Summary
Solis inverters are among the most widely installed on UK domestic solar PV systems because of their price point and the broad range of single-phase string models (Mini 4G, S5, S6) and hybrid models (RHI, S5-EH1P, S6-EH1P, S6-EH3P) used with battery storage. The alarm scheme is shared across the range: a plain text label on the display and in SolisCloud, backed by a numeric code (1010, 1011 and so on) that is useful for support tickets but is not consistent between firmware versions or regional documentation. Diagnose from the text label and treat the number as a secondary reference.
Most Solis call-outs in the UK are grid-side. The UK statutory voltage range is 230 V +10 % / −6 % (216 to 253 V), and on a sunny afternoon in a street with several PV systems exporting, the local voltage at the inverter terminals can exceed 253 V. The inverter is required under G98 and G99 to disconnect at the stage-1 overvoltage setting of 262.2 V for 1 s (stage 2 at 273.7 V for 0.5 s), wait the reconnection delay, then reconnect. The customer sees lost generation and an OV-G-V01 alarm; the installation is behaving exactly as the grid code demands. Measuring and logging the AC voltage at the inverter, then reporting to the DNO, is the fix; raising the trip threshold is not permitted without DNO agreement.
The DC-side family is where safety lives. PV ISO-PRO means the inverter's pre-connection insulation test found the array's resistance to earth below the threshold (nominally 1 MΩ, in line with the BS EN 62446-1 commissioning minimum), and ILeak-PRO means the integrated residual-current monitor has seen leakage current above its limit while running. Early-morning dew, rain and condensation in a rooftop DC isolator cause both, and the alarm often clears by midday. When it does not, there is a damaged cable, a wet connector or a failing module junction box, and the array must be string-tested before the inverter is restarted. For the brand-agnostic version of this logic see solar inverter error codes.
Key Facts
- Where to read the alarm — on the inverter LCD (Advanced Info > Alarm Message), in the SolisCloud app or web portal (device > Alarms), and in the alarm history which keeps time-stamped events; always check the history for a pattern before diagnosing a single alarm.
- OV-G-V01 to OV-G-V04 — grid voltage above the stage-1 to stage-4 overvoltage limits for the selected grid standard; OV-G-V01 is a sustained overvoltage, OV-G-V02 and above are progressively shorter and higher thresholds. Frequent OV-G-V01 is a DNO voltage-rise issue.
- UN-G-V01 / UN-G-V02 — grid voltage below the undervoltage limit (G98/G99 stage 1: 184 V for 2.5 s); usually a supply fault, a loose AC terminal or a long undersized AC cable run.
- OV-G-F01/02 and UN-G-F01/02 — grid frequency outside limits (G98/G99: over-frequency 52 Hz for 0.5 s; under-frequency 47.5 Hz for 20 s and 47 Hz for 0.5 s). Genuine frequency excursions are rare in the UK; a persistent frequency alarm on a healthy grid usually means the wrong grid standard is selected.
- NO-Grid — no AC voltage detected: AC isolator off, MCB tripped, lost neutral, or a blown fuse in the generation meter circuit.
- G-IMP — grid impedance too high; the inverter cannot push current into a weak connection. Long AC cable runs, loose terminations or a corroded cut-out are the usual causes.
- GRID-INTF — grid interference; a transient on the AC side. Restart once; recurring GRID-INTF points to a power board fault.
- G-PHASE — three-phase inverters only; phase imbalance or a lost phase.
- PV ISO-PRO01 / PV ISO-PRO02 — DC insulation resistance to earth too low; 01 indicates the negative side, 02 the positive side. Threshold nominally 1 MΩ. Safety alarm; do not bypass.
- ILeak-PRO01 to 04 — residual (leakage) current above the limit, nominally 30 mA continuous with lower limits for sudden changes. Safety alarm; moisture or insulation damage.
- OV-DC01 / OV-DC02 — DC input voltage above the inverter's maximum (typically 600 V on single-phase models); a string with too many modules on a cold, bright morning when Voc rises.
- OV-BUS / UN-BUS — internal DC bus voltage out of range; usually an internal fault, occasionally a very low PV voltage at dawn.
- OV-TEM — internal temperature over the limit (about 90 °C single-phase, 115 °C three-phase); poor ventilation, direct sun, blocked heatsink, or a faulty temperature sensor.
- RelayChk-FAIL, DSP-B-FAULT, IGBT-OV-I, DC-INTF, INI-FAULT, Fan-FAIL — internal relay, processor, power-stage, DC overcurrent, initialisation and fan faults; restart once, then warranty.
- AFCI-Check / ARC-FAULT — on models with arc-fault detection, a DC series arc detected; inspect every connector before reset.
- Hybrid alarms — OV-Vbatt / UN-Vbatt (battery voltage out of range), CAN-FAIL (lost BMS communication), BatName-FAIL (battery model not selected), Meter-FAIL / No-Meter (export-limit meter not communicating).
- Grid standard setting — UK units must be set to G98 or G99 in Advanced Settings (installer password required); a unit left on a European or Australian standard trips on the wrong thresholds.
Quick Reference Table
Diagnosed the problem? Create a repair quote in minutes with squote.
Try squote free →| Alarm (display text) | Typical ID | Family | Likely cause in UK installs | First action |
|---|---|---|---|---|
| OV-G-V01 | 1010 | Grid | Local voltage rise above 262.2 V stage-1 limit | Log AC voltage at inverter; report to DNO if above 253 V regularly |
| OV-G-V02 to 04 | 1011–1013 (varies) | Grid | Short, higher overvoltage spikes | As above; check for loose AC terminations |
| UN-G-V01/02 | 1014–1015 (varies) | Grid | Undervoltage below 184 V, loose AC terminal, long run | Measure AC under load; check terminations and cable size |
| OV-G-F / UN-G-F | varies | Grid | Wrong grid standard; rare real frequency event | Confirm G98/G99 selected |
| NO-Grid | varies | Grid | AC isolator off, MCB tripped, lost neutral | Check AC path from cut-out to inverter |
| G-IMP | varies | Grid | High AC loop impedance | Measure Zs at inverter AC terminals |
| GRID-INTF | 1030 | Grid | AC transient / power board | Restart once; recurring = warranty |
| PV ISO-PRO01/02 | 1033 | DC safety | Insulation < 1 MΩ; moisture, damaged cable | Do not restart; string insulation test when dry |
| ILeak-PRO01–04 | 1034 | DC safety | Leakage > ~30 mA; wet isolator or connector | Do not restart; isolate strings one at a time |
| OV-DC01/02 | varies | DC | String Voc above inverter max on cold morning | Check string design against max input voltage |
| OV-TEM | 1032 | Internal | Over-temperature; ventilation, sun, fan | Clearances, shade, clean heatsink; sensor if persistent |
| RelayChk-FAIL | 1035 | Internal | Output relay self-test failed | Restart; warranty if it returns |
| DSP-B-FAULT | 1036 | Internal | Processor communication or firmware mismatch | Firmware check; warranty |
| OV-Vbatt / UN-Vbatt | varies | Hybrid | Battery outside voltage window | Check BMS, battery DC isolator, SOC limits |
| CAN-FAIL | varies | Hybrid | BMS comms lost | CAN cable pinout and termination; battery model selected |
Numeric IDs are shown as reported in current Solis service documentation; they differ between firmware versions and regional guides, so quote the text label in any support ticket.
Detailed Guidance
Decision tree
SOLIS INVERTER ALARM
=====================
1. Read the text alarm on the LCD or SolisCloud and open the
alarm history. One event, or a daily pattern?
2. Which family?
OV-G-V / UN-G-V / OV-G-F / UN-G-F / NO-Grid / G-IMP -> 3
PV ISO-PRO / ILeak-PRO -> 4
OV-DC / OV-BUS / UN-BUS -> 5
OV-TEM / Relay / DSP / IGBT / DC-INTF / Fan -> 6
Vbatt / CAN-FAIL / Meter -> 7
3. GRID
- Grid standard set to G98 or G99? (Advanced Settings)
NO -> set it; most frequency alarms vanish here
- Measure AC voltage at the inverter terminals, inverter
running, around midday:
> 253 V repeatedly -> DNO voltage-rise report
Big drop under load -> loose terminal, undersized or
long AC cable, high Zs (G-IMP)
0 V -> NO-Grid: isolator, MCB, fuse,
neutral
- Alarm only at peak sun on sunny days -> voltage rise,
not an inverter fault; export limitation may help
4. DC SAFETY (do not simply reset)
- Does it clear by late morning on a dry day?
YES -> moisture; find the entry point (roof DC isolator,
MC4s, module junction box) and reseal/replace
NO -> array fault
- Isolate DC. Test each string: Voc, then insulation
resistance PV+ to earth and PV- to earth at 1000 V
(>= 1 MΩ; a reading that falls while the test holds =
moisture). ISO-PRO01 points to the negative side,
ISO-PRO02 to the positive
- Inspect: rodent damage, abrasion on tile edges, cable
ties cut into insulation, water in the DC isolator
- Fix the cause, retest, then restart
5. DC VOLTAGE
- OV-DC: string Voc (modules x Voc at -10 °C) vs inverter
max input (commonly 600 V single-phase). Re-string if
the design is marginal
- OV-BUS / UN-BUS at dawn/dusk only -> usually benign;
persistent during the day -> internal, warranty
6. INTERNAL
- OV-TEM: 300 mm clearance each side, 500 mm above/below,
out of direct sun, heatsink clear; fan running?
- Others: power down AC then DC, wait 5 minutes, restart
once. Returns -> log serial number and firmware,
warranty claim via installer/distributor
7. HYBRID / BATTERY
- CAN-FAIL: correct battery model selected; CAN lead
pinout (Solis uses specific pins for different battery
brands); termination resistor
- OV/UN-Vbatt: battery BMS limits vs inverter settings;
battery DC isolator on; SOC and voltage in the app
- Meter-FAIL: RS485 wiring, meter address, CT direction
OV-G-V01 and UK voltage rise
This is the Solis alarm every UK solar installer sees most. The UK statutory limit at the customer's terminals is 253 V, and the G98/G99 stage-1 overvoltage protection the inverter must implement trips at 262.2 V after 1 s. Between those values the inverter keeps running but may see OV-G-V alarms as the voltage at its own terminals is higher than at the cut-out, because the inverter's export current raises voltage along the AC cable run. Check three things in order:
- Measure the AC voltage at the inverter AC terminals with the inverter exporting, and at the cut-out at the same time. A large difference means AC cable volt drop; shorten the run, increase the CSA, or tighten terminations.
- Log the voltage over several sunny days. SolisCloud records grid voltage; a pattern of alarms between 11:00 and 15:00 on clear days is network voltage rise.
- Report to the DNO. The DNO is obliged to keep the supply within statutory limits and can retap the local transformer. Export limitation via a meter and the inverter's export-power setting is a workaround, not a fix, and should be agreed with the customer because it loses them generation. The inverter's own overvoltage thresholds must not be raised without written DNO consent. See dno g98 g99 applications.
PV ISO-PRO and ILeak-PRO: the safety branch
Both alarms mean the DC side has lost its separation from earth. On a dry day with the inverter isolated, perform the BS EN 62446-1 insulation test string by string: positive to earth and negative to earth at 1000 V DC, held for one minute; the pass figure is 1 MΩ. A reading that starts high and falls during the test indicates moisture tracking rather than a hard fault. Common UK findings are water inside a rooftop DC isolator (the most frequent), MC4 connectors left unmated or mated to a different manufacturer's part, cable insulation cut by a tile edge or a cable tie, and a cracked module junction box. Repair, retest and only then restart. Record the readings on the test certificate; see solar pv fault finding for the wider array fault-finding method and solar pv earthing and bonding for the earthing arrangement the test assumes.
OV-TEM and installation clearances
Solis specifies free air clearance around the inverter and derates output above its rated ambient. An inverter in a south-facing loft at 45 °C, a cupboard with no airflow, or mounted directly above a hot-water cylinder will throttle and eventually raise OV-TEM. Keep roughly 300 mm clear each side and 500 mm above and below, out of direct sun, with the heatsink fins vertical and clean. Fan-cooled models should be audible under load; a silent fan on a hot unit is a Fan-FAIL even if that alarm has not yet appeared. If clearances and airflow are correct and the unit still reports OV-TEM at modest load, the temperature sensor or its connection is suspect.
Hybrid-specific alarms
On RHI and S5/S6-EH hybrids the battery communicates over CAN. CAN-FAIL after a firmware update, a battery swap or a new installation is almost always the battery model setting or the CAN lead: Solis uses different RJ45 pin pairs depending on the battery brand selected, and a lead made for one brand will not talk to another. OV-Vbatt and UN-Vbatt indicate the battery pack voltage is outside the inverter's configured window, which can be a genuine BMS protection event (cold battery, cell imbalance) or a mismatch between the inverter's battery settings and the pack. Meter-FAIL on an export-limited system stops generation on some firmware, so check the RS485 meter wiring and the CT direction first. See solar battery storage installation.
What to charge
| Job | Typical UK price (ex VAT) |
|---|---|
| Diagnostic visit, alarm history review, AC/DC measurements | £80–£150 |
| Grid standard correction and recommissioning | £80–£120 |
| String insulation test, DC isolator replacement, reseal | £150–£300 |
| AC cable termination repair and Zs test | £90–£160 |
| Inverter warranty swap (labour only) | £150–£250 |
| Replacement 3.6 kW single-phase string inverter, supplied and fitted | £650–£1,000 |
| Replacement 5 kW hybrid inverter, supplied and fitted | £1,200–£1,900 |
See solar pv installation pricing guide for whole-system pricing.
Frequently Asked Questions
The alarm says OV-G-V01 every sunny afternoon but the system works in the morning. Is the inverter faulty?
Almost certainly not. The inverter is disconnecting because the local grid voltage exceeds the G98/G99 overvoltage limit when several nearby systems export at once. Measure and log the voltage, then report to the DNO. Do not raise the trip threshold.
Can I just reset a PV ISO-PRO alarm?
The inverter will retest insulation on every start-up, so resetting does nothing harmful in itself, but the alarm means the array has a path to earth. If it does not clear once the roof is dry, isolate and test each string before anyone works near the DC side. Leaving an array with low insulation resistance live is a shock risk under BS 7671:2018+A2:2022 Section 712.
Which grid standard should a UK Solis be set to?
G98 for systems up to 16 A per phase (3.68 kW single-phase) and G99 for larger systems, matching the DNO notification or application made for the installation. The setting is in Advanced Settings behind the installer password. A wrong standard causes nuisance voltage and frequency trips.
Why does the numeric code in SolisCloud not match the list in the manual?
Solis has changed the numeric mapping between firmware generations and regional documents, so 1011 may be UN-G-V01 in one list and OV-G-V02 in another. The text label is stable; use it for diagnosis and quote it, with the serial number and firmware version, in any support ticket.
Does an OV-DC alarm mean the inverter is damaged?
Not necessarily. It means the string open-circuit voltage exceeded the inverter's maximum input, which happens on cold, bright mornings when module Voc rises. Recalculate the string at −10 °C; if it exceeds the inverter maximum, the string must be shortened. Repeated OV-DC events can eventually damage the input stage.
Regulations & Standards
Engineering Recommendation G98 — connection of fully type-tested micro-generators up to 16 A per phase: protection settings (overvoltage 262.2 V / 1 s stage 1, 273.7 V / 0.5 s stage 2; undervoltage 184 V / 2.5 s; frequency 47.5 Hz / 20 s, 47 Hz / 0.5 s, 52 Hz / 0.5 s) and reconnection delay.
Engineering Recommendation G99 — connection of generation above G98 limits; same protection philosophy with DNO-agreed settings.
BS 7671:2018+A2:2022, Section 712 — solar PV power supply systems: DC isolation, insulation and protection against electric shock.
BS EN 62446-1 — grid-connected PV systems: documentation, commissioning tests and inspection, including the 1 MΩ insulation resistance test.
BS EN 62109-1 / BS EN 62109-2 — safety of power converters for use in PV systems (the standard Solis inverters are certified to).
Electricity Safety, Quality and Continuity Regulations 2002 — the statutory 230 V +10 % / −6 % supply voltage limits behind OV-G-V alarms.
MCS Installation Standard MIS 3002 — requirements for MCS-certified PV installation and commissioning.
Building Regulations Part P — the AC connection of the inverter is notifiable electrical work.
Solis Service Centre — Full alarm code maintenance overview — official alarm list with troubleshooting steps.
Solis — PV Isolation Protection: causes, troubleshooting and preventative measures (PV ISO PRO 01/02) — insulation alarm guidance and test method.
Solis — I-Leak-Pro or leakage current (1034) — residual current alarm causes.
Solis — OV-G-V alarm — grid overvoltage explanation.
Energy Networks Association — G98 and G99 Engineering Recommendations — UK grid connection protection settings.
IET — Code of Practice for Grid-connected Solar Photovoltaic Systems — Section 712 application and commissioning practice.
solar inverter error codes — brand-agnostic inverter fault categories and other manufacturers' code families.
solar pv not generating — zero or reduced output diagnosis when no alarm is shown.
solar pv fault finding — array-side fault-finding method and string testing.
dno g98 g99 applications — G98/G99 notification and DNO voltage-rise reporting.
solar pv earthing and bonding — earthing arrangement assumed by the insulation test.
solar battery storage installation — hybrid inverter and battery commissioning.