Fence posts are the part of a fence that does all the work and gets none of the attention. Panels are replaced when they blow out, but a leaning fence is nearly always a post problem, and a new panel hung between two tired posts will be back on the ground after the next winter storm. The first job on a leaning-fence call is to diagnose the posts: how many have gone, why, and whether they can be rescued or must come out.
Timber posts fail at ground level, where the wood is alternately wet and dry and oxygen is still available to the fungi that cause decay. A post can look perfect above ground and be reduced to a soft brown stump 50 mm below the surface. Concrete posts fail differently: they crack and spall when the reinforcement rusts, they snap at ground level under a hard side load, and they lean when their footing was never adequate. Both types lean when the footing is too shallow, when the hole was backfilled with soil rather than concrete, or when the ground is soft and permanently wet.
This article covers how to diagnose the failure, when a repair spur is a sensible repair and when it is a false economy, how to set a new post so it does not lean in five years, and the choice between post-mix, site-mixed concrete and driven spikes. For post depth calculations see fence post depth and fence post installation depth; for the full replacement method see fence repair replacing posts; for height and boundary rules see planning permission fences walls.
Key Facts
- Where timber posts rot — at and just below ground level, in the 100–150 mm band where moisture, oxygen and soil fungi coincide; a post buried in permanently wet soil below that band often survives longer than the collar.
- Service life — pressure-treated softwood posts to Use Class 4 (BS EN 335:2013) are typically guaranteed 15 years in ground contact; untreated or Use Class 3 timber can fail in 3–5 years. Many cheap "treated" posts are only Use Class 3 (above-ground) and are not suitable for setting in the ground.
- Post sizes — 75 × 75 mm for low fences under 1.2 m in sheltered gardens; 100 × 100 mm for standard 1.8 m panel or close-board fences; 125 × 125 mm or 150 × 150 mm for gates, exposed sites and fences over 1.8 m.
- Depth — minimum 600 mm in the ground for a 1.8 m fence; the usual rule is one-third of the above-ground height, so a 1.8 m fence uses a 2.4 m post. Exposed sites and soft ground: deeper, not wider.
- Hole size — around three times the post width, so 300 mm for a 100 mm post, with concrete fully surrounding the post and finished with a slope away from the timber to shed water.
- Concrete — a C20/C25 mix (1:2:4 cement:sand:aggregate by volume, or ST4/GEN3 to BS 8500-2) or a proprietary post-mix; post-mix sets in 5–10 minutes but gives a weaker, smaller footing per bag, so use two bags for a 100 mm post at 600 mm depth, not one.
- Repair spur — a reinforced concrete spur about 1,000 mm long, set 600 mm into fresh concrete alongside the stump and bolted through the sound post above the rot with two M10 or M12 coach bolts; only worth doing if the post is sound 300 mm or more above ground.
- Metal repair spikes and sleeves — a galvanised steel box or spike driven beside the rotted post and bolted to it; quick and acceptable for lightweight fences, but they bend in exposed locations and offer no fix for a failed footing.
- Wind load — a solid 1.8 m close-board fence in an exposed location can see a design wind pressure of 0.6–1.0 kN/m² under BS EN 1991-1-4; each 1.8 m bay can transfer over 1 kN of lateral force to each post. Hit-and-miss or slatted boards reduce this substantially.
- Concrete posts — slotted posts are usually 100 × 100 mm or 125 × 100 mm reinforced with four 6–8 mm bars; cracking along a corner with rust staining means the bars are corroding and the post will eventually snap. They cannot be repaired; they are replaced.
- Gravel boards — a 150 mm concrete gravel board keeps the panel bottom out of the soil and is the single biggest factor in panel life; a fence without one rots from the bottom rail up.
- Leaning in clay — shrinkable clay dries and cracks in summer, leaving the footing loose, and swells in winter; posts in clay need deeper, well-compacted footings and benefit from a 50 mm gravel bed under the post to drain the hole bottom.
- Boundary ownership — there is no legal rule that the "good side" faces the neighbour or that the posts mark ownership; check the title plan T-marks and the deeds before replacing a shared fence, and get the neighbour's agreement in writing if the new posts will sit on or over the line.
- Permitted height — up to 2 m anywhere, up to 1 m where adjacent to a highway used by vehicles, without planning permission; higher needs an application. Listed buildings and some conservation areas (Article 4 directions) may restrict fences.
- Cost — repair spur fitted: 1–1.5 hours, £60–£120 per post including materials; new 100 × 100 mm treated post concreted: 1–2 hours each, £90–£160; concrete slotted post replacement with panel refitted: £120–£220 per post; a full 6-bay fence replacement with concrete posts and gravel boards: 1–2 days, £900–£1,600.
Quick Reference Table
Diagnosed the problem? Create a repair quote in minutes with squote.
Try squote free →| Symptom | Push test | Diagnosis | Repair |
|---|---|---|---|
| Post leans, flexes at ground level, soft timber at base | Post moves, footing does not | Rot at the collar | Repair spur if sound above 300 mm; else replace |
| Post and footing rock together as a unit | Whole lot moves | Footing too shallow/small, or soil backfill | Dig out, deepen, reconcrete |
| Several posts in a row leaning the same way | Varies | Wind load exceeds design; shallow footings | Replace with larger/deeper posts; reduce panel solidity |
| Concrete post cracked along a corner, rust stains | May be rigid still | Reinforcement corrosion | Replace post |
| Concrete post snapped at ground level | — | Side impact or wind; weak section | Replace post |
| Post leans only after heavy rain, recovers | Movement only when wet | Waterlogged ground, no drainage | Deepen footing, gravel bed, drainage |
| Post leans in summer, straightens in winter | Seasonal | Shrinkable clay | Deepen footing below 750 mm, compacted concrete |
| Post sound but panel pulling it over | Post firm, panel loose | Panel fixings failed, panel acting as sail | Refix panel; consider clips/gravel board |
| Post rotted at top, sound at base | Rigid | Water ingress at cut end | Fit post cap; cut and cap if needed |
| Timber post twisted/warped | Rigid | Unseasoned timber | Replace if panels no longer fit; otherwise leave |
Detailed Guidance
Diagnosing the lean
LEANING FENCE POST — DIAGNOSIS
│
├─ 1. Push the post firmly at the top, both directions.
│
│ ├─ Post flexes or hinges at ground level; footing stays still
│ │ → ROT (timber) or SNAP (concrete) at the collar.
│ │ ├─ Probe the base with a screwdriver. Soft, wet, brown? Rot.
│ │ ├─ Sound timber 300 mm+ above ground? → Repair spur viable.
│ │ └─ Rot runs up the post or post is concrete? → Replace.
│ │
│ └─ Post and footing move together
│ → FOOTING FAILURE.
│ ├─ Dig a test hole at the side. How deep is the concrete?
│ │ < 450 mm → too shallow. Was the hole backfilled with soil? Common.
│ ├─ Ground waterlogged or soft clay? → drainage/depth issue.
│ └─ Footing OK but whole run leaning? → wind overload; fence design.
│
├─ 2. Check every post in the run, not just the obvious one.
│ One leaning post is often two or three on the way out.
│
└─ 3. Check the panels. A panel acting as a sail, or a gate slammed by wind,
loads posts far beyond their design. Fix the cause with the post.
Check all the posts in the run, because the loads redistribute: when one post goes, its neighbours pick up the load and start to fail. Quoting for one post and finding three on the day is a common misquote. Probe each post at ground level with a screwdriver on all four faces; sound treated softwood resists the point, rotted wood takes it in with little pressure. Dig a small hole on the lee side of a leaning post to see how deep the concrete is and whether there is any; many fences are set in a few inches of concrete over soil backfill, or in no concrete at all.
Repair spur: when it is worth it
A concrete repair spur is a reinforced concrete section, typically 1,000 mm long and 75–100 mm square, with two bolt holes near the top. The rotted base of the post is left in the ground (or cut off at ground level), a new hole is dug alongside to about 600 mm, the spur is set in concrete against the sound part of the post with its top around 400 mm above ground, and two coach bolts clamp the post to the spur. It is a good repair when:
- the post is sound for at least 300 mm above ground, so the bolts bite into solid timber;
- the footing problem was rot rather than a shallow or soft footing (the spur gets its own new 600 mm footing, so it fixes shallowness too);
- the fence is a standard 1.8 m panel or close-board fence, not a gate post or a heavily exposed run;
- the customer accepts the look: a concrete stub against a timber post.
It is a poor repair when the post is also rotting higher up, when the post is undersized for the fence, when the ground is so soft that the spur will lean too, or when the fence is at the end of its life anyway and the panels will need replacing within a few years. In those cases the labour on the spur is better spent on a new post.
Steel repair spikes and sleeves (driven or bolted beside the post) are quicker and need no concrete, but they rely on the ground to hold them and bend under sustained wind load on a solid fence. They suit lightweight picket and trellis fences and temporary fixes.
Replacing a post
- Free the panels. Unclip or unscrew the panels either side; with slotted concrete posts, lift the panels out. Support the adjacent panels on blocks.
- Get the stump out. Dig around the footing to its base. A post with a big concrete footing may need the footing breaking out with a breaker, or lifting out with a post puller, lever and fulcrum, or a farm jack. Do not leave the old concrete in the hole and try to set the new post beside it.
- Dig the new hole. Minimum 600 mm deep for a 1.8 m fence and about 300 mm across for a 100 mm post. Go to 750 mm in exposed sites, soft ground or shrinkable clay. Place 50 mm of compacted gravel at the bottom so the post end is not sitting in water.
- Set the post. Stand the post, plumb it on two faces, brace it with battens, and check its line with a string from post to post. Keep the post bottom 50 mm off the hole base on the gravel so water drains away from the end grain. Concrete should surround the post fully; a post with concrete on one side only will lean towards the soil side.
- Concrete. Either a site mix (1:2:4 cement:sharp sand:20 mm aggregate, fairly stiff) rammed in layers, or post-mix poured dry around the post and watered as the manufacturer directs. Finish the top above ground level and slope it away from the post so water runs off rather than pooling against the timber. Leave post-mix 30–60 minutes and site mix 24 hours before hanging panels.
- Protect the timber. Treat any cut end with a preservative end-grain treatment, fit a post cap to the top, and keep soil and gravel board away from direct contact with the post face where possible.
- Rehang. Fit gravel boards, then panels with galvanised or stainless clips or 50 mm screws, keeping the panel bottom off the ground.
Concrete slotted posts are set the same way, usually at 600–750 mm depth, with the slot aligned so the panels drop in. They are heavy (a 2.4 m slotted post is around 40 kg) and take two people. Do not try to straighten a leaning concrete post by levering it; the footing is the problem and must be redone.
Concrete, post-mix or spike?
Site-mixed concrete gives the largest, strongest footing for the money and is the right choice for anything exposed, for gates, and for runs of several posts. A C20-equivalent mix at 1:2:4 with a low water content, rammed in layers, is adequate; ready-mixed bags of "general purpose" concrete are the same thing pre-batched. It needs 24 hours before loading, so posts are set one day and panels hung the next.
Post-mix (rapid-set) concrete sets in minutes and lets a single post be replaced and the panels rehung in one visit. The trade-offs are cost per litre and strength: one 20 kg bag makes about 10 litres, and a 300 mm × 600 mm hole around a 100 mm post needs about 35 litres, so budget three bags for a proper footing, not one. Single-bag footings are the reason so many post-mix repairs lean within a couple of years.
Driven spikes (a steel socket on a 600–750 mm spike hammered into the ground) avoid digging and concrete, but they are only as good as the ground they are driven into. In firm, stony or clay ground they hold a light fence well; in soft or sandy soil they work loose. They are not suitable for solid close-board fences over about 1.2 m in exposed locations, or for gate posts.
Bolt-down shoes on an existing concrete base are for posts on a patio or slab, not for garden fences; they rely on the slab's weight and a 1.8 m solid fence will pull a thin slab up.
Reducing the wind load
Where a run of posts has leaned together, the fence is seeing more wind than the posts can resist. The options, in order of cost, are: swap solid panels for hit-and-miss, slatted or trellis-topped designs that let air through; increase post size to 125 × 125 mm and depth to 750 mm; shorten the bays (1.5 m rather than 1.8 m) so each post carries less area; or add a diagonal brace or a second post at the ends and at changes of direction. On a very exposed boundary a 1.8 m solid fence may simply not be a sensible design, and a 1.5 m fence with a trellis top will stand where the 1.8 m one keeps falling.
Frequently Asked Questions
How deep should a fence post go?
A third of its above-ground height, with a minimum of 600 mm. For a standard 1.8 m fence that means a 2.4 m post with 600 mm in the ground. Go deeper (750 mm) in exposed positions, in soft or waterlogged ground, in shrinkable clay, and for gate posts, which take dynamic loads every time the gate swings or slams. Depth matters more than hole width: a 600 mm × 300 mm footing resists overturning far better than a 400 mm × 450 mm one with the same concrete volume.
Can a repair spur be used on a concrete post?
No. A cracked or snapped concrete post cannot be clamped to a spur in any way that restores its strength, and the usual failure (reinforcement corrosion) continues inside the post. Replace it. Concrete posts that lean because of a failed footing are dug out and reset; do not try to lever them upright and pack the hole.
Why does the post rot at ground level when the bottom of it is fine?
Decay fungi need moisture, oxygen and a food source. Below about 150 mm the soil is often too wet and short of oxygen for the fungi to thrive; above ground the post dries between rains. The band at and just below the surface is wet enough and aerated enough for rot to run fast. That is why repair spurs work: the post below is often sound and can be left, and the post above the collar is dry enough to bolt to. Finishing the concrete with a slope so water runs away from the post, and keeping soil and mulch away from the timber, slows it down considerably.
Do I need the neighbour's permission to replace the fence?
If the fence is on your customer's land and shown on their title as theirs, no, but good practice is to tell the neighbour, especially if access to their side is needed to work. If the fence is a shared boundary feature or ownership is unclear, agree it in writing first, because digging out a post on the neighbour's side of the line without consent is a trespass and a frequent cause of dispute. The deeds and the title plan (Land Registry, £7 for a copy) usually show T-marks indicating responsibility; the absence of a T-mark does not prove anything.
Is planning permission needed for a new fence?
Not for a fence up to 2 m high, or up to 1 m where it fronts a highway used by vehicles, under Schedule 2, Part 2, Class A of the General Permitted Development Order 2015 (England; Wales and Scotland have their own equivalent orders). Anything taller needs an application, as does any new fence around a listed building. Replacing a fence with one of the same height is maintenance and does not need permission. Some new housing estates have covenants restricting front garden fences entirely; check the deeds.
Regulations & Standards
Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 2, Class A — gates, fences, walls and other means of enclosure: the 2 m / 1 m height limits.
BS 1722-5:2006 — Fences: specification for close-boarded fences and wooden palisade fences (post sizes and spacings).
BS 1722-11:2006 — Fences: specification for prefabricated wood panel fences.
BS EN 335:2013 — Durability of wood and wood-based products: use classes; Use Class 4 for timber in ground contact.
BS 8417:2024 — Preservation of wood: code of practice; treatment levels for ground-contact posts (supersedes BS 8417:2011+A1:2014).
BS 8500-1:2023 and BS 8500-2:2023 — Concrete: complementary British Standard to BS EN 206; designated and standardised prescribed mixes (GEN/ST) for footings.
BS EN 1991-1-4:2005+A1:2010 — Eurocode 1: wind actions; the basis for wind pressure on fences.
Party Wall etc. Act 1996 — does not generally apply to fences, but applies to garden walls built astride a boundary.
Construction (Design and Management) Regulations 2015 — applies to all construction work including domestic fencing; manual handling of concrete posts.
Manual Handling Operations Regulations 1992 — relevant to lifting 40 kg concrete posts and bags of concrete.
Planning Portal — Fences, gates and garden walls — permitted development limits for fences.
GOV.UK — The Town and Country Planning (General Permitted Development) (England) Order 2015 — Schedule 2 Part 2 Class A.
Wood Protection Association — Use Class guidance — treated timber use classes for ground contact.
TDCA — Timber Decking and Cladding Association: post and ground-contact guidance — treated timber in ground contact.
HM Land Registry — Boundaries: practice guide 40 — boundary responsibility and T-marks.
HSE — Manual handling at work — handling heavy posts and materials.
fence repair replacing posts — the step-by-step replacement method and post removal techniques.
fence post installation depth — depth and footing specifications by fence height and ground type.
fence post depth — working out post length and concrete quantities.
planning permission fences walls — height limits, highways and listed buildings.
fence panel replacement pricing guide — pricing panel and post replacement.
fence panel quantity calculator — panels, posts and gravel boards for a run.