mm hole. At 0.25 × depth, that requires a joist at least 180–200 mm deep, on the centre line, in the 0.25–0.4 span zone. On shallower joists the waste runs parallel to the joists or below the ceiling. Soil pipes (110 mm) never go through joists.

Can an electrician put a cable in the same notch as a pipe?

Only with clearance from a hot pipe and a protective plate over the notch. BS 7671 requires cables in notches to be protected against nails and screws, and requires separation from pipes that get hot. Better practice is a separate hole for the cable on the centre line, which satisfies the 50 mm rule without a plate.

Do the rules apply to ceiling joists in the loft?

Ceiling joists carrying only the ceiling and loft storage are lightly loaded, and the same geometric limits apply as a matter of good practice. If the loft has been converted, the floor joists are structural floor joists and the full rules, or the engineer's details for the conversion, apply.