Summary
Every trade that runs services through a floor cuts joists: plumbers for 15 mm and 22 mm pipes, electricians for cables, heating engineers for 28 mm flow and returns, and bathroom fitters for 40 mm wastes that should never go through a joist at all. A joist is a beam; its strength is in the top (compression) and bottom (tension) fibres, and its stiffness falls with the cube of its depth. A 40 mm notch in the bottom of a 195 mm joist at mid-span is not a small cut. It removes the tension fibres where the bending moment is highest and can halve the joist's capacity; a crack starting from the notch corner is the usual failure. Building Control officers see it on nearly every bathroom refit inspection, and insurers see it when a floor sags under a new bath.
The rules exist to keep cuts where the stresses are low: notches near the supports where bending is small but shear is highest (so they are limited in depth and kept away from the bearing), and holes near the neutral axis where the bending stress is close to zero, in the zone between a quarter and 0.4 of the span where shear has dropped off but the bending moment has not peaked. Follow them and the joist's design capacity is preserved; ignore them and the only honest answer is a structural engineer's check or a repair.
A point of confusion is where the rules now live. The familiar diagram was in Approved Document A from 1992 until the 2004 edition, which dropped the span tables and the detailed timber guidance and instead refers to TRADA's span tables and (through them and BS 8103-3) to Eurocode 5. The figures did not change; the reference did. Councils, LABC and the IET's electrical guidance all still publish the same limits, and a Building Control officer will expect them to be met for solid timber. For engineered joists the manufacturer's hole chart replaces them entirely.
Key Facts
- Notches: top edge only — never the bottom edge, where the tension fibres are; a bottom notch is a crack starter and is not permitted under any of the published rules
- Notch depth — maximum 0.125 × joist depth (one eighth): 24 mm on a 195 mm joist, 28 mm on a 220 mm joist; TRADA and LABC guidance caps it at 35 mm regardless of depth
- Notch position — between 0.07 and 0.25 of the clear span from the face of either support: on a 4.0 m span, between 280 mm and 1,000 mm from each end; nothing closer to the bearing than 0.07 span, nothing in the middle half
- Holes: centre line only — drilled on the neutral axis (mid-depth), never towards the top or bottom
- Hole diameter — maximum 0.25 × joist depth: 48 mm on a 195 mm joist, 55 mm on a 220 mm joist; the hole must fit the pipe with clearance, so a 22 mm pipe needs about a 25–28 mm hole, and a 40 mm waste needs a 45 mm hole that only a 180 mm or deeper joist can take
- Hole spacing — at least 3 diameters apart centre to centre: 48 mm holes at 144 mm centres minimum
- Hole position — between 0.25 and 0.4 of the span from either support: on a 4.0 m span, between 1,000 mm and 1,600 mm from each end; not in the middle 20% and not near the bearings
- Notches and holes together — at least 100 mm apart horizontally in the same joist (NBS and common Building Control practice)
- Scope — simply supported solid timber floor and roof joists in houses of not more than three storeys; outside that (longer spans, heavily loaded floors, trimmers, joists already notched elsewhere) an engineer's check is needed
- Not for engineered joists — I-joists (timber flanges, OSB web) may have round holes in the web to the manufacturer's chart but must never be notched or have the flanges cut; metal-web (open-web) joists must not be cut, notched or drilled at all; glulam and LVL to the supplier's rules
- Trimmers and trimming joists — around stairwells and chimney breasts these carry other joists and are not covered by the domestic rules; do not notch them without an engineer
- Cables — BS 7671:2018+A4:2026 Regulation 522.8.5: cables through joists must be at least 50 mm from the top and bottom surface of the joist, or be protected against penetration by nails and screws; in practice holes on the centre line of a 150 mm or deeper joist satisfy it
- Cables in notches — permitted in a top-edge notch only with a steel plate (or similar) over the notch to protect against fixings through the floor, which is the usual plumber-and-sparky conflict
- Pipes — Approved Document L and good practice: insulate hot pipes in floor voids; a pipe through a hole should have a clearance of a few millimetres so it can move without creaking
- Floorboards — screwing boards down through a notch into a pipe or cable is the most common floor-related leak and shock risk; mark notch positions on the boards or use plates
- Repair — a joist cut beyond the limits is repaired by bolting a timber or steel flitch plate either side across the cut zone, or by sistering a new full-depth joist, to an engineer's or a Building Control officer's satisfaction
- Span measurement — "span" means the clear span between the faces of the supports, not the joist length
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Joist depth (mm) | Max notch depth (0.125 × D, capped at 35 mm) | Max hole diameter (0.25 × D) | Hole spacing minimum (3 × D hole) | Pipes that will fit a maximum hole |
|---|---|---|---|---|
| 97 | 12 mm | 24 mm | 72 mm | 15 mm only |
| 120 | 15 mm | 30 mm | 90 mm | 15 mm, 22 mm |
| 145 | 18 mm | 36 mm | 108 mm | 15 mm, 22 mm, 28 mm |
| 170 | 21 mm | 42 mm | 126 mm | up to 35 mm |
| 195 | 24 mm | 48 mm | 144 mm | up to 40 mm waste (45 mm hole marginal) |
| 220 | 27 mm | 55 mm | 165 mm | 40 mm waste with clearance |
| 245 | 30 mm | 61 mm | 183 mm | 50 mm waste |
| Span (clear, mm) | Notch zone from each support (0.07–0.25 span) | Hole zone from each support (0.25–0.4 span) | No-cut middle zone |
|---|---|---|---|
| 2,500 | 175–625 mm | 625–1,000 mm | 1,000–1,500 mm |
| 3,000 | 210–750 mm | 750–1,200 mm | 1,200–1,800 mm |
| 3,500 | 245–875 mm | 875–1,400 mm | 1,400–2,100 mm |
| 4,000 | 280–1,000 mm | 1,000–1,600 mm | 1,600–2,400 mm |
| 4,500 | 315–1,125 mm | 1,125–1,800 mm | 1,800–2,700 mm |
| 5,000 | 350–1,250 mm | 1,250–2,000 mm | 2,000–3,000 mm |
Detailed Guidance
Why the zones are where they are
A uniformly loaded simply supported joist has its maximum bending moment at mid-span and zero at the supports, and its maximum shear at the supports and zero at mid-span. Bending is carried by the top and bottom fibres; shear is carried by the web (the middle of the depth).
A notch removes top fibres, so it is kept away from mid-span where the bending stress peaks, and kept away from the bearing where the full shear passes through the reduced section. The 0.07–0.25 zone is the compromise. A hole on the centre line removes material where bending stress is nearly zero, so it can be bigger, but it reduces the shear area, so it is kept out of the high-shear zone near the supports; the 0.25–0.4 zone is where both are modest. Nothing goes in the middle 20% of the span.
support support
│ notch zone │ hole zone │ no cuts │ hole zone │ notch zone │
│ 0.07 – 0.25 L │ 0.25 – 0.4 L │0.4–0.6 L│ 0.4–0.25 L│0.25–0.07 L │
▼ ▼ ▼ ▼ ▼ ▼
═════╤═══════════════╤═══════════════╤═════════╤═══════════╤════════════╤═════
│ ▔▔ top notch │ ○ hole on │ │ ○ hole │ top notch │
│ ≤ 0.125 D │ centre line │ │ ≤ 0.25 D│ ▔▔ │
═════╧═══════════════╧═══════════════╧═════════╧═══════════╧════════════╧═════
◄──────────────────────── clear span L ────────────────────────────►
Working through a real floor
A first-floor bathroom with 47 × 195 mm C24 joists at 400 mm centres spanning 3.8 m clear, and you need to run a 22 mm hot and cold, a 15 mm radiator pair, and a 40 mm basin waste across the joists to a stack on the far wall.
- Notch zone: 0.07 × 3,800 = 266 mm to 0.25 × 3,800 = 950 mm from each support. Notch depth: 0.125 × 195 = 24 mm. The 22 mm pipes fit in a 24 mm notch with no clearance; a 22 mm pipe in a 24 mm notch is tight and will creak, so hole them instead.
- Hole zone: 0.25 × 3,800 = 950 mm to 0.4 × 3,800 = 1,520 mm from each support. Hole size: 0.25 × 195 = 48 mm. Two 28 mm holes for the 22 mm pipes at 3 × 28 = 84 mm centres minimum, say 100 mm, on the centre line, within the zone. The 15 mm pair in 20 mm holes alongside, also 3 diameters apart.
- The 40 mm waste needs a 45 mm hole with clearance, which is inside the 48 mm limit, on the centre line, in the hole zone. It will fall 1 in 40 across several joists, so the hole drops 10 mm per 400 mm joist spacing; across six joists that is 60 mm of fall, and the hole in the sixth joist is 60 mm below the first, which takes it off the centre line. Approved Document H wants a minimum fall of 18 mm per metre on a 40 mm waste, so across 2.4 m of joists the fall is at least 43 mm. On a 195 mm joist the hole must stay within the middle third to count as "on the neutral axis" in most Building Control officers' eyes, which gives about 65 mm of travel: it works, barely. On a 145 mm joist it does not, and the waste runs parallel to the joists or boxed below the ceiling.
That is the normal outcome: pipes under 28 mm go through holes; anything bigger runs parallel to the joists in the void or below the ceiling.
Cables through joists
Electricians usually drill rather than notch, and BS 7671 Regulation 522.8.5 adds the 50 mm rule: a cable passing through a joist must be at least 50 mm from the top and bottom surface, or be in earthed steel conduit or protected by a plate. A centre-line hole in a joist 100 mm or deeper satisfies it automatically. Where a cable must go in a notch (on a shallow joist, or where the pipe has taken the hole zone), a steel plate at least 3 mm thick nailed over the notch is the accepted protection. Cables and pipes share holes only with clearance; do not run a cable in contact with a hot pipe (Regulation 522.2).
Engineered joists
Timber I-joists (such as TJI, JJI and similar) have a thin OSB or plywood web and solid or LVL flanges. The flanges carry the bending and must never be cut, notched or drilled. The web may have round holes, often up to a large proportion of the web depth, to the manufacturer's hole chart, which specifies the maximum diameter against position along the span and minimum spacing; many webs have pre-marked knockouts for services. Rectangular holes are generally not permitted without the manufacturer's approval.
Metal-web joists (Posi-Joist, Easi-Joist and similar) have open webs that services pass through without any cutting. They must not be notched, drilled or cut anywhere, including the flanges. The one failure mode on site is a joiner trimming a flange for a soil pipe; it needs an engineer's repair detail.
When the rules do not cover you
The published limits assume a simply supported solid timber joist with a uniformly distributed domestic floor load. They do not cover:
- trimmers and trimming joists around openings, which carry point loads from trimmed joists
- joists carrying a partition, a bath, a water cylinder or a kitchen island
- spans over about 5 m, or floors designed for more than 1.5 kN/m² (offices, storage)
- joists already notched or drilled elsewhere along their length
- cantilevers (the rules invert because the tension is in the top)
- joists that are undersized to begin with, which is common in Victorian terraces
In those cases the answer is an engineer's calculation, or to run the service another way.
Repairing a joist cut beyond the limits
A single joist cut too deep near mid-span (the classic 40 mm bottom notch for a waste) is repaired by:
- Supporting the floor on props if there is any sign of deflection.
- Bolting a timber plate (same depth as the joist, 47 mm or more, C24) or a 6–10 mm steel flitch plate to one or both sides, extending at least 600 mm either side of the cut, with M12 bolts at 300 mm centres staggered top and bottom.
- Or sistering a full new joist alongside, bearing on the same supports, and bolting through at 400–600 mm centres.
Either repair should be agreed with Building Control where the work is part of a notified job, and photographed before the floor goes back down. A row of joists cut for a waste along the whole bathroom is an engineer's job.
Pricing and quoting
Drilling joists is included in a plumbing or electrical first fix and is not usually a line item. The things that are: boxing a waste below a ceiling because the joists are too shallow (£150–£300 for a run), a flitch plate repair to a previously cut joist (£120–£250 per joist including bolts), and a structural engineer's letter where Building Control asks for one (£250–£500). Quote them when the survey shows 120 mm or 145 mm joists in a bathroom, because the waste will not go through them.
Frequently Asked Questions
Can I notch the bottom of a joist if it is only a small notch?
No. The bottom fibres are in tension and a notch there, however small, is a stress concentration where a crack starts. None of the published UK rules permit a bottom notch in a solid joist. If a service must cross below the neutral axis, drill a hole on the centre line or run it below the ceiling.
Where exactly are these limits in the current Approved Document A?
They are not in the 2004 edition text. The 2004 edition removed the timber span tables and the notching diagram (paragraph 1B6 of the 1992 edition) and refers to TRADA's span tables for domestic floor joists, which carry the same notching and drilling limits, as does BS 8103-3:2009. Building Control still expects the limits to be met; cite TRADA, BS 8103-3 and LABC guidance rather than "Approved Document A paragraph 1B6".
How big a hole can I drill for a 40 mm waste?
A 40 mm plastic waste is about 43 mm outside diameter, so it needs a 45–50 mm hole. At 0.25 × depth, that requires a joist at least 180–200 mm deep, on the centre line, in the 0.25–0.4 span zone. On shallower joists the waste runs parallel to the joists or below the ceiling. Soil pipes (110 mm) never go through joists.
Can an electrician put a cable in the same notch as a pipe?
Only with clearance from a hot pipe and a protective plate over the notch. BS 7671 requires cables in notches to be protected against nails and screws, and requires separation from pipes that get hot. Better practice is a separate hole for the cable on the centre line, which satisfies the 50 mm rule without a plate.
Do the rules apply to ceiling joists in the loft?
Ceiling joists carrying only the ceiling and loft storage are lightly loaded, and the same geometric limits apply as a matter of good practice. If the loft has been converted, the floor joists are structural floor joists and the full rules, or the engineer's details for the conversion, apply.
Regulations & Standards
Building Regulations 2010, Approved Document A (Structure), 2004 edition incorporating 2010 and 2013 amendments — Requirement A1, with reference to TRADA span tables for domestic timber floors
Approved Document A, 1992 edition (with 1994 and 2000 amendments), paragraph 1B6 — the original source of the notch and hole limits (superseded but still cited)
BS 8103-3:2009 — Structural design of low-rise buildings: code of practice for timber floors and roofs for housing
BS EN 1995-1-1:2004+A2:2014 (Eurocode 5) — Design of timber structures: general, common rules and rules for buildings
TRADA — Span tables for solid timber members in floors, ceilings and roofs for dwellings (Eurocode 5 edition)
BS 7671:2018+A4:2026 — Requirements for Electrical Installations: Regulation 522.8.5 (cables through joists), 522.6 (impact), 522.2 (ambient temperature)
Building Regulations 2010, Approved Document H (Drainage and waste disposal) — falls and sizes of waste pipes in floor voids
Building Regulations 2010, Approved Document L, Volume 1 — insulation of pipes in floor voids
BS 5268-2:2002 (withdrawn, replaced by Eurocode 5) — the permissible-stress code under which many existing floors were designed
NHBC Standards, Chapter 6.4 (Timber and concrete upper floors) — notching and drilling limits for new homes under NHBC warranty
LABC — How to get it right: notches and holes in solid timber joists
NHBC Standards — Chapter 6.4 Timber and concrete upper floors
East Lindsey District Council — Building Control guidance: location of notches and holes
joist installation — sizing, bearing and fixing new joists
joist hangers and sizing — joist hangers and trimming around openings
joist span calculator — checking a span before you cut anything
part a structure — Approved Document A overview
floor joist replacement pricing guide — pricing a repair when a joist has been cut too far
loft conversion floor structure — floor joists in a converted loft