How Do You Mist Coat New Plaster? Ratios, Timing and Common Mistakes
Mist coating new plaster: a non-vinyl contract or trade matt thinned 20–40% water by volume (per the can; some premium matts 10–20%) applied only to fully dry plaster (uniform pale pink, 4–7 days for a 2–3 mm skim in a warm ventilated room, 2–3 weeks unheated); why porous gypsum pulls water out of neat paint so the film sits on dust and peels; no PVA, no vinyl silk/soft sheen/kitchen-and-bathroom paint as a mist coat; measured mixing, roller application, reading shiny or powdery patches; special cases (tape-and-joint plasterboard needs a drywall sealer, sand-and-cement render needs 4 weeks and an alkali-resisting primer per BS 6150:2019, lime plaster needs a breathable system, patch repairs feathered 50 mm then whole-wall finish coats, stain blocking); coverage 14–18 m²/l mixed; pricing £8–£14/m² for mist plus two coats vs £6–£10/m² on painted walls.