squote
Knowledge
Home
Login
Try free →
← Knowledge Base
Bathrooms
25 articles
Accessible Bathroom Building Regs UK: Part M Guide
Approved Document M Cat 2/3, BS 8300:2018, grab rail 800N loading, non-slip flooring (PTV >36), Disabled Facilities Grant up to £30,000, OT assessment process
Accessible Bathroom Design UK: Doc M & Part M Guide
Accessible bathrooms: Doc M packs, Approved Document M turning circles, grab rail fixing, level-access showers, DFG grants
Basin Types UK: Which Fits Your Bathroom Space?
Pedestal vs semi-pedestal vs wall-hung vs countertop basin comparison: wall-hung frame loads (200kg+), Part G flow rates, BS EN 31, accessibility knee clearance
Bath Installation: Legs, Waste & Tiling Sequence Guide
Bath installation: cradle vs adjustable legs, waste testing before enclosure, tiling sequence, silicone at rim
Bathroom Extractor Fan: Sizing & Approved Document F Guide
Approved Document F 15 L/s intermittent or 8 L/s continuous, dMEV continuous extract, duct to outside (never roof void), 15-min overrun, BS 7671 zones, Vent-Axia/Greenwood/Manrose brands
Bathroom Floor Preparation: Levelling, Tanking & Falls UK
Bathroom floor preparation: levelling compound, tile backer boards, tanking, and wet room falls (1:80 minimum)
Bathroom Heating Options UK: Towel Rails & Underfloor
Electric/hydronic towel rails, UFH mats, infrared panels: IPX zone ratings, Lot 20 ErP, BS 7671 requirements, no gas fires in bathrooms rule
Bathroom Lighting Zones & IP Ratings: What Can Go Where?
Bathroom lighting zones 0/1/2 per BS 7671, IP rating requirements per zone, SELV requirements in zone 1
Bathroom Pod Installation Guide: Hotels & Student Housing UK
Steel-framed/GRP/concrete pods, 1.5-4 tonne weight, plinth support + crane install + service flying tails, 6-16 weeks factory lead, hotel/student/BTR sectors, MPBA + BMA bodies
Bathroom Refit Regulations UK: Planning & Building Control
Part P/G/F notification requirements, minimum space standards (BS 6465-1), Zone 0/1/2 electrical rules, wet room gradients, HMO standards
Bathroom Tiles Guide: Wall & Floor Selection BS 5385
Tile selection for bathrooms: porcelain vs ceramic, PTV slip resistance, zone classification, adhesive class selection (C2TE S1/S2), grout joint widths, large format handling
Bathroom Ventilation Building Regs Part F: Fan Sizing Guide
Bathroom ventilation: 15 l/s intermittent or 8 l/s continuous per Approved Document F, overrun timers, humidity control
Electric vs Mixer vs Digital Showers: UK Installation Guide
Shower comparison: electric (single-point), mixer (gravity/combi), digital; flow rates, water pressure requirements, installation differences
Freestanding Bath Installation: Plumbing & Floor Load Guide
Floor loading for cast iron baths (130–160kg + 200–250L water), waste outlet options, minimum water pressure (0.2 bar), WRAS-approved components
Heated Towel Rail Installation Guide: Sizing & Plumbing UK
CH/electric/dual-fuel types, 10-15% supplementary sizing, ΔT50 output reference, BS EN 442 specification, manual/TRV/designer valves, Part P notifiable, heat pump derating
How to Build a Wet Room: Tanking, Falls, Drainage & BS 5385
Wet room construction: tanking systems, drainage falls (1:80 minimum), waste positioning, BS 5385 substrate requirements
How to Waterproof a Bathroom Before Tiling: BS 5385 Guide
Tanking systems (BAL WP1, Mapelastic, Schluter Kerdi), BS 5385-1 recommendations, substrate preparation, corner tape, movement joints
Macerator & Saniflo Installation: UK Plumbing Regs Guide
BS EN 12050-3 pump standard, additional WC only (not sole WC) per Approved Document G, 4-5m max vertical lift, descale every 12 months, customer education on no wet wipes
Shower Screen and Enclosure Installation: Types and Sealing
Shower screen/enclosure setting out plumb, level, square on tanked tiled substrate; wet-side low-modulus neutral-cure silicone only, never both sides; bracing bars, glass safety; BS EN 14428, BS 6206/EN 12150
Shower Tray Installation: Bedding, Waste and Falls
Shower tray fully bedded to remove flex, set dead level (fall built in), 40mm waste with ≥50mm trap seal, sealed to tanking; riser kits, access; BS EN 14527, Part H, Part G
Toilet Types UK: Close-Coupled, Wall-Hung & Back-to-Wall
Toilet types: close-coupled, wall-hung (with frame), back-to-wall, concealed cistern — structural requirements, installation depths
Walk-In Shower Design: Falls, Drainage & Waterproofing
Walk-in Shower Installation UK: Trays, Falls & Regs
1200-1700mm trays, low-profile vs level-access, 8/10mm BS EN 12150 toughened glass, TMV2/TMV3 thermostatic mixer, R10/R11 slip resistance, 200-300mm walk-in entry
Wall-Hung and Back-to-Wall Toilets: Frames and Fixing
Wall-hung WC carrier frames (Geberit Duofix, Grohe Rapid SL) 400kg per EN 997, M12 studs, 390-430mm pan height, false-wall studwork spec, 110mm waste, 15mm inlet; Part G 6/4L dual-flush, BS 1212
Wet Room Installation Guide: Tanking, Falls & BS 5385-4
BS 5385-4 + BS 8000-11 tanking, 1:50 minimum fall (1:35 accessibility), Mapei/Wedi/Schluter Kerdi systems, R10/R11 slip resistance, BS 7671 Section 701, full Approved Document F ventilation