Pre-Demolition Audit: Structural Survey, Services Disconnection, Hazardous Material Survey and Waste Audit
Mandatory R&D asbestos survey (Reg 7 CAR 2012/UKAS); structural survey scope; services disconnection (4-8 week lead times); waste audit; Hazardous Waste Consignment Note per consignment (Hazardous Waste Regs 2005)