Summary
Stairlifts and platform lifts solve the same underlying problem — getting someone with limited mobility safely between floors — but they solve it in fundamentally different ways, and the choice between them is rarely a matter of preference. It's driven by the user's specific mobility needs, whether they use a wheelchair full-time, the physical geometry of the staircase or void available, and the household's budget and funding route. Getting this decision wrong at the assessment stage wastes the client's money and, in the worst case, delivers equipment the user physically cannot use safely.
A stairlift is the right answer for someone who can transfer onto a seat and has enough upper body control to sit safely during transit, but who struggles with the exertion or fall risk of climbing stairs — commonly an older person with reduced mobility, recovering from a hip or knee operation, or with a progressive condition that hasn't yet affected their ability to transfer. A platform lift — either a vertical platform lift travelling in open air (typically for a short rise, such as a half-flight or porch step) or a through-floor lift travelling in an enclosed shaft between two floors — is the right answer for a full-time wheelchair user who cannot or should not transfer out of their chair, or for anyone whose condition means transferring onto a stairlift seat is unsafe or undignified.
This decision sits at the intersection of building regulations guidance (Part M consistently states that a passenger lift or platform lift is the preferred accessible solution over a stairlift, because it doesn't require a transfer), funding rules (the Disabled Facilities Grant, DFG, funds either option based on an Occupational Therapist's recommendation, not the tradesperson's), and practical site constraints — a curved staircase, a narrow stairwell, or the lack of a floor void for a through-floor lift shaft will often make the decision for you before cost even enters the conversation.
Key Facts
- Stairlift standard — BS EN 81-40:2020 covers stairlifts and inclined lifting platforms for persons with impaired mobility; it superseded the earlier BS 5776 specification for powered stairlifts.
- Enclosed platform lift standard — BS EN 81-41:2010 covers vertical lifting platforms with an enclosed liftway (the type used for through-floor lifts).
- Non-enclosed platform lift standard — BS 6440:2011 covers powered lifting platforms with a non-enclosed or partially enclosed liftway, typically used for short-rise external or internal steps; maximum travel under the standard is 3.0m, though most installed units travel considerably less.
- Domestic through-floor lift standard — BS 5900:2012 covers powered home lifts (partially enclosed carriers, no liftway enclosure) for domestic single-occupancy dwellings.
- Building Regulations Part M — states the preferred solution for level access between storeys is a passenger lift; where a full lift isn't feasible, a platform lift is the next preference, with a wheelchair stairlift considered only as a last resort.
- BS 8300:2018 — design of buildings and their approaches to meet the needs of disabled people; sets out dimensional and clearance guidance for both stairlift and platform lift installations.
- Stairlift — straight vs curved — a straight staircase takes an off-the-shelf rail cut to length; any bend, half-landing, or winder tread requires a bespoke rail made to a site template, roughly doubling or tripling the cost and adding 2–6 weeks' lead time.
- Stairlift transfer requirement — the user must be able to transfer from wheelchair/standing onto the stairlift seat at the bottom and off again at the top; this is the single disqualifying factor that rules a stairlift out for many full-time wheelchair users.
- Platform lift — no transfer needed — a wheelchair user drives or is wheeled directly onto the platform and remains in the chair for the whole journey; this is the core reason Part M and BS 8300 favour platform lifts for wheelchair users.
- Through-floor lift structural requirement — needs a floor opening (typically around 1.1m × 1.4m) cut through an existing floor, a headroom void above, and usually a small enclosure or safety gates at both levels — significantly more building work than a stairlift.
- Vertical (non-enclosed) platform lift — suits short rises (a porch step, a half-flight, split-level access) without needing a floor opening; typically the cheaper platform lift option.
- Power supply — both stairlifts and most platform lifts run from a dedicated fused spur or small circuit; battery backup is standard on stairlifts and common on platform lifts so they continue to operate in a power cut.
- Notifiable electrical work — new electrical supply for either lift type is notifiable under Building Regulations Part P and must be certified by a registered competent person.
- Disabled Facilities Grant (DFG) — means-tested, up to £30,000 in England (£36,000 in Wales, higher ceiling in Scotland), can fund either a stairlift or a platform lift where an Occupational Therapist assesses it as necessary and appropriate.
- VAT relief — both can qualify for zero-rating under VAT Act 1994 Schedule 8 Group 12 (disabled persons) or, for stairlifts specifically, under the separate over-60s mobility aids relief (VAT Notice 701/7) — the over-60s relief does not extend to platform/through-floor lifts, which qualify only under the disabled persons' route.
- Weight capacity — standard stairlifts typically rate to around 20–25 stone (127–159kg); platform lifts (rated to carry a wheelchair and occupant) commonly have higher standard capacities, often 300kg+, reflecting the combined weight of chair and user.
Quick Reference Table
Spending too long on quotes? squote turns a 2-minute voice recording into a professional quote.
Try squote free →| Factor | Stairlift | Vertical Platform Lift (short rise) | Through-Floor Platform Lift |
|---|---|---|---|
| Requires transfer from wheelchair | Yes | No | No |
| Typical cost, new (2026) | £2,200–£10,000+ | £5,000–£15,000 | £15,000–£35,000+ |
| Structural work | Minimal (rail fixed to treads) | Minimal to moderate (platform base, guarding) | Significant (floor opening, shaft, headroom void) |
| Suitable for full-time wheelchair user | Rarely | Yes | Yes |
| Typical travel height | Full staircase flight | Up to ~3m (short rise) | Between two full storeys |
| Lead time | 1–2 weeks straight; 2–6 weeks curved | 1–3 weeks | 3–8 weeks (design + build work) |
| Building Regs standard | BS EN 81-40:2020 | BS 6440:2011 | BS EN 81-41:2010 / BS 5900:2012 |
| Part M preference ranking | Last resort | Second preference | Second preference (with passenger lift as first) |
| Ongoing servicing | Annual | Annual | Annual, often with lift maintenance contract |
| Reduces staircase width for other users | Yes | No (separate to stairs) | No (separate to stairs) |
Detailed Guidance
When a stairlift is the right recommendation
A stairlift suits a client who:
- Can transfer safely from a wheelchair, walking frame, or standing position onto a seat, and back off again unaided or with minor assistance
- Has the balance and upper-body control to sit securely for the duration of the journey
- Has fatigue, breathlessness, or fall risk as the primary issue — not an inability to bear weight or transfer at all
- Wants to retain independent use of the staircase alongside other household members (a stairlift shares the stair rather than replacing it)
- Has a budget or funding route (DFG, savings, or family contribution) more suited to the lower stairlift price bracket
The critical failure mode to watch for at survey stage: assessing only the staircase and not the user. A tradesperson or installer should never proceed on a stairlift quote without confirmation — ideally from an Occupational Therapist — that the intended user can safely transfer. Installing a stairlift for someone who cannot transfer wastes the client's money and creates a fall risk at exactly the point (the top or bottom transfer) where the equipment is meant to reduce risk.
When a platform lift is the right recommendation
A platform lift — vertical or through-floor — is the right answer when:
- The user is a full-time or near-full-time wheelchair user who cannot or should not transfer out of the chair
- The household has an existing floor void or is planning building work that can accommodate a shaft opening (for through-floor lifts)
- Building Regulations Part M applies to the project (e.g. a non-domestic building, a new-build accessible dwelling, or a DFG-funded major adaptation) — Part M's guidance hierarchy places platform lifts above stairlifts wherever a passenger lift is genuinely not feasible
- The rise is short (a porch, split-level threshold, or single change of level) — a vertical, non-enclosed platform lift is usually more cost-effective than a through-floor lift for this scenario
- The rise spans a full storey and there's no room for stairs or a passenger lift core — a through-floor lift becomes the only realistic option
Structural and building work differences
This is where the two options diverge most sharply in cost and disruption. A stairlift's structural intervention is limited to fixing the rail into the stair treads (and sometimes the stringer or skirting on longer runs) — the treads and staircase structure must be sound, but no new opening or enclosure is created.
A through-floor lift requires cutting an opening through an existing floor structure — typically around 1.1m × 1.4m, with the exact dimensions set by the specific lift model — plus:
- New structural trimmers around the floor opening, sized by a structural engineer, to replace the joists removed
- A headroom void above the opening on the upper floor sufficient for the lift's travel and overrun
- Safety interlocked gates or enclosure at both the upper and lower landing openings
- Making good the floor, ceiling and any affected walls after installation
- Building Control notification, since a structural floor opening is notifiable work under Approved Document A
A vertical (non-enclosed) platform lift sits between the two in terms of building work — it needs a solid, level base and usually a guarding/enclosure structure around the lift shaft area, but no floor penetration, making it considerably less disruptive than a through-floor lift.
Cost comparison in more detail
| Option | Typical installed cost (2026) | What drives the cost |
|---|---|---|
| Straight stairlift, new | £2,200–£3,800 | Standard rail length, minimal building work |
| Curved stairlift, new | £4,500–£10,000+ | Bespoke-manufactured rail to site template |
| Vertical platform lift, short rise | £5,000–£15,000 | Rise height, guarding/enclosure requirement |
| Through-floor lift, compact 2-person | £12,000–£20,000 | Floor opening, structural trimmers, shaft |
| Through-floor lift, wheelchair-capable | £20,000–£35,000+ | Larger cabin, structural work, finishes |
Both routes can reduce the customer-facing price significantly through VAT zero-rating where the customer qualifies, and both can be wholly or partially funded through the DFG — but the grant is means-tested and capped, so any shortfall between the grant ceiling and total project cost (including any associated building work) falls to the household.
The Occupational Therapist's role — and why the tradesperson shouldn't make this call alone
For DFG-funded work, and as good practice even for privately-funded projects, an Occupational Therapist assessment determines which type of lift is appropriate for the individual's specific mobility needs, not the installer's judgement of "what fits." The OT assessment considers transfer ability, cognitive factors (can the user operate the controls safely and understand the interlocks), weight-bearing capacity, and the layout of the home. A tradesperson quoting this kind of work should always ask whether an OT assessment has taken place and, if it hasn't, recommend the client obtain one — particularly before committing to a stairlift, given how consequential getting that wrong is for someone who genuinely cannot transfer.
Combining or phasing the two
In larger adaptation projects — particularly where a household includes people with different mobility needs, or where a condition is progressive — it isn't unusual to install a stairlift now with a future through-floor lift installation planned into the design (e.g. leaving a floor void un-boarded, or designing a downstairs room that could later become a bedroom with a lift connection). Discussing this trajectory with the client and their OT at the design stage avoids abortive work later.
Frequently Asked Questions
Can a stairlift be retrofitted if the household later needs a platform lift instead?
Yes, but they aren't a straightforward swap — a stairlift removal leaves fixing holes in the treads/stringer to make good, and a subsequent through-floor lift installation is an entirely separate structural project. There's no cost or installation synergy between the two; each is priced and built independently.
Is a platform lift always more expensive than a stairlift?
Not always at the low end — a short-rise vertical platform lift for a porch step or a single half-flight can come in similar to, or even below, a bespoke curved stairlift, because it avoids the cost of a custom-manufactured rail. But for a full storey-to-storey journey, a through-floor lift is reliably more expensive than a stairlift covering the same staircase, because of the structural building work involved.
Does Building Regulations Part M require a platform lift in every adaptation project?
No — Part M applies most directly to non-domestic buildings and new-build/major-renovation dwellings, setting out an accessibility hierarchy (passenger lift preferred, platform lift next, stairlift as a last resort) for designers to follow. In an existing private dwelling being adapted for a specific resident, the practical decision is usually driven by the OT assessment and site constraints rather than a strict regulatory requirement to install a platform lift over a stairlift — but the Part M hierarchy remains the reference point used to justify the choice, particularly on DFG applications.
Do both stairlifts and platform lifts need annual servicing?
Yes — both are mechanical lifting equipment with safety-critical components (obstruction sensors, interlocks, battery backup, drive systems) and manufacturers require annual servicing to maintain the warranty, in addition to being good practice under general work equipment safety principles.
Which option is better for a household with mixed mobility needs (one wheelchair user, one person who can walk but struggles with stairs)?
A platform lift serves the wheelchair user but does nothing for someone who can walk but finds the stairs tiring, since they'd still need to use the platform lift for every journey. In genuinely mixed-need households it's not uncommon to install a stairlift (which the walking household member can bypass by using the stairs normally, and the person needing help can use) alongside separate consideration of the wheelchair user's needs — this is exactly the kind of scenario an OT assessment is designed to untangle, rather than the tradesperson guessing at survey stage.
Regulations & Standards
BS EN 81-40:2020 — safety rules for the construction and installation of stairlifts and inclined lifting platforms for persons with impaired mobility
BS EN 81-41:2010 — safety rules for vertical lifting platforms with enclosed liftway, intended for use by persons with impaired mobility
BS 6440:2011 — specification for powered vertical lifting platforms having non-enclosed or partially enclosed liftways, intended for use by persons with impaired mobility
BS 5900:2012 — specification for powered homelifts with partially enclosed carriers and no liftway enclosures, for use by disabled persons in domestic single-occupancy dwellings
BS 8300:2018 — design of buildings and their approaches to meet the needs of disabled people, code of practice
Building Regulations Approved Document M — access to and use of buildings; sets the accessibility hierarchy referenced when choosing between lift types
Building Regulations Approved Document A — structural requirements for floor openings created for through-floor lifts
Building Regulations Part P — notifiable electrical work for new lift power supplies
Housing Grants, Construction and Regeneration Act 1996 — statutory basis for the Disabled Facilities Grant
VAT Act 1994, Schedule 8, Group 12 — zero-rating for goods and services supplied to disabled persons
HMRC VAT Notice 701/7 — mobility aids for the elderly relief (stairlifts, aged 60+, own home)
GOV.UK — Disabled Facilities Grants — eligibility, means testing, and grant ceilings
GOV.UK — VAT relief for disabled and older people — VAT zero-rating rules for mobility equipment
GOV.UK — Approved Document M: Access to and use of buildings — accessibility hierarchy for lifts
BSI Knowledge — BS 8300:2018 — design guidance for accessible buildings
Foundations (National Body for Home Improvement Agencies) — Disabled Facilities Grant process and OT assessment role
stairlift installation pricing guide — detailed stairlift cost breakdown, straight vs curved pricing, and VAT relief worked example
disability adaptations — Disabled Facilities Grant process, OT assessment, and Part M/BS 8300 detail shared across all accessibility adaptations
part m access — full Approved Document M access requirements referenced by both lift types
building regs part k — stair geometry and guarding rules relevant when assessing an existing staircase for either adaptation