Flat Roof Dormer Construction: Framing & Flashing Guide
Flat-roof dormer construction: trimmer joists, GRP/lead flashings (Code 4-5), tile-hung cheeks, 1:40 fall, Class B PD volume limits (40m³ terraced / 50m³ semi-detached)
Hip to Gable Loft Conversion: Planning & Floor Area Guide
Hip-to-gable conversion: replace hipped end with vertical gable, +8-15m² floor area, Class B PD if conditions met, lateral restraint at 2m centres, semi-detached only typical
Loft Conversion Building Control: Full Plans vs Notice UK
Building Control submission: Full Plans vs Building Notice, LABC vs Approved Inspector, inspection stages, Completion Certificate critical for resale
Loft Conversion Building Regs: Parts A, B, C, F, K & L
Loft conversion building regulations: Parts A, B, C, F, K, L Approved Documents, Building Notice vs Full Plans submission, inspection points and completion certificate
Loft Conversion Electrics: Part P Compliance & Circuits UK
New circuits per Part P, BS 7671 Amendment 2 RCBO per circuit, mains-wired interlinked smoke alarms (BS 5839-6 Grade D LD2), bathroom zones 0-2
Loft Conversion Fire Escape: Part B Requirements UK Guide
Loft conversion fire escape: protected stair route, FD30 doors, mains-wired interlinked smoke alarms (BS 5839-6 Grade D LD2), escape window dimensions, sprinkler triggers
Loft Conversion Floor Joists: Strengthening & Sizing Guide
New floor joists 47×220 C24 sister-mounted alongside 75×100 ceiling joists, UC203×203 UC46 perimeter steels, 215×215×100 padstones, deflection L/333
Loft Conversion Insulation: Part L U-Values & Warm Roof
Loft conversion insulation: Part L 2022 0.16 W/m²K target, cold roof vs warm roof construction, between-rafter PIR + over-rafter combinations and BS 5250 ventilation
Loft Conversion Permitted Development: Volume & Rules Guide
Loft conversion PD rights: GPDO Class B 40/50m³ volume limits, hip-to-gable, rear dormer, side window obscure-glazing, conservation area and Article 4 restrictions
Loft Conversion Stairs: Part K Headroom, Pitch & Fire Rules
Loft Conversion Structural Design: Beam Sizes & Engineer Guide
Loft conversion structural design: floor joist sizing (75×220 C24 typical), UC23–UC46 steel beams, padstones, trimmers, ridge beam for dormer, chartered engineer requirement
Loft Conversions & Party Wall Act: Notice Requirements UK
Party Wall etc Act 1996: Section 2 notices for steel-beam pocketing, raising party wall, 14-day response, surveyor route, IBG-accepted
Loft En-Suite Plumbing: Gravity vs Macerator & Pressure Guide
Loft plumbing: gravity vs macerator WC, hot water pressure 1.0 bar minimum, vented system pump-boosted, soil pipe 110mm at 1:40 fall, AAV vs vent stack
Loft Stairs Building Regs Part K: Rise, Going & Headroom
Part K stair compliance: 42° max pitch, 220mm max rise, 220mm min going, 2R+G 550-700mm, 2.0m clear headroom (1.9m relaxation 1.5m max)
Mansard Roof Conversion: Planning Permission & Build Guide
Mansard roof conversion: 70-72° front pitch, 17.5-20° top, full planning required, 80-95% floor area gain, £60k-120k+, slate/lead detailing, £14-week typical programme
Velux vs Dormer Loft Conversion: Cost & Planning Guide UK
Velux vs dormer decision: ridge-height 2.5m+ for Velux, dormer adds 8-15m² floor, costs £20-35k vs £35-60k+, Class C vs Class B PD route