Summary

Laminate is cheap to lay and expensive to lay badly, because the faults do not appear on the day. A floor laid in October with the skirting nailed down tight over it looks fine until June, when the planks have taken on moisture, grown 5 mm across a 4 m room and have nowhere to go, and a ridge appears across the middle. A floor laid over a slab that was not flat looks fine until the family has walked on it for six months and the joints over the hollows have worked loose and started to click and gap. The customer blames the laminate; the laminate is usually fine.

Nearly every laminate fault traces to one of four installation errors: no expansion gap or a gap that has been bridged, a subfloor out of tolerance, moisture in the subfloor or the planks, or joints not fully engaged. A fifth, water damage from a leak or mopping, shows as swollen edges and is not repairable. The diagnosis takes a straightedge, a moisture meter and ten minutes under the skirting. The fixes range from trimming the beading to lifting the floor and levelling the slab. This guide gives the diagnosis sequence, the four causes with the evidence for each, the repairs with time and cost, and the installation rules that stop it happening again. For the installation method see laminate flooring installation guide; for subfloor testing see moisture testing floors.

Key Facts

Quick Reference Table

Diagnosed the problem? Create a repair quote in minutes with squote.

Try squote free →
Symptom Likely cause Evidence Fix
Ridge or peaked joints across the room, worse in summer Expansion gap closed or bridged Lift beading: planks touching skirting or pipe collar Cut back to 10 mm; free the fixed point; relay the ridge
Floor lifting at one wall or in a doorway Door bar or threshold pinning the floor Bar screwed through planks Refit the bar to the subfloor only, or use a clip-in profile
Whole floor domed, edges swollen Moisture from the slab (no DPM) or flooding Cupped planks; high RH reading Lift; dry; new DPM; relay with new boards
Soft or drumming spot; joints clicking Subfloor hollow or thick underlay Straightedge shows 3 mm+ dip Lift section; level with compound; relay with thin underlay
Bounce everywhere, floor moves underfoot Flexing timber subfloor Feel for joist deflection; look below Screw down; overboard with ply; then relay
Gaps opening at the short ends in winter Shrinkage after wet laying, or joints not clicked Gap widens with heating season Pull together with a pull bar; add a fixed point at one wall only; relay if widespread
Gaps that do not change with season Joints never engaged Even gaps, not seasonal Lift and relay from the gap
Edge swelling along a run near a kitchen or radiator Water ingress Soft, raised edges Replace planks; find and fix the leak
Planks lifting at a kitchen plinth Plinth or unit legs screwed through the floor Screws through laminate Remove screws; cut the floor back under the plinth

Detailed Guidance

Diagnostic sequence

LAMINATE FLOOR FAULT
│
├─ LIFTING / PEAKING
│   ├─ Lift the beading or skirting at two walls. Is there an 8–10 mm gap?
│   │   ├─ No: planks hard against wall/pipe/door bar ──► EXPANSION: cut back; free fixed points
│   │   └─ Yes ──► check for pinning: door bars, plinth screws, glued pipe collars
│   ├─ Planks cupped, edges up, floor domed? ──► MOISTURE FROM BELOW: hygrometer; DPM; relay
│   └─ Localised swelling, soft edges? ──► WATER DAMAGE: find leak; replace planks
│
├─ BOUNCING / DRUMMING
│   ├─ Straightedge 2 m across the spot: dip over 3 mm? ──► SUBFLOOR: level and relay
│   ├─ Underlay thicker than 3 mm or crushed? ──► UNDERLAY: relay on 2–3 mm high-density
│   └─ Whole floor moves; joists below? ──► TIMBER SUBFLOOR: screw/overboard
│
└─ GAPPING
    ├─ Gaps come and go with the seasons? ──► SHRINKAGE: laid wet or no acclimatisation
    ├─ Gaps constant since laying? ──► JOINTS NOT ENGAGED: pull up and relay
    └─ Gaps only at a doorway or under a heavy unit? ──► PINNING: floor dragged by a fixed point

Lifting and peaking: find the fixed point

Take the scotia or lift the skirting at the two walls nearest the lift and at any pipe. The planks should stop 8–10 mm short of the wall; if they touch it, the floor has nothing to expand into and the lift is the result. Look for the other ways a floating floor gets pinned: a door bar screwed down through the planks rather than into the subfloor between them, a radiator pipe collar glued to the pipe and the floor, kitchen plinth clips or unit legs screwed through the laminate, a fitted wardrobe standing on it, a heavy stop bead nailed through. A floor pinned at one side moves twice as much at the other.

Fix the cause before the symptom. Cut the planks back with a multi-tool to leave 10 mm at every wall and 10 mm radius clearance at pipes, remove the screws through the floor and refit the bar or the plinth to the subfloor, and replace a glued collar with a loose one. Then relieve the ridge: on a click floor, taking the pressure off is often enough for it to settle over a week, but a peaked joint that has been forced may have broken the tongue and needs the two planks lifted and replaced. Anything over 8 m should have had an expansion profile; retrofitting one means cutting a 20 mm strip out across the room and fitting a T-profile, which is half a day and sometimes the only answer in a long hall or an open-plan room.

Moisture: from the slab, the air or a leak

Cupping, a domed floor and swollen edges along every joint mean water has got into the HDF core, and the question is where from. A ground-floor slab with no damp-proof membrane under the underlay, or an underlay without an integral DPM, lets vapour through year-round, and the floor swells from below. Test the slab with an insulated hood hygrometer left for 72 hours: a reading over 75% RH confirms it. A floor laid on a slab that was poured three weeks earlier fails the same way. The repair is to lift the floor (most of it will be scrap), let the slab dry or apply a surface DPM, lay a 1,000-gauge polythene DPM or a DPM underlay with taped joints turned up at the walls, and relay with new boards.

Swelling in one area, especially near a kitchen, a bathroom door or a radiator, is a leak or wet mopping, and the planks are finished. Find the water first; see dishwasher leaking and washing machine leaking for the usual culprits. Laminate is not a wet-room product and a floor washed with a soaking mop every week will swell at the joints within a year.

Bouncing: the subfloor and the underlay

Lay a 2 m straightedge across the soft spot in two directions. A dip you can slide a 3 mm packer under is outside the tolerance and the planks are bridging it; every footstep flexes the click joints and in time they open and start clicking. The common culprits are a slab with a hollow where a wall was removed, a chipboard floor with a sag between joists, old floorboards with cupped edges, and a thick foam underlay that has compressed under traffic. Soft "comfort" underlays over 3 mm, and two layers of underlay over an old one that was never lifted, cause bounce by themselves.

Lift the planks back to the affected area (click floors can be unzipped from the last row, but tongues break, so allow for 10–15% replacement), check the underlay and the subfloor, and level: self-levelling compound over a primed slab for a hollow, a feather finish for a shallow dip, 6 mm plywood screwed at 150 mm centres over boards, or screwing down loose chipboard and filling joints. Relay on a 2–3 mm high-density underlay. A timber floor that flexes at the joists needs the joists looked at, not the finish; see subfloor preparation guide and floor levelling compounds.

Gapping: shrinkage and unlocked joints

Gaps that open in the heating season and close in summer mean the boards were laid with more moisture than the room's equilibrium: not acclimatised, laid in a damp new build, or in a house that was unheated when they went down. Seasonal gaps of 1–2 mm are a cosmetic problem the customer can live with or that can be improved by pulling the floor together with a pull bar from one wall and fitting a stop at that wall only (a bead of flexible adhesive under the first row is a common trick), leaving the other walls free. Widespread gapping on a floor that was laid wet will keep moving and relaying is the honest answer.

Gaps that have been there since the floor was laid and do not change are joints that were never clicked fully home: the fitter did not tap the short ends, or a wedge of underlay or grit sat in the joint. A single gap can be pulled closed with a pull bar from the nearest wall if the planks between it and the wall are free; more than a few means lifting back to the first gap and relaying with a tapping block on every short edge. Check the long-edge angle: most systems click at 20–30° and a plank pushed in flat is only half engaged.

Repairs, time and cost

Repair Time Typical charge (2026)
Diagnosis, lift beading, cut back expansion gap, refit beading, one room 1–2 h £90–£180
Refit a door bar or threshold to the subfloor 30 min £40–£80
Retrofit an expansion profile across a long room 2–4 h £120–£240
Lift a section, level a hollow, relay (2–4 m²) 3–5 h £180–£350 plus compound
Replace water-damaged planks (4–6 planks, matching stock available) 2–3 h £120–£220
Lift, DPM, relay a 20 m² room with new laminate 1.5–2 days £400–£700 labour plus £300–£600 materials
Overboard a timber subfloor with 6 mm ply, 20 m², then relay 1 day plus relay £350–£600 plus ply

Make the quote conditional on matching planks being available (manufacturers change ranges every two or three years) and on what the straightedge and the hygrometer find under the first lifted section. See laminate flooring fitting pricing guide.

Laying it so it does not come back

Acclimatise 48 hours in the heated room. Test the slab for moisture and lay a DPM or DPM underlay with taped joints. Check flatness with a 2 m straightedge and level anything over 3 mm. Use a 2–3 mm high-density underlay, one layer. Leave 10 mm at every wall, pipe, frame and unit, and 12–15 mm or an expansion profile in rooms over 8 m. Fix skirting and beading to the wall, never through the floor. Fit door bars to the subfloor with the floor free underneath. Tap every short edge home. Do not screw anything through it afterwards and tell the customer not to. See laminate flooring installation guide.

Frequently Asked Questions

Can a laminate floor that has lifted go back down?

If the lift is expansion against a fixed point and the tongues have not broken, yes: free the floor and it usually settles within a week or two as the pressure comes off. If the ridge has been walked on for months the click joints at the peak are likely cracked and those planks need replacing. If the lift is moisture swelling, the boards have grown permanently and will not go back.

The fitter left a gap. Why has the floor still lifted?

Because something else is pinning it. The usual culprits are a kitchen plinth or unit legs screwed through the floor, a threshold bar fixed through the planks, a pipe collar glued down, or heavy fitted furniture on one side. A floor pinned on one side moves all its expansion to the other side and closes a 10 mm gap that was adequate. Find the fixed point.

Is it the laminate's fault? Can the customer claim on the warranty?

Manufacturers' warranties exclude installation faults (gap, subfloor, moisture) and water damage, which between them cover nearly every failure. A genuine product fault (delamination of the wear layer, joints that break under normal use) is rare and would show across the whole floor. Be straight with the customer: if the gap is closed or the slab is wet, it is the installation, and the claim is against the installer.

Can I fix a bouncy spot by injecting something under the floor?

Injection products exist for solid floors with a void under a bonded finish; they are not a fix for a floating laminate over a hollow, because the laminate is not bonded to anything and the void is under a compressible underlay. Lift the section and level the subfloor. A bounce over joists is the joists.

Does underfloor heating cause laminate to gap?

It can if the floor surface runs over 27°C, the underlay is thick (thermal resistance over 0.15 m²K/W) or the heating was turned on full the day the floor went down. Boards dry out and shrink, and the gaps appear within the first heating season. Run the system at a low flow temperature for the first week, keep the surface below 27°C, use a UFH-rated underlay, and acclimatise the boards with the heating on.

Regulations & Standards