squote
Knowledge
Home
Login
Try free →
← Knowledge Base
Surveys
16 articles
Chimney & Flue Survey: HETAS Inspection Checklist UK
HETAS/NACS qualifications, CCTV chimney camera survey, BS EN 15287-1 + Approved Document J, flue lining options, DEFRA Smoke Control Areas, CO alarm requirement, chimney fire prevention
Damp Survey: What to Expect & How to Read the Report
PCA Code of Practice 2020, BRE Digest 245, Protimeter + carbide meter diagnostics, distinguishing rising/penetrating/condensation/leak/hygroscopic, BS 5250 condensation
Drainage CCTV Survey: When to Commission & Read the Report
WRc MSCC5 defect coding (CR/FL/D/JX/etc), grade 1-5 severity, push-rod vs tractor camera, build-over agreements Section 106 Water Industry Act, pitch fibre pipe replacement, leak-driven subsidence
Electrical Installation Condition Report (EICR)
EICR per BS 7671:2018+A2:2022; C1/C2/C3/FI codes; PRS Electrical Safety Standards 2020 = mandatory 5-yearly for landlords; remediation within 28 days
Energy Performance Certificate (EPC): UK Ratings & Rules
A-G ratings, SAP/RdSAP methodology, 10-year validity, MEES E minimum landlord obligation tightening to C by 2028, Elmhurst/Stroma DEA accreditation, what improvements actually move the rating
Fire Door Inspection: BS 8214 Compliance Checklist UK
BS 8214:2016 inspection; FDIS Cat 1/2 certification; Fire Safety Regs 2022 6-monthly flat entrance + 3-monthly common doors >11m; £15-40 routine, £80-250 detailed
Japanese Knotweed Survey: RICS Risk Categories & Mortgage Guide
Reynoutria/Fallopia japonica; bamboo-like hollow stems with purple speckles; PCA survey £250-600; RICS 2022 Categories A-D; IBG required by mortgage lenders
New Build Snagging Survey: What's Covered & Who Pays
New-build defects identified for developer fix; £300-600 cost; 2-year NHBC defects period; pre-completion/8-week/22-month optimal timings; NHBC Standards 2025 tolerances
Party Wall Surveyor Role Explained
Party Wall etc. Act 1996 Section 1/2/6 triggers, agreed surveyor vs each-party surveyors, Schedule of Condition, building owner pays fees, 2-month notice for Section 2, FPWS/Pyramus & Thisbe Club
Pre-Purchase Building Survey Checklist UK: What to Inspect
RICS survey + specialist follow-ups (damp, drainage, structural, EICR, gas, asbestos refurb HSG264, chimney, roof), red flags trigger investigation, £600-£2,500 budget, TA6 disclosure
RICS Home Survey Levels 1, 2 & 3: Which Survey to Get UK
RICS Home Survey Standard 2021 Levels 1/2/3, Level 3 (£600-£1,500+) for older/larger/non-standard, traffic light 1-3 ratings, PCA/structural engineer/drainage CCTV follow-ups
Structural Engineer's Report: Cost & When You Need One UK
Structural engineer's report content and cost: CEng required, £400–£900 basic, £1,500–£3,000 full appraisal; investigation, design and specialist reports; subsidence claims, mortgage retentions, Building Control submissions; CPR Part 35 expert witness
Subsidence Investigation: Signs, Survey & Repair Costs UK
Foundation movement diagnosis £600-1.5k; underpinning £15-40k/wall or root removal/drain repair £2-8k; CIRIA C580; insurance £1k excess
Thermal Imaging Surveys: Heat Loss & Damp Detection Guide
IR camera detects surface temperature differences; £180-450 domestic; BS EN 13187:1999; min 10°C differential; identifies missing insulation, air leaks, hidden damp
Ventilation Survey: IAQ Assessment & Part F Compliance
Part F 2021 compliance + IAQ assessment £200-500; CO2/RH data logging £600-1.2k; PAS 2035:2023 mandates pre-retrofit; common defects missing trickle vents, undersized extract
When Do You Need a Structural Engineer? UK Survey Guide
CEng MIStructE/MICE chartered status, investigation vs design report, Eurocodes BS EN 1990-1999, underpinning vs root removal vs resin injection, ICE/IStructE register lookup