Summary

Every electrician knows the three forms exist; the confusion comes at the edges. Does a like-for-like consumer unit change get an EIC or a minor works? Can you issue a minor works for a new shower circuit if you only "extended" an existing one? Can an EICR be used to sign off work you have just done? Getting this wrong is not a paperwork nicety: a competent person scheme assessment will pick it up, a Building Control officer may refuse to accept the wrong form as evidence of compliance with Part P, and a landlord or conveyancing solicitor will reject the wrong document.

The rule of thumb that resolves most cases is new circuit or not. If the work creates a new circuit, including a consumer unit replacement (which creates every circuit afresh at the board), it is an EIC with a schedule of inspections and a schedule of test results. If it adds to or alters an existing circuit without creating a new one, it is a minor works certificate, one per circuit worked on. If no work has been done and you are reporting on the condition of what is there, it is an EICR, and an EICR must never be used as a certificate for your own new work.

The three documents also carry different signatures. An EIC has three: design, construction, and inspection and testing (one person may sign all three on domestic work). A minor works has one. An EICR has an inspector's signature and, on scheme forms, a reviewer's. The person signing is taking responsibility for that part of the work, which is why a minor works issued by the installer for a new circuit is a problem: nobody has signed for the design of that circuit.

Key Facts

Quick Reference Table

Quoting an electrical job? Describe the work and squote handles the pricing.

Try squote free →
Work Certificate Notifiable under Part P (England & Wales)?
New consumer unit, like for like EIC Yes
New shower circuit EIC Yes
New cooker circuit EIC Yes
New radial to a garden office EIC Yes
Extra socket spurred from a ring Minor works No, unless in a bathroom zone
Replace a light fitting or switch Minor works No, unless in a bathroom zone
Fused spur for a boiler on an existing circuit Minor works No
Add an RCBO to an existing circuit in an existing board Minor works No (not a new circuit)
Replace a damaged cable section like for like Minor works No
Electric shower replaced on the existing circuit Minor works Yes (special location)
Landlord's 5-yearly inspection EICR Not applicable — no work done
Pre-purchase survey of a house EICR Not applicable
Remedial work after an unsatisfactory EICR EIC or minor works depending on the work Depends on the work

Detailed Guidance

What goes on an Electrical Installation Certificate

The EIC records the extent of the installation covered, the supply characteristics (earthing arrangement, nominal voltage, prospective fault current, external loop impedance Ze), the main protective devices, the main earthing conductor and main protective bonding conductors with their sizes, and the three declarations. It is accompanied by the Schedule of Inspections (a checklist of items visually inspected, from the condition of the incoming supply through to labelling) and the Schedule of Test Results, which lists every circuit with its cable sizes, protective device, measured R1+R2 or R2, insulation resistance, polarity, Zs, and RCD test results.

Every circuit affected by the work goes on the schedule. On a consumer unit change that is every circuit in the board, which is why the job cannot be done properly without testing each circuit: an electrician who swaps a board and signs an EIC without recording Zs and insulation resistance for each circuit has signed a false document. Where an existing circuit cannot be fully tested (a lighting circuit with no accessible point to measure R1+R2, say) the limitation is recorded in the "extent and limitations" box rather than left blank.

The certificate also carries a "next inspection" recommendation. For a dwelling the usual interval is 10 years, or 5 years for a rented property, or at change of occupancy.

What goes on a Minor Electrical Installation Works Certificate

A minor works certificate is a single page for a single circuit. It records what was done, the protective device for that circuit, the earthing and bonding status, and a short set of test results: continuity of the protective conductor (R1+R2 or R2), insulation resistance, polarity, earth fault loop impedance at the new or altered point, and the RCD operating time where the circuit is RCD-protected. It carries one declaration, from the person who did and tested the work.

The 2018 edition and its amendments made two things explicit. The certificate may be used for additions or alterations that do not extend to a new circuit, and the installer must confirm that the existing installation is adequate for the addition, in particular the earthing and bonding. If you spur a socket off a ring in a house with no main bonding to the gas and water, the correct response is not to issue a minor works and walk away; it is to record the defect, advise the client in writing, and ideally fit the bonding before you energise your addition.

If the work touches more than one circuit, issue more than one certificate. Two sockets on two different rings is two minor works.

What an EICR actually is

An EICR is an inspection and test of an existing installation against the current edition of BS 7671, with observations graded by the danger they present:

Code Meaning Effect on the outcome
C1 Danger present; risk of injury; immediate action required Unsatisfactory
C2 Potentially dangerous; urgent remedial action required Unsatisfactory
C3 Improvement recommended Satisfactory (on its own)
FI Further investigation required without delay Unsatisfactory

An installation that complied with an earlier edition is not automatically unsatisfactory; the inspector judges whether the departure from the current edition is dangerous. A rewirable fuseboard with no RCD protection is commonly a C2 (or C3 where the circuits are lighting only) rather than a C1. The full coding logic is covered in eicr codes c1 c2 c3 fi explained.

An EICR records limitations: areas not inspected, circuits not tested, the percentage of accessories sampled. The agreed extent and limitations should be set in writing with the client before the inspection starts, because a landlord's EICR with "25% of accessories sampled, no circuits tested" is of little value and may not satisfy the local authority.

The consumer unit question

A consumer unit replacement is the single most common point of confusion. The argument for a minor works runs "I did not add any circuits, I just moved them". It is wrong. A consumer unit change creates new protective devices for every circuit, usually introduces RCD protection, often changes the main switch rating and the tails, and requires the main earthing and bonding to be verified. BS 7671 treats it as an alteration requiring an EIC, the competent person schemes require an EIC, and in England and Wales it is notifiable under Part P. Every circuit goes on the schedule of test results.

The same logic applies to a new sub-main to a garage board: the sub-main is a new circuit and the garage board's circuits are new circuits, so it is an EIC.

Additions in bathrooms

A bathroom is a special location (Section 701). Adding or altering anything in zones 0, 1 or 2 is notifiable under Part P even where the certificate is a minor works. Replacing an electric shower on its existing circuit is the classic case: the certificate is a minor works (no new circuit), but it is notifiable, and the installer must confirm 30 mA RCD protection and supplementary bonding or the conditions for omitting it (Regulation 701.415.2). An extractor fan on a lighting circuit in a bathroom is the same: minor works, but notify.

Landlord work in England

The 2020 regulations for the private rented sector require the landlord to hold a report (an EICR) from a qualified person, carried out at intervals of no more than 5 years, and to:

A satisfactory EICR with only C3 observations needs no remedial action. An unsatisfactory report is not a reason to refuse the job: the remedial work gets its own EIC or minor works, and the written confirmation can be that certificate. Local authorities can fine landlords up to £30,000 for breaches.

Scotland has required a 5-yearly EICR (with a Portable Appliance Test on supplied appliances) since 2015, and Wales since December 2022 under the fitness for human habitation requirements. Requirements for social landlords in England have been consulted on and are being extended; check current gov.uk guidance before advising a housing association.

Who can sign

BS 7671 requires the signatory to be competent: skilled in the work and in inspection and testing. There is no statutory licence for electricians in England and Wales, but Part P notification requires either registration with a competent person scheme or a Building Control application. The 2020 landlord regulations require the EICR to be done by a "qualified person", which the government guidance describes in terms of competence and insurance rather than a specific card, although in practice letting agents ask for a scheme-registered electrician holding the 2391 or equivalent inspection and testing qualification. In Scotland, the inspector must be registered with SELECT or NICEIC or able to demonstrate equivalent competence.

Pricing the paperwork

The certificate is part of the job, not an extra. Where a quote lists "EIC" or "minor works" as a line item, price the testing time it represents: a minor works on a spur is 20–30 minutes of testing and a form; an EIC on a consumer unit change is an hour or more of testing on a 10-way board. An EICR on a three-bedroom house in 2026 is typically £150–£300 depending on region and the number of circuits, and is often priced per circuit above a base figure; see eicr pricing guide.

Frequently Asked Questions

Can I issue a minor works certificate for a new shower circuit if I reused the old cable?

No. A circuit that terminates on its own protective device is a circuit. Reusing an existing cable does not change that; if the cable, device, RCD protection and isolator are being provided or altered as a circuit, it is an EIC, and in England and Wales it is notifiable. A like-for-like shower swap on an unchanged circuit is a minor works, still notifiable because of the special location.

A customer wants an "electrical safety certificate" to sell their house — which form is that?

There is no such document in BS 7671. For an existing installation with no work done, the correct document is an EICR. Conveyancing solicitors often ask for a "certificate", and a satisfactory EICR is what they mean. Do not issue an EIC for work you have not done.

The EICR is unsatisfactory — can I fix the C2s and change the report to satisfactory?

No. The report records the condition on the date of inspection. Do the remedial work, certify it with an EIC or minor works as appropriate, and either issue a new EICR or provide written confirmation that the remedial work has been completed, which is what the landlord regulations require.

Do I need a separate minor works for each socket I add?

One certificate per circuit, not per accessory. Three sockets spurred from the same ring go on one minor works; one socket on the kitchen ring and one on the upstairs ring need two.

Does a minor works certificate satisfy Part P?

Part P is about Building Regulations compliance, not BS 7671 paperwork. Non-notifiable work needs no notification, so a minor works certificate is the only document. Notifiable minor works (bathroom zones) must be notified through a competent person scheme or Building Control, and the scheme compliance certificate is the Part P evidence; the minor works is the BS 7671 evidence. They are two different documents.

Regulations & Standards