squote
Knowledge
Home
Login
Try free →
← Knowledge Base
Bathrooms
21 articles
Accessible Bathroom Design: Doc M Pack, Grab Rails & Level Access Showers
Accessible bathrooms: Doc M packs, Approved Document M turning circles, grab rail fixing, level-access showers, DFG grants
Bath Installation: Cradle vs Legs, Waste Positioning & Tiling Sequence
Bath installation: cradle vs adjustable legs, waste testing before enclosure, tiling sequence, silicone at rim
Bathroom Extractor Fan Guide: Selection, Sizing, Installation and Approved Document F
Approved Document F 15 L/s intermittent or 8 L/s continuous, dMEV continuous extract, duct to outside (never roof void), 15-min overrun, BS 7671 zones, Vent-Axia/Greenwood/Manrose brands
Bathroom Floor Preparation: Levelling, Tanking, Tile Backer Boards & Falls
Bathroom floor preparation: levelling compound, tile backer boards, tanking, and wet room falls (1:80 minimum)
Bathroom Lighting Zones & IP Ratings: What Can Go Where?
Bathroom lighting zones 0/1/2 per BS 7671, IP rating requirements per zone, SELV requirements in zone 1
Bathroom Pod Installation: Pre-Fabricated Units for Hotels, Student Accommodation and Modular Housing
Steel-framed/GRP/concrete pods, 1.5-4 tonne weight, plinth support + crane install + service flying tails, 6-16 weeks factory lead, hotel/student/BTR sectors, MPBA + BMA bodies
Bathroom Ventilation Requirements: Extract Fans, Humidity Sensors & Building Regs Part F
Bathroom ventilation: 15 l/s intermittent or 8 l/s continuous per Approved Document F, overrun timers, humidity control
Electric vs Mixer vs Digital Showers: Flow Rates, Costs & Installation Differences
Shower comparison: electric (single-point), mixer (gravity/combi), digital; flow rates, water pressure requirements, installation differences
Heated Towel Rail Installation: Selection, Sizing, Plumbing and Electrical
CH/electric/dual-fuel types, 10-15% supplementary sizing, ΔT50 output reference, BS EN 442 specification, manual/TRV/designer valves, Part P notifiable, heat pump derating
How Do You Install a Freestanding Bath? Plumbing, Waste, and Structural Considerations
Floor loading for cast iron baths (130–160kg + 200–250L water), waste outlet options, minimum water pressure (0.2 bar), WRAS-approved components
How Should a Bathroom or Wet Room Be Waterproofed Before Tiling?
Tanking systems (BAL WP1, Mapelastic, Schluter Kerdi), BS 5385-1 recommendations, substrate preparation, corner tape, movement joints
How to Build a Wet Room: Tanking, Falls, Drainage & BS 5385
Wet room construction: tanking systems, drainage falls (1:80 minimum), waste positioning, BS 5385 substrate requirements
Macerator and Saniflo Installation: When to Use, Plumbing and Compliance
BS EN 12050-3 pump standard, additional WC only (not sole WC) per Approved Document G, 4-5m max vertical lift, descale every 12 months, customer education on no wet wipes
Toilet Types: Close-Coupled, Wall-Hung, Back-to-Wall & Concealed Cisterns
Toilet types: close-coupled, wall-hung (with frame), back-to-wall, concealed cistern — structural requirements, installation depths
Walk-in Shower Installation: Trays, Enclosures, Falls and Compliance
1200-1700mm trays, low-profile vs level-access, 8/10mm BS EN 12150 toughened glass, TMV2/TMV3 thermostatic mixer, R10/R11 slip resistance, 200-300mm walk-in entry
Wet Room Installation Guide: Tanking, Falls, Drainage and Compliance
BS 5385-4 + BS 8000-11 tanking, 1:50 minimum fall (1:35 accessibility), Mapei/Wedi/Schluter Kerdi systems, R10/R11 slip resistance, BS 7671 Section 701, full Approved Document F ventilation
What Adaptations Are Required for Accessible Bathrooms Under Building Regulations?
Approved Document M Cat 2/3, BS 8300:2018, grab rail 800N loading, non-slip flooring (PTV >36), Disabled Facilities Grant up to £30,000, OT assessment process
What Are the Key Regulations and Planning Considerations for a Bathroom Refit?
Part P/G/F notification requirements, minimum space standards (BS 6465-1), Zone 0/1/2 electrical rules, wet room gradients, HMO standards
What Heating Options Are There for Bathrooms and Which Is Most Suitable?
Electric/hydronic towel rails, UFH mats, infrared panels: IPX zone ratings, Lot 20 ErP, BS 7671 requirements, no gas fires in bathrooms rule
What Tiles Should You Use in a Bathroom? A Guide to Selecting Wall and Floor Tiles
Tile selection for bathrooms: porcelain vs ceramic, PTV slip resistance, zone classification, adhesive class selection (C2TE S1/S2), grout joint widths, large format handling
What Types of Basin Are Available and Which Is Right for the Space?
Pedestal vs semi-pedestal vs wall-hung vs countertop basin comparison: wall-hung frame loads (200kg+), Part G flow rates, BS EN 31, accessibility knee clearance