DPC in Brickwork: Types, Heights and Building Regulations Requirements

Quick Answer: A continuous damp-proof course (DPC) is required in all external walls at a minimum height of 150mm above external ground or paving level, under Approved Document C. Use polyethylene (PE) or bitumen DPC to BS 6515 in new construction; for below-ground work and high hydrostatic pressure, use engineering brick or tanked construction. The DPC must be continuous across the full wall width and cavity, lapped at joints, and never bridged by soil, render, or paving.

Summary

The damp-proof course is one of the most fundamental waterproofing details in UK masonry construction. A correctly installed DPC stops ground moisture rising through the masonry wall by capillary action — the mechanism known as rising damp. Pre-1920s buildings were often built without a DPC, which is why rising damp is such a common problem in Victorian and Edwardian properties.

Building Regulations Approved Document C requires a DPC in all new construction where walls are in contact with the ground. The standard residential DPC is a continuous impermeable membrane at least 150mm above external ground level — high enough to prevent rain splash-back from saturating the wall below the DPC. In cavity wall construction, both the inner and outer leaves require separate DPCs; a cavity tray is also needed above any openings.

This article covers DPC installation in new brickwork. For treatment of failed or absent DPCs in existing buildings, see dpc replacement.

Key Facts

Quick Reference Table

Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.

Try squote free →
DPC Type Standard Typical Use Min Width
Polyethylene (PE) BS 6515 Standard new residential Full wall width
Bitumen felt (hessian-core) BS 743 Older specification; still used Full wall width
Engineering brick BS EN 771-1 (Class A) Below DPC in high-moisture areas
Lead (Code 4+) BS EN 12588 Complex details, stepped DPCs Full wall width + 100mm laps
Cavity tray Above all openings Full cavity width + stop ends
Slate (two courses) Heritage/listed building repairs Full wall width

Detailed Guidance

Standard DPC Installation in Cavity Walls

  1. Set out DPC level — mark 150mm above external finished ground level on both inner and outer leaves
  2. Install inner leaf DPC first — lay PE or bitumen DPC on a full mortar bed; ensure 100mm laps at all joints, especially at corners (butt-lap with 100mm return)
  3. Install outer leaf DPC — at the same bed joint height; both DPCs at exactly the same level
  4. Check continuity — the DPCs must be at the same course height; a step between inner and outer leaf DPCs creates a potential path for moisture to track around the step
  5. Floor DPM connection — where a solid concrete ground floor is used, the DPM (typically 1200-gauge polythene) must be lapped up and over the wall DPC; this creates the continuous moisture barrier
  6. Suspended timber floor — wall DPC must still be present; it prevents moisture rising from ground level to above the air ventilation space
  7. Cavity continuity — ensure no mortar droppings or debris fall into the cavity during construction; mortar bridges on cavity ties can carry moisture from outer to inner leaf

Cavity Trays Over Openings

Cavity trays are required at:

A cavity tray must:

Common failure: cavity trays installed without stop ends allow water to run along the tray and through the jamb masonry at the side of the window.

DPC on Sloping Ground

Where ground level changes, the DPC must step with it. Rules:

For significant changes in level, consider:

DPC Heights Near Paths and Landscaping

Many DPC failures are caused by landscaping changes after construction:

For any client work near existing walls, check the DPC height above finished level. If the client insists on raised planters or paving that reduces the 150mm clearance, advise in writing. Consider installing a French drain or drainage channel to intercept surface water before it reaches the wall.

Frequently Asked Questions

What is the minimum height for a DPC?

Approved Document C requires 150mm above the finished external ground level. In practice, 150mm is the bare minimum — 225mm is better practice where there is any risk of paving or landscaping being raised in the future. The 150mm rule assumes that ground-level splash-back from rainwater cannot reach above this height; in exposed locations or against gravel-covered ground, higher is safer.

Does a DPC need to be installed in internal partition walls?

No. Internal partition walls that are not in contact with the ground do not require a DPC. However, internal walls immediately adjacent to an external cavity wall should not bridge the external wall's DPC — ensure the internal partition connects to the wall above DPC level.

The render on my wall goes below the DPC — is this a problem?

Yes. Render that extends below the DPC creates a bridge for moisture to travel from below the DPC to above it, bypassing the waterproofing entirely. This is one of the most common causes of rising damp in rendered properties. The render must be cut back to at least 25mm above the DPC level. If the render is flush with the DPC, a UV/moisture-resistant paint does not solve the problem — the render must be physically cut back.

Can I use expanding foam to fill the cavity at DPC level?

No. Expanding foam in the cavity is not an acceptable substitute for a cavity tray. Foam can crack, does not self-seal to the masonry, and may promote mould growth. Install a proper cavity tray system.

Regulations & Standards